Reducing Safety Risks in Construction Tower Crane Operations: A Dynamic Path Planning Model

被引:0
|
作者
Cai, Binqing [1 ]
Ye, Zhukai [1 ]
Chen, Shiwei [1 ]
Liang, Xun [2 ]
机构
[1] Fujian Univ Technol, Sch Management, Fuzhou 350118, Peoples R China
[2] Renmin Univ China, Sch Informat Technol, Beijing 100872, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2024年 / 14卷 / 22期
关键词
construction; tower crane; safety risks; path planning; TC-DWA; IDENTIFICATION;
D O I
10.3390/app142210599
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Tower cranes are the most used equipment in construction projects, and the path planning of tower crane operations directly affects the safety performance of construction projects. Traditional tower crane operations rely on only the driving experience and manual path planning of crane operators. Poor judgement and bad path planning may increase safety risks and even cause severe construction safety accidents. To reduce safety risks in construction tower crane operations, this research proposes a dynamic path planning model for tower crane operations based on computer vision technology and dynamic path planning algorithms. The proposed model consists of three modules: first, a path information collection module preprocessing the video data to capture relevant operational path information; second, a path safety risk evaluation module employing You Only Look Once version 8 (YOLOv8) instance segmentation to identify potential risk factors along the operational path, e.g., potential drop zones and the positions of nearby workers; and finally, a path planning module utilizing an improved Dynamic Window Approach for tower cranes (TC-DWA) to avoid risky areas and optimize the operational path for enhanced safety. A prototype based on the theoretical model was constructed and tested on actual construction projects. Through experimental scenarios, it was found that each tower crane operation poses safety risks to 3-4 workers on average, and the proposed prototype can significantly reduce the safety risks of dropped loads from tower crane operations affecting ground workers and important equipment. A comparison between the proposed model and other regular algorithms was also conducted, and the results show that compared with traditional RRT and APF algorithms, the proposed model reduces the average maximum collision times by 50. This research provides a theoretical model and a preliminary prototype to provide dynamic path planning and reduce safety risks in tower crane operations. Future research will be conducted from the aspects of multiple device monitoring and system optimization to increase the analysis speed and accuracy, as well as on human-computer interactions between tower crane operators and the path planning guidance model.
引用
收藏
页数:20
相关论文
共 50 条
  • [1] Crane safety operations in modular integrated construction
    Ali, Ali Hassan
    Zayed, Tarek
    Hussein, Mohamed
    AUTOMATION IN CONSTRUCTION, 2024, 164
  • [2] Tower crane safety in the construction industry: A Hong Kong study
    Tam, Vivian W. Y.
    Fung, Ivan W. H.
    SAFETY SCIENCE, 2011, 49 (02) : 208 - 215
  • [3] Integrated reinforcement and imitation learning for tower crane lift path planning
    Wang, Zikang
    Huang, Chun
    Yao, Boqiang
    Li, Xin
    AUTOMATION IN CONSTRUCTION, 2024, 165
  • [4] Automatic Planning for Cable Crane Operations in Concrete Dam Construction
    Wang, Hao
    Yang, Qigui
    Liu, Quan
    Zhao, Chunju
    Zhou, Wei
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (12)
  • [5] Tower crane safety on construction sites: A complex sociotechnical system perspective
    Zhou, Wei
    Zhao, Tingsheng
    Liu, Wen
    Tang, Jingjing
    SAFETY SCIENCE, 2018, 109 : 95 - 108
  • [6] Factors that affect safety of tower crane installation/dismantling in construction industry
    Shin, In Jae
    SAFETY SCIENCE, 2015, 72 : 379 - 390
  • [7] Multi-criteria decision making model for tower crane operations
    Hassan, F.M.F.
    Marzouk, M.M.
    Hassan, F.M.F. (eng_fathy_hassan@yahoo.com), 1600, Cairo University (67): : 159 - 181
  • [8] Priority rating logic simulation model for tower crane operations management
    PCL Industrial Constructors Inc., Bldg. #4, 5402-99 Street, Edmonton, Alta. T6E 3N7, Canada
    不详
    不详
    不详
    J. Construct. Res., 2006, 1-2 (133-147):
  • [9] Working time optimal planning of construction site served by a single tower crane
    Allan Tubaileh
    Journal of Mechanical Science and Technology, 2016, 30 : 2793 - 2804
  • [10] Working time optimal planning of construction site served by a single tower crane
    Tubaileh, Allan
    JOURNAL OF MECHANICAL SCIENCE AND TECHNOLOGY, 2016, 30 (06) : 2793 - 2804