Risk Assessment of Immersed Tube Tunnel Construction

被引:6
|
作者
Dong, Sihui [1 ]
Li, Shiqun [1 ]
Yu, Fei [1 ]
Wang, Kang [1 ]
机构
[1] Dalian Jiaotong Univ, Sch Traff & Transportat Engn, Dalian 116028, Peoples R China
关键词
tunnel construction by immersed tube method; analytic hierarchy process; genetic algorithm; cloud model theory; risk assessment; risk control; QUALITY; DESIGN;
D O I
10.3390/pr11040980
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Due to the complexity of risk factors in constructing immersed tube tunnels, it is impossible to accurately identify risks. To solve this problem, and the uncertainty and fuzziness of risk factors, a risk assessment method for immersed tube tunnel construction was proposed based on WBS-RBS (Work Breakdown Structure-Risk Breakdown Structure), improved AHP (analytic hierarchy process), and cloud model theory. WBS-RBS was used to analyze the risk factors of immersed tube tunnel construction from the aspects of the construction process and 4M1E, and built a more comprehensive and accurate construction risk index system. The weight of each index was calculated by the improved AHP of a genetic algorithm. The cloud model theory was used to build the cloud map of risk assessment for immersed tunnel construction and evaluate construction risk. Taking the Dalian Bay subsea tunnel project as an example, the risk assessment method of immersed tunnel construction was verified. The results showed that this method not only solved the problem of failing the consistency check in the higher-order judgment matrix but also improved the consistency pass rate by 33.3% and accurately reflected the risk assessment results. The assessment results show that the construction risk level of the Dalian Bay submarine-immersed tunnel is medium. The risk level of indicators "slope instability" and "water-stop damage" are high risk, while "pipe section cracking", "low underwater alignment accuracy", "uneven crimping of a water-stop", and "uneven substrate treatment" are medium risk. This provides a reference for the risk assessment study of immersed tunnel construction.
引用
收藏
页数:13
相关论文
共 50 条
  • [31] Analysis on Additional Pressure of Tube Sidewall of Immersed tube tunnel in Sinking Process of Tube Segment
    Li Yadong
    Mo Haihong
    Chen Junsheng
    APPLIED MECHANICS, MATERIALS AND MECHANICAL ENGINEERING, 2013, 387 : 180 - 184
  • [32] An impact imaging method for monitoring on construction of immersed tube tunnel foundation treated by sand-filling method
    Che, Ailan
    Zhu, Renjie
    Fan, Yanmin
    Feng, Shaokong
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 85 : 1 - 11
  • [33] CONSTRUCTION MECHANICS EFFECT OF SUBMARINE IMMERSED TUBE TUNNEL SUBJECTED TO DIFFERENT PORE PRESSURES BASED ON NUMERICAL ANALYSIS
    Wu Ke
    Fan Qinglai
    Hao Dongxue
    Chen Rong
    Liu Jinlong
    JOURNAL OF THE BALKAN TRIBOLOGICAL ASSOCIATION, 2016, 22 (03): : 2447 - 2453
  • [34] Experimental Investigation on Element Immersing Process of Immersed Tube Tunnel
    周瑜
    谭家华
    杨建民
    张承懿
    China Ocean Engineering, 2001, (04) : 531 - 540
  • [35] Stability Analysis of an Immersed Tube Tunnel Foundation Trench Slope
    Luo, Huafeng
    Wei, Lixin
    Zhao, Tianchi
    Ding, Wenqi
    PROCEEDINGS OF GEOSHANGHAI 2018 INTERNATIONAL CONFERENCE: FUNDAMENTALS OF SOIL BEHAVIOURS, 2018, : 736 - 744
  • [36] Experimental investigation on element immersing process of immersed tube tunnel
    Zhou, Y
    Tan, JH
    Yang, JM
    Zhang, CY
    CHINA OCEAN ENGINEERING, 2001, 15 (04) : 531 - 540
  • [37] Accelerated corrosion of the steel shell of an immersed tube tunnel in seawater
    Gao Q.-Y.
    Cao H.
    Jin W.-L.
    Zhang X.-H.
    Liu Y.-Y.
    Gongcheng Kexue Xuebao/Chinese Journal of Engineering, 2023, 45 (06): : 941 - 948
  • [38] Inspection and repairing examination for the large scale immersed tube tunnel
    Shiraki, T.
    Shimonishi, M.
    Sakurai, H.
    Shimada, S.
    Yui, T.
    Fuse, M.
    Takatsu, S.
    UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 490 - 497
  • [39] Experiments of hydrodynamics and stability of immersed tube tunnel on transportation and immersing
    Zhan, D.X.
    Wang, X.Q.
    Journal of Hydrodynamics, 2001, 13 (02) : 121 - 126
  • [40] IMMERSED TUBE TUNNELS: CONCEPT, DESIGN & CONSTRUCTION.
    Kuesel, Thomas R.
    Civil Engineering Practice, 1986, 1 (01): : 57 - 78