Availability contracts under hierarchical maintenance

被引:2
|
作者
Patra, Pradipta [1 ]
Kumar, U. Dinesh [2 ]
机构
[1] Indian Inst Management Sirmaur, Paonta Sahib, Himachal Prades, India
[2] Indian Inst Management Bangalore, Bannerghatta Rd, Bangalore 560076, India
关键词
Maintenance; Replacement; Reliability; Optimization; Availability contract; Performance based contracting; PERFORMANCE-BASED CONTRACTS; INVENTORY SYSTEM; PARTS LOGISTICS; SPARE PARTS; RELIABILITY; POLICIES; DESIGN;
D O I
10.1007/s10479-023-05504-1
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Availability contracting is a prominent procurement strategy among many defense and other capital equipment suppliers and their customers. Under availability contracting, the revenue generated for a service provider is a function of equipment/system availability over the predetermined contract period. A major challenge in implementing availability contracting is predicting the availability of equipment, defining the target availability, and determining the best contract duration based on the target availability. In this paper, we extend the classical operational availability model for estimating equipment availability under hierarchical maintenance, which is frequently used for complex equipment such as aircraft. Under an availability contract, bounds have been proposed on system-level operational availability. The current study also develops optimization models for finding the optimal availability contract duration under different scenarios: stochastic and non-stochastic contract durations; contract written at parts level, system level; minimizing total maintenance costs with minimum level of target operational availability as a constraint etc. The study also shows that the optimal contract duration is a non-decreasing function of spares on hand, and the inherent availability of system part. The results from the study have been validated using numerical study with both simulated and real data.
引用
收藏
页码:389 / 423
页数:35
相关论文
共 50 条
  • [21] Empirical risk assessment of maintenance costs under full-service contracts
    Deprez, Laurens
    Antonio, Katrien
    Boute, Robert
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 304 (02) : 476 - 493
  • [22] Research on Equipment Maintenance Pricing Model under Performance-based Contracts
    Zhang, Chengyi
    Lin, Mingchi
    CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, : 629 - 635
  • [23] CT SERVICING AND MAINTENANCE CONTRACTS
    WANKLING, PF
    PHYSICS IN MEDICINE AND BIOLOGY, 1987, 32 (08): : 1071 - 1071
  • [24] GAS TURBINE MAINTENANCE CONTRACTS
    PIETRUCH.WJ
    COMBUSTION, 1970, 41 (08): : 34 - &
  • [25] SOFTWARE MAINTENANCE-CONTRACTS
    HAGEGE, C
    ANNALES DE BIOLOGIE CLINIQUE, 1988, 46 (07) : 503 - 503
  • [26] Negotiating ERP maintenance contracts
    Moore, J
    CHEMICAL ENGINEERING PROGRESS, 2004, 100 (05) : 16 - 16
  • [27] Availability modelling for periodically inspected systems under mixed maintenance policies
    Li Junliang
    Chen Yueliang
    Zhang Yong
    Zhang Zhuzhu
    Fan Weijie
    JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2021, 32 (03) : 722 - 730
  • [28] Availability modelling for periodically inspected systems under mixed maintenance policies
    LI Junliang
    CHEN Yueliang
    ZHANG Yong
    ZHANG Zhuzhu
    FAN Weijie
    Journal of Systems Engineering and Electronics, 2021, 32 (03) : 722 - 730
  • [29] Use of nested renewals to model availability under opportunistic maintenance policies
    Degbotse, AT
    Nachlas, JA
    ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2003 PROCEEDINGS, 2003, : 344 - 350
  • [30] Availability optimisation for stochastic degrading systems under imperfect preventive maintenance
    Khatab, A.
    Ait-Kadi, D.
    Rezg, N.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (14) : 4132 - 4141