Minimizing total completion time in large-sized pharmaceutical quality control scheduling

被引:3
|
作者
Martins, Miguel S. E. [1 ]
Viegas, Joaquim L. [1 ]
Coito, Tiago [1 ]
Firme, Bernardo [1 ]
Costigliola, Andrea [2 ]
Figueiredo, Joao [1 ]
Vieira, Susana M. [1 ]
Sousa, Joao M. C. [1 ]
机构
[1] Univ Lisbon, IDMEC, Inst Super Tecn, Lisbon, Portugal
[2] Hov Farmaciencia, Lisbon, SA, Portugal
关键词
Scheduling; Heuristics; Dual resource constrained scheduling; Quality control laboratory; DUAL-RESOURCE CONSTRAINTS; JOB; OPTIMIZATION; SUBJECT; SEARCH; MODEL;
D O I
10.1007/s10732-023-09509-8
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper proposes an algorithm for the effective scheduling of analytical chemistry tests in the context of quality control for pharmaceutical manufacturing. The problem is formulated as an extension of a dual resource constrained flexible job shop scheduling problem for the allocation of both machines and analysts resources for analytical laboratory work of real dimensions. The formulation is novel and custom made to fit real quality control laboratory. The novelty comes from allowing multiple analyst interventions for each machine allocation while minimising the total completion time, formulated as a mixed integer linear programming model. A three-level dynamic heuristic is proposed to solve the problem efficiently for instances representative of real world schedules. The CPLEX solver and a Tabu Search algorithm are used for comparison. Results show that the heuristic is competitive with the other strategies for medium-sized instances while outperforming them for large-sized instances. The dynamic heuristic runs in a very short amount of time, making it suitable for real world environments. This work is valuable for the development of laboratory management solutions for quality control as it presents a way to provide automatic scheduling of resources.
引用
收藏
页码:177 / 206
页数:30
相关论文
共 50 条
  • [21] Semi-online Scheduling for Minimizing the Total Completion Time with Known Release Dates
    Nouinou, H.
    Arbaoui, T.
    Yalaoui, A.
    IFAC PAPERSONLINE, 2021, 54 (01): : 653 - 658
  • [22] The price of fairness for a two-agent scheduling game minimizing total completion time
    Yubai Zhang
    Zhao Zhang
    Zhaohui Liu
    Journal of Combinatorial Optimization, 2022, 44 : 2104 - 2122
  • [23] A lower bound for minimizing the total completion time of a three-agent scheduling problem
    Shiau, Yau-Ren
    Lee, Wen-Chiung
    Kung, Yu-Sheng
    Wang, Jen-Ya
    INFORMATION SCIENCES, 2016, 340 : 305 - 320
  • [24] Group scheduling with controllable setup and processing times: Minimizing total weighted completion time
    Ng, CT
    Cheng, TCE
    Janiak, A
    Kovalyov, MY
    ANNALS OF OPERATIONS RESEARCH, 2005, 133 (1-4) : 163 - 174
  • [25] Minimizing the total completion time in a single-machine scheduling problem with a learning effect
    Low, Chinyao
    Lin, Wen-Yi
    APPLIED MATHEMATICAL MODELLING, 2011, 35 (04) : 1946 - 1951
  • [26] A new heuristic for minimizing total completion time objective in permutation flow shop scheduling
    Laha, Dipak
    Chakravorty, Arindam
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 53 (9-12): : 1189 - 1197
  • [27] Group Scheduling with Controllable Setup and Processing Times: Minimizing Total Weighted Completion Time
    C. T. Ng
    T. C. Edwin Cheng
    Adam Janiak
    Mikhail Y. Kovalyov
    Annals of Operations Research, 2005, 133 : 163 - 174
  • [28] Minimizing total completion time for re-entrant flow shop scheduling problems
    Jing, Caixia
    Huang, Wanzhen
    Tang, Guochun
    THEORETICAL COMPUTER SCIENCE, 2011, 412 (48) : 6712 - 6719
  • [29] The price of fairness for a two-agent scheduling game minimizing total completion time
    Zhang, Yubai
    Zhang, Zhao
    Liu, Zhaohui
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2022, 44 (03) : 2104 - 2122
  • [30] A new heuristic for minimizing total completion time objective in permutation flow shop scheduling
    Dipak Laha
    Arindam Chakravorty
    The International Journal of Advanced Manufacturing Technology, 2011, 53 : 1189 - 1197