Leanness assessment of a complex assembly line using integrated value stream mapping: a case study

被引:10
|
作者
Sangwa, Narpat Ram [1 ]
Sangwan, Kuldip Singh [2 ]
机构
[1] Indian Inst Management Sirmaur, Area Operat & Supply Chain Management, Paonta Sahib, India
[2] Birla Inst Technol & Sci Pilani, Mech Engn Dept, Pilani, Rajasthan, India
来源
TQM JOURNAL | 2023年 / 35卷 / 04期
关键词
Value stream mapping; Lean; Complex assembly line application of lean; Lean assessment; Integrated VSM; CYCLE TIME REDUCTION; SUPPLY CHAIN; PERFORMANCE; SYSTEMS; VSM; DESIGN;
D O I
10.1108/TQM-12-2021-0369
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose This paper proposes an integrated value stream mapping (VSM) for a complex assembly line to improve the leanness of a complex automotive component manufacturing organization. Design/methodology/approach This study depicts the application of VSM at the case organization, where top management is concerned about the challenges of higher cycle time and lower productivity. Gemba walks were conducted to establish the concept of "walk the flow, create the flow" along the assembly line. The multi-hierarchical cross-functional team developed the current value stream map to know the "as-is" state. Then, the team analysed the current VSM and proposed the future VSM for the "to-be" state. Findings The integrated VSM shows different processes and work cells, various wastes, non-value-added activities, cycle time, uptime and the material and information flows for both products of the assembly line on the same map. The integrated VSM reduced cycle time, non-value-added activities, work in process inventory and improved line efficiency and production per labour hour for both the products, simultaneously. Research limitations/implications The limitation of the study is that the study focussed only on the application of VSM for one complex assembly only. Future research may be conducted using the developed integrated VSM approach in other complex production environments. Practical implications Managers can identify and reduce system waste by incorporating the concept of integrated VSM in a complex production or assembly environment where two or more products are being manufactured/assembled with low similarity. Originality/value The application of VSM for assembly lines is highly challenging because of merging flows, a large number of child parts in the lines and assembly of more than one product on the same line.
引用
收藏
页码:893 / 923
页数:31
相关论文
共 50 条
  • [21] Application of Value Stream Mapping (VSM) in a Sewing Line for Improving Overall Equipment Effectiveness (OEE): A Case Study
    Shakil, Shawkat Imam
    Parvez, Mahmud
    INTELLIGENT MANUFACTURING AND ENERGY SUSTAINABILITY, ICIMES 2019, 2020, 169 : 249 - 260
  • [22] Value Stream Mapping with Simulation to Optimize Stock Levels: Case Study
    Midilli, Yunus Emre
    Elevli, Birol
    JORDAN JOURNAL OF MECHANICAL AND INDUSTRIAL ENGINEERING, 2020, 14 (03): : 295 - 302
  • [23] Value stream mapping and lean simulation: a case study in automotive company
    Andrade, P. F.
    Pereira, V. G.
    Del Conte, E. G.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 85 (1-4): : 547 - 555
  • [24] Investigating the effect of value stream mapping on operational losses: a case study
    Dadashnejad, Ali-Asghar
    Valmohammadi, Changiz
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2018, 16 (03) : 478 - 500
  • [25] Lean Manufacturing Implementation Through Value Stream Mapping: A Case Study
    Zahraee, Seyed Mojib
    Hashemi, Ahmad
    Abdi, Ahmed Ali
    Shahpanah, Ataollah
    Rohani, Jafri Mohd
    JURNAL TEKNOLOGI, 2014, 68 (03):
  • [26] Investigating the effect of value stream mapping on procurement effectiveness: a case study
    Jing, Shuwei
    Hou, Kaixuan
    Yan, Junai
    Ho, Zih-Ping
    Han, Lu
    JOURNAL OF INTELLIGENT MANUFACTURING, 2021, 32 (04) : 935 - 946
  • [27] Value stream mapping and lean simulation: a case study in automotive company
    P. F. Andrade
    V. G. Pereira
    E. G. Del Conte
    The International Journal of Advanced Manufacturing Technology, 2016, 85 : 547 - 555
  • [28] Performance Improvement through Value Stream Mapping - A Manufacturing Case Study
    Bugvi, Salman Abubakar
    Hameed, Khurram
    Jamil, M. Fawad
    Irfan, Ali
    Murtaza, Shahid
    Qaiser, Muhammad
    Bilal, Muhammad
    JURNAL KEJURUTERAAN, 2021, 33 (04): : 1007 - 1018
  • [29] Improvement of Manufacturing Process Based on Value Stream Mapping: A Case Study
    Wang, Chia-Nan
    Vo, Tran Thi Bich Chau
    Chung, Yu-Chi
    Amer, Yousef
    Doan, Linh Thi Truc
    ENGINEERING MANAGEMENT JOURNAL, 2024, 36 (03) : 300 - 318
  • [30] Investigating the effect of value stream mapping on procurement effectiveness: a case study
    Shuwei Jing
    Kaixuan Hou
    Junai Yan
    Zih-Ping Ho
    Lu Han
    Journal of Intelligent Manufacturing, 2021, 32 : 935 - 946