Risk Assessment of Immersed Tube Tunnel Construction

被引:6
|
作者
Dong, Sihui [1 ]
Li, Shiqun [1 ]
Yu, Fei [1 ]
Wang, Kang [1 ]
机构
[1] Dalian Jiaotong Univ, Sch Traff & Transportat Engn, Dalian 116028, Peoples R China
关键词
tunnel construction by immersed tube method; analytic hierarchy process; genetic algorithm; cloud model theory; risk assessment; risk control; QUALITY; DESIGN;
D O I
10.3390/pr11040980
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Due to the complexity of risk factors in constructing immersed tube tunnels, it is impossible to accurately identify risks. To solve this problem, and the uncertainty and fuzziness of risk factors, a risk assessment method for immersed tube tunnel construction was proposed based on WBS-RBS (Work Breakdown Structure-Risk Breakdown Structure), improved AHP (analytic hierarchy process), and cloud model theory. WBS-RBS was used to analyze the risk factors of immersed tube tunnel construction from the aspects of the construction process and 4M1E, and built a more comprehensive and accurate construction risk index system. The weight of each index was calculated by the improved AHP of a genetic algorithm. The cloud model theory was used to build the cloud map of risk assessment for immersed tunnel construction and evaluate construction risk. Taking the Dalian Bay subsea tunnel project as an example, the risk assessment method of immersed tunnel construction was verified. The results showed that this method not only solved the problem of failing the consistency check in the higher-order judgment matrix but also improved the consistency pass rate by 33.3% and accurately reflected the risk assessment results. The assessment results show that the construction risk level of the Dalian Bay submarine-immersed tunnel is medium. The risk level of indicators "slope instability" and "water-stop damage" are high risk, while "pipe section cracking", "low underwater alignment accuracy", "uneven crimping of a water-stop", and "uneven substrate treatment" are medium risk. This provides a reference for the risk assessment study of immersed tunnel construction.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Construction of Yongjiang immersed tube tunnel
    Cai, X
    IMMERSED TUNNEL TECHNIQUES 2, 1997, : 283 - 291
  • [2] Construction of a testing and monitoring system in the hauling of immersed tube tunnel
    Guo, Q. (95207302@qq.com), 1606, Shanghai Jiaotong University (47):
  • [3] The design and construction of temporary works for Limerick Immersed Tube Tunnel
    Smith, A. K. C.
    Thorup, O.
    Hudson, J.
    CHALLENGES AND INNOVATIONS IN GEOTECHNICS: PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON SOIL MECHANICS AND GEOTECHNICAL ENGINEERING, VOL 1, 2013, : 805 - 808
  • [4] Risk Assessment of Operation Period Structural Stability for Long and Large Immersed Tube Tunnel
    Wu, Mengjun
    Zhang, Qi
    Wu, Senyang
    PROCEEDINGS OF 2ND INTERNATIONAL SYMPOSIUM ON SUBMERGED FLOATING TUNNELS AND UNDERWATER TUNNEL STRUCTURES (SUFTUS-2016), 2016, 166 : 266 - 278
  • [5] Deterioration assessment of an immersed-tube road tunnel in Taiwan
    Chou, Yung-Chuan
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-FORENSIC ENGINEERING, 2016, 169 (01) : 6 - 13
  • [6] Numerical study on Sinking Mooring System of Immersed Tube Tunnel Construction
    Qiu Zhengzhong
    Wan Meng
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ADVANCED ENGINEERING MATERIALS AND TECHNOLOGY, 2015, 38 : 230 - 234
  • [7] Hong Kong Airport Railway Western Immersed Tube tunnel - Construction
    Enterkin, H
    Ichise, K
    Bayliss, RF
    IMMERSED TUNNEL TECHNIQUES 2, 1997, : 273 - 282
  • [8] Construction of immersed undersea tube tunnel (Tokyo West Fairway Tunnel) on the very soft ground
    Masuda, T
    Sasaki, E
    Muranaka, T
    COASTAL GEOTECHNICAL ENGINEERING IN PRACTICE, VOL 1, 2000, : 657 - 662
  • [9] Prospects for immersed tube tunnel solutions
    World Tunnelling, 2004, 17 (02): : 80 - 84
  • [10] Construction of immersed tunnel in Osaka Port
    Shishido, T
    Mikami, K
    Adachi, S
    Yuasa, K
    PROCEEDINGS OF THE 1998 INTERNATIONAL SYMPOSIUM ON UNDERWATER TECHNOLOGY, 1998, : 329 - 333