Reducing Safety Risks in Construction Tower Crane Operations: A Dynamic Path Planning Model

被引:0
|
作者
Cai, Binqing [1 ]
Ye, Zhukai [1 ]
Chen, Shiwei [1 ]
Liang, Xun [2 ]
机构
[1] Fujian Univ Technol, Sch Management, Fuzhou 350118, Peoples R China
[2] Renmin Univ China, Sch Informat Technol, Beijing 100872, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2024年 / 14卷 / 22期
关键词
construction; tower crane; safety risks; path planning; TC-DWA; IDENTIFICATION;
D O I
10.3390/app142210599
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Tower cranes are the most used equipment in construction projects, and the path planning of tower crane operations directly affects the safety performance of construction projects. Traditional tower crane operations rely on only the driving experience and manual path planning of crane operators. Poor judgement and bad path planning may increase safety risks and even cause severe construction safety accidents. To reduce safety risks in construction tower crane operations, this research proposes a dynamic path planning model for tower crane operations based on computer vision technology and dynamic path planning algorithms. The proposed model consists of three modules: first, a path information collection module preprocessing the video data to capture relevant operational path information; second, a path safety risk evaluation module employing You Only Look Once version 8 (YOLOv8) instance segmentation to identify potential risk factors along the operational path, e.g., potential drop zones and the positions of nearby workers; and finally, a path planning module utilizing an improved Dynamic Window Approach for tower cranes (TC-DWA) to avoid risky areas and optimize the operational path for enhanced safety. A prototype based on the theoretical model was constructed and tested on actual construction projects. Through experimental scenarios, it was found that each tower crane operation poses safety risks to 3-4 workers on average, and the proposed prototype can significantly reduce the safety risks of dropped loads from tower crane operations affecting ground workers and important equipment. A comparison between the proposed model and other regular algorithms was also conducted, and the results show that compared with traditional RRT and APF algorithms, the proposed model reduces the average maximum collision times by 50. This research provides a theoretical model and a preliminary prototype to provide dynamic path planning and reduce safety risks in tower crane operations. Future research will be conducted from the aspects of multiple device monitoring and system optimization to increase the analysis speed and accuracy, as well as on human-computer interactions between tower crane operators and the path planning guidance model.
引用
收藏
页数:20
相关论文
共 50 条
  • [21] Hybrid dynamic substructure synthetic based safety discriminant method for tower crane
    Wang, Weijia
    Liu, Chengyi
    Wang, Yonghua
    PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2011, : 194 - 200
  • [22] Construction Safety Monitoring and Finite Element Analysis on the Supporting System of Tower Crane in Guangzhou West-Tower
    Deng, Hao
    Xu, Jin
    ICIC 2009: SECOND INTERNATIONAL CONFERENCE ON INFORMATION AND COMPUTING SCIENCE, VOL 4, PROCEEDINGS: MODELLING AND SIMULATION IN ENGINEERING, 2009, : 69 - +
  • [23] Collaborative Governance of Tower Crane Safety in the Chinese Construction Industry: A Social Network Perspective
    Yang, Ying
    Shao, Bo
    Jin, Lianghai
    Zheng, Xiazhong
    BUILDINGS, 2022, 12 (06)
  • [24] Occupational Health and Safety in Modular Integrated Construction projects: The case of crane operations
    Mohandes, Saeed Reza
    Abdelmageed, Sherif
    Hem, Sakda
    Yoo, Joo Sang
    Abhayajeewa, Tharindu
    Zayed, Tarek
    JOURNAL OF CLEANER PRODUCTION, 2022, 342
  • [25] Mixed integer programming for dynamic tower crane and storage area optimization on construction sites
    Riga, Katrin
    Jahr, Katrin
    Thielen, Clemens
    Borrmann, André
    Jahr, Katrin (katrin.jahr@tum.de), 1600, Elsevier B.V., Netherlands (120):
  • [26] Mixed integer programming for dynamic tower crane and storage area optimization on construction sites
    Riga, Katrin
    Jahr, Katrin
    Thielen, Clemens
    Borrmann, Andre
    AUTOMATION IN CONSTRUCTION, 2020, 120
  • [27] Unmanned aircraft path planning for construction safety inspections
    Yu, Liangcheng
    Huang, Merit M.
    Jiang, Suwen
    Wang, Chen
    Wu, Mabao
    AUTOMATION IN CONSTRUCTION, 2023, 154
  • [28] GA optimization model for solving tower crane location problem in construction sites
    Abdelmegid, Mohammed Adel
    Shawki, Khaled Mohamed
    Abdel-Khalek, Hesham
    ALEXANDRIA ENGINEERING JOURNAL, 2015, 54 (03) : 519 - 526
  • [29] Dynamical modelling of boom tower crane rigging systems: model selection for construction
    Johns, Brandon
    Abdi, Elahe
    Arashpour, Mehrdad
    ARCHIVES OF CIVIL AND MECHANICAL ENGINEERING, 2023, 23 (03)
  • [30] Critical considerations on tower crane layout planning for high-rise modular integrated construction
    Zhang, Zhiqian
    Pan, Wei
    Pan, Mi
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (07) : 2615 - 2634