Risk Assessment of Immersed Tube Tunnel Construction

被引:6
|
作者
Dong, Sihui [1 ]
Li, Shiqun [1 ]
Yu, Fei [1 ]
Wang, Kang [1 ]
机构
[1] Dalian Jiaotong Univ, Sch Traff & Transportat Engn, Dalian 116028, Peoples R China
关键词
tunnel construction by immersed tube method; analytic hierarchy process; genetic algorithm; cloud model theory; risk assessment; risk control; QUALITY; DESIGN;
D O I
10.3390/pr11040980
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Due to the complexity of risk factors in constructing immersed tube tunnels, it is impossible to accurately identify risks. To solve this problem, and the uncertainty and fuzziness of risk factors, a risk assessment method for immersed tube tunnel construction was proposed based on WBS-RBS (Work Breakdown Structure-Risk Breakdown Structure), improved AHP (analytic hierarchy process), and cloud model theory. WBS-RBS was used to analyze the risk factors of immersed tube tunnel construction from the aspects of the construction process and 4M1E, and built a more comprehensive and accurate construction risk index system. The weight of each index was calculated by the improved AHP of a genetic algorithm. The cloud model theory was used to build the cloud map of risk assessment for immersed tunnel construction and evaluate construction risk. Taking the Dalian Bay subsea tunnel project as an example, the risk assessment method of immersed tunnel construction was verified. The results showed that this method not only solved the problem of failing the consistency check in the higher-order judgment matrix but also improved the consistency pass rate by 33.3% and accurately reflected the risk assessment results. The assessment results show that the construction risk level of the Dalian Bay submarine-immersed tunnel is medium. The risk level of indicators "slope instability" and "water-stop damage" are high risk, while "pipe section cracking", "low underwater alignment accuracy", "uneven crimping of a water-stop", and "uneven substrate treatment" are medium risk. This provides a reference for the risk assessment study of immersed tunnel construction.
引用
收藏
页数:13
相关论文
共 50 条
  • [41] Construction of the 4th tube of the Elbe Tunnel in Hamburg: The project, risks, risk assessment, analysis of adverse events
    Bielecki, R
    TUNNELS FOR PEOPLE, VOLS 1 AND 2, 1997, : 735 - 742
  • [42] Risk Analysis and Assessment of Shield Tunnel Construction in Karst Area
    Wang, Xiang
    Lu, Haolun
    Su, Wanying
    Zhu, Xiaohui
    2022 8TH INTERNATIONAL CONFERENCE ON HYDRAULIC AND CIVIL ENGINEERING: DEEP SPACE INTELLIGENT DEVELOPMENT AND UTILIZATION FORUM, ICHCE, 2022, : 674 - 680
  • [43] A static risk assessment model for underwater shield tunnel construction
    Wu, Zhiqiang
    Zou, Shuliang
    SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 2020, 45 (01):
  • [44] Theoretical System for the Safety Risk Assessment of Mountain Tunnel Construction
    Xue Y.
    Dong H.
    Li Y.
    Tianjin Daxue Xuebao (Ziran Kexue yu Gongcheng Jishu Ban)/Journal of Tianjin University Science and Technology, 2019, 52 : 84 - 91
  • [45] A static risk assessment model for underwater shield tunnel construction
    Zhiqiang Wu
    Shuliang Zou
    Sādhanā, 2020, 45
  • [46] Risk Assessment Method and Application for Tunnel Lining Demolition Construction
    Li, Lei
    Zhao, Jinpeng
    Fan, Xiaomin
    APPLIED SCIENCES-BASEL, 2023, 13 (21):
  • [47] Risk Assessment of Tunnel Construction Based on Improved Cloud Model
    Lin, C. J.
    Zhang, M.
    Li, L. P.
    Zhou, Z. Q.
    Liu, S.
    Liu, C.
    Li, T.
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2020, 34 (03)
  • [48] Risk assessment on subway tunnel engineering during construction process
    Wang, Jing
    Tan, Yue-Hu
    Wang, Peng-Fei
    Jiang, Wei
    Jiefangjun Ligong Daxue Xuebao/Journal of PLA University of Science and Technology (Natural Science Edition), 2009, 10 (04): : 379 - 383
  • [49] Analysis of construction and post-construction settlement data caused by immersed tunnel
    Wei, G. (weig@zucc.edu.cn), 1600, Academia Sinica (32):
  • [50] Measurements and analysis of settlement caused by the construction of an undersea immersed tunnel
    Wei, Gang
    Qiu, Huijie
    Ding, Zhi
    Wei, Xinjiang
    Xing, Jianjian
    Modern Tunnelling Technology, 2014, 51 (05) : 121 - 128