Availability contracts under hierarchical maintenance

被引:2
|
作者
Patra, Pradipta [1 ]
Kumar, U. Dinesh [2 ]
机构
[1] Indian Inst Management Sirmaur, Paonta Sahib, Himachal Prades, India
[2] Indian Inst Management Bangalore, Bannerghatta Rd, Bangalore 560076, India
关键词
Maintenance; Replacement; Reliability; Optimization; Availability contract; Performance based contracting; PERFORMANCE-BASED CONTRACTS; INVENTORY SYSTEM; PARTS LOGISTICS; SPARE PARTS; RELIABILITY; POLICIES; DESIGN;
D O I
10.1007/s10479-023-05504-1
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Availability contracting is a prominent procurement strategy among many defense and other capital equipment suppliers and their customers. Under availability contracting, the revenue generated for a service provider is a function of equipment/system availability over the predetermined contract period. A major challenge in implementing availability contracting is predicting the availability of equipment, defining the target availability, and determining the best contract duration based on the target availability. In this paper, we extend the classical operational availability model for estimating equipment availability under hierarchical maintenance, which is frequently used for complex equipment such as aircraft. Under an availability contract, bounds have been proposed on system-level operational availability. The current study also develops optimization models for finding the optimal availability contract duration under different scenarios: stochastic and non-stochastic contract durations; contract written at parts level, system level; minimizing total maintenance costs with minimum level of target operational availability as a constraint etc. The study also shows that the optimal contract duration is a non-decreasing function of spares on hand, and the inherent availability of system part. The results from the study have been validated using numerical study with both simulated and real data.
引用
收藏
页码:389 / 423
页数:35
相关论文
共 50 条
  • [31] Assessing maintenance contracts when preventive maintenance is outsourced
    Wu, Shaomin
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2012, 98 (01) : 66 - 72
  • [32] Availability and Maintenance Modeling for GIS Equipment Served in High-Speed Railway Under Incomplete Maintenance
    Wang, Qi
    He, Zhengyou
    Lin, Sheng
    Liu, Yilu
    IEEE TRANSACTIONS ON POWER DELIVERY, 2018, 33 (05) : 2143 - 2151
  • [33] Development of Maintenance and Rehabilitation Program Pavement Assets Under Performance-Based Contracts
    Alyami, Zaid
    Tighe, Susan L.
    TRANSPORTATION RESEARCH RECORD, 2013, (2361) : 1 - 10
  • [34] Optimization of fuel contracts management and maintenance scheduling for thermal plants under price uncertainty
    Chabar, R. M.
    Pereira, M. V. F.
    Granville, S.
    Barroso, L. A.
    Iliadis, N. A.
    2006 IEEE/PES POWER SYSTEMS CONFERENCE AND EXPOSITION. VOLS 1-5, 2006, : 923 - +
  • [35] A multiobjective model for maximizing fleet availability under the presence of flight and maintenance requirements
    Kozanidis, George
    Journal of Advanced Transportation, 2009, 43 (02): : 155 - 182
  • [36] Dynamic Scheduling of Intelligent Group Maintenance Planning under Usage Availability Constraint
    Chen, Yi
    Ma, Xiaobing
    Wei, Fanping
    Yang, Li
    Qiu, Qingan
    MATHEMATICS, 2022, 10 (15)
  • [37] Maintenance in availability of weapon systems under combat operation-optimization possibilities
    Smal, T.
    SAFETY AND RELIABILITY: METHODOLOGY AND APPLICATIONS, 2015, : 1167 - 1176
  • [38] Optimal availability of failure-prone systems under imperfect maintenance actions
    Samet, Slah
    Chelbi, Anis
    Ben Hmida, Faycal
    JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2010, 16 (04) : 395 - +
  • [39] Optimal Buffer Inventory for Maintenance Action Under Random Production Capacity Availability
    Zhang, Yan
    Gong, Shi-Yu
    Sheng, Jing-Yu
    2012 INTERNATIONAL CONFERENCE ON QUALITY, RELIABILITY, RISK, MAINTENANCE, AND SAFETY ENGINEERING (ICQR2MSE), 2012, : 400 - 404
  • [40] SIMULATION-BASED ANALYSIS OF DEVICE AVAILABILITY UNDER THREE MAINTENANCE STRATEGIES
    Prosser, Alexander
    Wijayalath, Lakshika Dilshan
    TRANSYLVANIAN INTERNATIONAL CONFERENCE IN PUBLIC ADMINISTRATION, 2018, : 403 - 412