Estimating and visualizing the exposure to tower crane operation hazards on construction sites

被引:18
|
作者
Hu, Songbo [1 ]
Fang, Yihai [1 ]
Moehler, Robert [1 ]
机构
[1] Monash Univ, Dept Civil Engn, Clayton, Vic 3800, Australia
关键词
NEAR-MISS; SAFETY; INFORMATION; FATALITIES; BIM; FRAMEWORK; DESIGN;
D O I
10.1016/j.ssci.2022.106044
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
As an increasing number of building components are modularized and prefabricated, tower cranes are required to lift larger and heavier loads. This situation increased the risk of crane failure and the severity of crane accidents, challenging the effectiveness of conventional reactive safety management approaches. Thus, early hazard recognition and proactive control (Prevention through Design, PtD) are necessitated to manage Tower Crane Operation (TCO) hazards. This study proposes an automatic PtD method to manage the Hazard Exposure (HE) brought by one or multiple tower crane operations on construction sites in the construction planning stage by leveraging a path-finding algorithm and Building Information Modelling (BIM)-enabled spatial-temporal analyses. The dynamic distribution of TCO hazards is estimated based on safe and practical lift paths generated by a path-finding algorithm, and visualized as HE heatmaps in BIM models. Three application scenarios of the HE estimation and visualization are explored, including managing critical lifts, improving daily hazard communication on site, and contextualizing scheduling/planning tasks with hazard information. Estimating and visualizing HE in these scenarios are expected to allow planners and safety managers arrange activities and workspaces to minimize the risks of TCO hazards. The contributions of the paper include (1) proposing a generic energy-based quantification model for different types of TCO hazards, (2) increasing the spatial-temporal granularity of the HE estimation and visualization, and (3) promoting proactive controlling measures over the TCO hazards through planning, scheduling, and the coordination of crane operations with other on-site activities.
引用
收藏
页数:17
相关论文
共 50 条
  • [41] Outstanding performance by a Liebherr rotary tower crane during the construction of New Zealand's highest tower structure
    不详
    ZKG INTERNATIONAL, 1998, 51 (02): : A55 - A56
  • [42] RADIATION EXPOSURE HAZARDS ASSOCIATED WITH THE OPERATION OF PARTICLE ACCELERATORS
    SOLON, LR
    MCLAUGHLIN, J
    BLATZ, H
    RADIATION RESEARCH, 1954, 1 (06) : 562 - 562
  • [43] A concise operation safety protection device in arm of tower crane and its parameter design
    Lv, Xiao
    Zhang, Lei
    Kang, Ligui
    Chen, Zhuo
    Xie, Tonghai
    PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON INFORMATION SCIENCES, MACHINERY, MATERIALS AND ENERGY (ICISMME 2015), 2015, 126 : 1814 - 1817
  • [44] Lightning protection scenarios of communication tower sites; human hazards and equipment damage
    Gomes, Chandima
    Galvan Diego, Arturo
    SAFETY SCIENCE, 2011, 49 (10) : 1355 - 1364
  • [45] OCCUPATIONAL NOISE EXPOSURE ON CONSTRUCTION SITES
    UTLEY, WA
    MILLER, LA
    APPLIED ACOUSTICS, 1985, 18 (04) : 293 - 303
  • [46] Physical load exposure at construction sites
    Hartmann, B
    Fleischer, AG
    SCANDINAVIAN JOURNAL OF WORK ENVIRONMENT & HEALTH, 2005, 31 : 88 - 95
  • [47] Dispatching rule design for tower crane scheduling in prefabricated construction via genetic programming
    Yin, Jing
    Wang, Huanhuan
    Li, Jiahao
    Zhang, Zhitian
    Cai, Shunyao
    Liu, Wenjun
    AUTOMATION IN CONSTRUCTION, 2024, 165
  • [48] Optimal Numbers, Locations, and Configurations of Tower Cranes on Construction Sites
    Maindl, Thomas Ihor
    Vogel, Jannik
    OPERATIONS RESEARCH PROCEEDINGS 2021, 2022, : 120 - 126
  • [49] Reducing Safety Risks in Construction Tower Crane Operations: A Dynamic Path Planning Model
    Cai, Binqing
    Ye, Zhukai
    Chen, Shiwei
    Liang, Xun
    APPLIED SCIENCES-BASEL, 2024, 14 (22):
  • [50] Rotating tower crane for the construction of the Werra valley bridge near Hann in Munich.
    Riedig, F
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1936, 80 : 1142 - 1142