共 50 条
- [31] Minimizing the total completion time for the TFT-Array factory scheduling problem (TAFSP) COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2007, PT 1, PROCEEDINGS, 2007, 4705 : 767 - +
- [32] A PTAS for Minimizing Total Completion Time of Batch Scheduling Under Tree Precedence Constraints 2009 WASE INTERNATIONAL CONFERENCE ON INFORMATION ENGINEERING, ICIE 2009, VOL II, 2009, : 361 - 363
- [36] Minimizing Total Flow Time and Total Completion Time with Immediate Dispatching Algorithmica, 2007, 47 : 253 - 268
- [38] Minimizing Average Coflow Completion Time with Decentralized Scheduling 2015 IEEE INTERNATIONAL CONFERENCE ON COMMUNICATIONS (ICC), 2015, : 307 - 312