Leanness assessment of a complex assembly line using integrated value stream mapping: a case study

被引:10
|
作者
Sangwa, Narpat Ram [1 ]
Sangwan, Kuldip Singh [2 ]
机构
[1] Indian Inst Management Sirmaur, Area Operat & Supply Chain Management, Paonta Sahib, India
[2] Birla Inst Technol & Sci Pilani, Mech Engn Dept, Pilani, Rajasthan, India
来源
TQM JOURNAL | 2023年 / 35卷 / 04期
关键词
Value stream mapping; Lean; Complex assembly line application of lean; Lean assessment; Integrated VSM; CYCLE TIME REDUCTION; SUPPLY CHAIN; PERFORMANCE; SYSTEMS; VSM; DESIGN;
D O I
10.1108/TQM-12-2021-0369
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose This paper proposes an integrated value stream mapping (VSM) for a complex assembly line to improve the leanness of a complex automotive component manufacturing organization. Design/methodology/approach This study depicts the application of VSM at the case organization, where top management is concerned about the challenges of higher cycle time and lower productivity. Gemba walks were conducted to establish the concept of "walk the flow, create the flow" along the assembly line. The multi-hierarchical cross-functional team developed the current value stream map to know the "as-is" state. Then, the team analysed the current VSM and proposed the future VSM for the "to-be" state. Findings The integrated VSM shows different processes and work cells, various wastes, non-value-added activities, cycle time, uptime and the material and information flows for both products of the assembly line on the same map. The integrated VSM reduced cycle time, non-value-added activities, work in process inventory and improved line efficiency and production per labour hour for both the products, simultaneously. Research limitations/implications The limitation of the study is that the study focussed only on the application of VSM for one complex assembly only. Future research may be conducted using the developed integrated VSM approach in other complex production environments. Practical implications Managers can identify and reduce system waste by incorporating the concept of integrated VSM in a complex production or assembly environment where two or more products are being manufactured/assembled with low similarity. Originality/value The application of VSM for assembly lines is highly challenging because of merging flows, a large number of child parts in the lines and assembly of more than one product on the same line.
引用
收藏
页码:893 / 923
页数:31
相关论文
共 50 条
  • [41] An application of value stream mapping in auto-ancillary industry: a case study
    Jasti, Naga Vamsi Krishna
    Kota, Srinivas
    Sangwan, Kuldip Singh
    TQM JOURNAL, 2020, 32 (01): : 162 - 182
  • [42] Application of Value Stream Mapping in Supply Chain: A Case Study on an Amazon Retail
    Qin, Y.
    Liu, H.
    2021 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM21), 2021, : 213 - 217
  • [43] Defining the metrics for an integrated stream assessment: A case study in the Maryland Piedmont
    Clar, M
    Smith, C
    Victoria, C
    PROTECTION AND RESTORATION OF URBAN AND RURAL STREAMS, 2004, : 165 - 179
  • [44] Application of fuzzy logic for leanness assessment in SMEs: a case study
    Vidyadhar, R.
    Kumar, R. Sudeep
    Vinodh, S.
    Antony, Jiju
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2016, 14 (01) : 78 - 103
  • [45] The Value Stream Mapping in Hospital: The Case of Emergency Department
    Al-Balushi, Shahid
    SUSTAINABLE ECONOMIC GROWTH, EDUCATION EXCELLENCE, AND INNOVATION MANAGEMENT THROUGH VISION 2020, VOLS I-VII, 2017, : 2844 - 2853
  • [46] A new value stream mapping approach for complex production systems
    Braglia, M.
    Carmignani, G.
    Zammori, F.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (18-19) : 3929 - 3952
  • [47] Efficiency enhancement in CNC industry using value stream mapping, work standardization and line balancing
    Nallusamy, S.
    International Journal of Performability Engineering, 2016, 12 (05) : 413 - 422
  • [48] Lean manufacturing implementation using value stream mapping as a tool A case study from auto components industry
    Jasti, Naga Vamsi Krishna
    Sharma, Aditya
    INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2014, 5 (01) : 89 - 116
  • [49] Improving wait times to care for individuals with multimorbidities and complex conditions using value stream mapping
    Sampalli, Tara
    Desy, Michel
    Dhir, Minakshi
    Edwards, Lynn
    Dickson, Robert
    Blackmore, Gail
    INTERNATIONAL JOURNAL OF HEALTH POLICY AND MANAGEMENT, 2015, 4 (07) : 459 - 466
  • [50] Improving quality through value stream mapping: A case study of a physician's clinic
    Lummus, Rhonda R.
    Vokurka, Robert J.
    Rodeghiero, Brad
    TOTAL QUALITY MANAGEMENT & BUSINESS EXCELLENCE, 2006, 17 (08): : 1063 - 1075