Reducing Safety Risks in Construction Tower Crane Operations: A Dynamic Path Planning Model

被引:0
|
作者
Cai, Binqing [1 ]
Ye, Zhukai [1 ]
Chen, Shiwei [1 ]
Liang, Xun [2 ]
机构
[1] Fujian Univ Technol, Sch Management, Fuzhou 350118, Peoples R China
[2] Renmin Univ China, Sch Informat Technol, Beijing 100872, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2024年 / 14卷 / 22期
关键词
construction; tower crane; safety risks; path planning; TC-DWA; IDENTIFICATION;
D O I
10.3390/app142210599
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Tower cranes are the most used equipment in construction projects, and the path planning of tower crane operations directly affects the safety performance of construction projects. Traditional tower crane operations rely on only the driving experience and manual path planning of crane operators. Poor judgement and bad path planning may increase safety risks and even cause severe construction safety accidents. To reduce safety risks in construction tower crane operations, this research proposes a dynamic path planning model for tower crane operations based on computer vision technology and dynamic path planning algorithms. The proposed model consists of three modules: first, a path information collection module preprocessing the video data to capture relevant operational path information; second, a path safety risk evaluation module employing You Only Look Once version 8 (YOLOv8) instance segmentation to identify potential risk factors along the operational path, e.g., potential drop zones and the positions of nearby workers; and finally, a path planning module utilizing an improved Dynamic Window Approach for tower cranes (TC-DWA) to avoid risky areas and optimize the operational path for enhanced safety. A prototype based on the theoretical model was constructed and tested on actual construction projects. Through experimental scenarios, it was found that each tower crane operation poses safety risks to 3-4 workers on average, and the proposed prototype can significantly reduce the safety risks of dropped loads from tower crane operations affecting ground workers and important equipment. A comparison between the proposed model and other regular algorithms was also conducted, and the results show that compared with traditional RRT and APF algorithms, the proposed model reduces the average maximum collision times by 50. This research provides a theoretical model and a preliminary prototype to provide dynamic path planning and reduce safety risks in tower crane operations. Future research will be conducted from the aspects of multiple device monitoring and system optimization to increase the analysis speed and accuracy, as well as on human-computer interactions between tower crane operators and the path planning guidance model.
引用
收藏
页数:20
相关论文
共 50 条
  • [41] Safety optimizing strategies for local path planning in dynamic environments
    Basu, A
    Elnagar, A
    INTERNATIONAL JOURNAL OF ROBOTICS & AUTOMATION, 1995, 10 (04): : 130 - 142
  • [42] Virtual reality supported interactive tower crane layout planning for high-rise modular integrated construction
    Zhang, Zhiqian
    Pan, Wei
    AUTOMATION IN CONSTRUCTION, 2021, 130
  • [43] Virtual reality supported interactive tower crane layout planning for high-rise modular integrated construction
    Zhang, Zhiqian
    Pan, Wei
    Automation in Construction, 2021, 130
  • [44] Real-time Nonlinear Model Predictive Path-Following Control of a Laboratory Tower Crane
    Boeck, Martin
    Kugi, Andreas
    IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, 2014, 22 (04) : 1461 - 1473
  • [45] Optimized multi-tower crane layout planning: determine height, location and type to improve operational safety
    Ahmadnia, Mahdi
    Ghanbari, Reza
    Maghrebi, Mojtaba
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2025,
  • [46] Quantifying the human element of safety in airport tower operations: Overcoming risks introduced by static airport characteristics
    Berry, Katherine
    Sawyer, Micahel
    Hinson, Jordan
    Dewalt, Lori
    6TH INTERNATIONAL CONFERENCE ON APPLIED HUMAN FACTORS AND ERGONOMICS (AHFE 2015) AND THE AFFILIATED CONFERENCES, AHFE 2015, 2015, 3 : 2960 - 2966
  • [47] Integrative Model for Quantitative Evaluation of Safety on Construction Sites with Tower Cranes
    Shapira, Aviad
    Simcha, Meir
    Goldenberg, Marat
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (11) : 1281 - 1293
  • [48] Dynamic Path Planning Model for Intelligent Air Vehicle
    Chen, Zhuo
    Zhang, Jie
    Ni, Weijun
    PROCEEDINGS OF 2020 IEEE 4TH INFORMATION TECHNOLOGY, NETWORKING, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (ITNEC 2020), 2020, : 1884 - 1889
  • [49] Model Predictive Control for an AUV with Dynamic Path Planning
    Shen, Chao
    Shi, Yang
    Buckham, Brad
    2015 54TH ANNUAL CONFERENCE OF THE SOCIETY OF INSTRUMENT AND CONTROL ENGINEERS OF JAPAN (SICE), 2015, : 475 - 480
  • [50] Dynamic Path Planning Algorithm Based on an Optimization Model
    Zhang, Jingjing
    Hu, Hongning
    Wan, Yuting
    SIGNAL AND INFORMATION PROCESSING, NETWORKING AND COMPUTERS (ICSINC), 2019, 550 : 105 - 114