Minimizing total completion time in large-sized pharmaceutical quality control scheduling

被引:3
|
作者
Martins, Miguel S. E. [1 ]
Viegas, Joaquim L. [1 ]
Coito, Tiago [1 ]
Firme, Bernardo [1 ]
Costigliola, Andrea [2 ]
Figueiredo, Joao [1 ]
Vieira, Susana M. [1 ]
Sousa, Joao M. C. [1 ]
机构
[1] Univ Lisbon, IDMEC, Inst Super Tecn, Lisbon, Portugal
[2] Hov Farmaciencia, Lisbon, SA, Portugal
关键词
Scheduling; Heuristics; Dual resource constrained scheduling; Quality control laboratory; DUAL-RESOURCE CONSTRAINTS; JOB; OPTIMIZATION; SUBJECT; SEARCH; MODEL;
D O I
10.1007/s10732-023-09509-8
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper proposes an algorithm for the effective scheduling of analytical chemistry tests in the context of quality control for pharmaceutical manufacturing. The problem is formulated as an extension of a dual resource constrained flexible job shop scheduling problem for the allocation of both machines and analysts resources for analytical laboratory work of real dimensions. The formulation is novel and custom made to fit real quality control laboratory. The novelty comes from allowing multiple analyst interventions for each machine allocation while minimising the total completion time, formulated as a mixed integer linear programming model. A three-level dynamic heuristic is proposed to solve the problem efficiently for instances representative of real world schedules. The CPLEX solver and a Tabu Search algorithm are used for comparison. Results show that the heuristic is competitive with the other strategies for medium-sized instances while outperforming them for large-sized instances. The dynamic heuristic runs in a very short amount of time, making it suitable for real world environments. This work is valuable for the development of laboratory management solutions for quality control as it presents a way to provide automatic scheduling of resources.
引用
收藏
页码:177 / 206
页数:30
相关论文
共 50 条
  • [31] Minimizing the total completion time for the TFT-Array factory scheduling problem (TAFSP)
    Lee, A. H. I.
    Chung, S. H.
    Huang, C. Y.
    COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2007, PT 1, PROCEEDINGS, 2007, 4705 : 767 - +
  • [32] A PTAS for Minimizing Total Completion Time of Batch Scheduling Under Tree Precedence Constraints
    Ma Ran
    Han Xuefeng
    2009 WASE INTERNATIONAL CONFERENCE ON INFORMATION ENGINEERING, ICIE 2009, VOL II, 2009, : 361 - 363
  • [33] An algorithm for a no-wait flowshop scheduling problem for minimizing total tardiness with a constraint on total completion time
    Allahverdi, Ali
    Aydilek, Harun
    Aydilek, Asiye
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2022, 13 (01) : 43 - 50
  • [34] Quality of move-optimal schedules for minimizing total weighted completion time
    Brueggemann, Tobias
    Hurink, Johann L.
    Kern, Walter
    OPERATIONS RESEARCH LETTERS, 2006, 34 (05) : 583 - 590
  • [35] Minimizing total flow time and total completion time with immediate dispatching
    Avrahami, Nir
    Azar, Yossi
    ALGORITHMICA, 2007, 47 (03) : 253 - 268
  • [36] Minimizing Total Flow Time and Total Completion Time with Immediate Dispatching
    Nir Avrahami
    Yossi Azar
    Algorithmica, 2007, 47 : 253 - 268
  • [37] MINIMIZING COMPLETION-TIME FOR A CLASS OF SCHEDULING PROBLEMS
    FAIGLE, U
    SCHRADER, R
    INFORMATION PROCESSING LETTERS, 1984, 19 (01) : 27 - 29
  • [38] Minimizing Average Coflow Completion Time with Decentralized Scheduling
    Luo, Shouxi
    Yu, Hongfang
    Zhao, Yangming
    Wu, Bin
    Wang, Sheng
    Li, Le Min
    2015 IEEE INTERNATIONAL CONFERENCE ON COMMUNICATIONS (ICC), 2015, : 307 - 312
  • [39] Innovative Optimization Algorithms for Large-Sized Industrial Scheduling Problems
    Fuchigami, Helio Yochihiro
    Abreu, Alex Paranahyba
    BRAZILIAN ARCHIVES OF BIOLOGY AND TECHNOLOGY, 2024, 67
  • [40] Minimizing total completion time in the no-wait jobshop scheduling problem using a backtracking metaheuristic
    Ying, Kuo-Ching
    Lin, Shih-Wei
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 169