Availability contracts under hierarchical maintenance

被引:2
|
作者
Patra, Pradipta [1 ]
Kumar, U. Dinesh [2 ]
机构
[1] Indian Inst Management Sirmaur, Paonta Sahib, Himachal Prades, India
[2] Indian Inst Management Bangalore, Bannerghatta Rd, Bangalore 560076, India
关键词
Maintenance; Replacement; Reliability; Optimization; Availability contract; Performance based contracting; PERFORMANCE-BASED CONTRACTS; INVENTORY SYSTEM; PARTS LOGISTICS; SPARE PARTS; RELIABILITY; POLICIES; DESIGN;
D O I
10.1007/s10479-023-05504-1
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Availability contracting is a prominent procurement strategy among many defense and other capital equipment suppliers and their customers. Under availability contracting, the revenue generated for a service provider is a function of equipment/system availability over the predetermined contract period. A major challenge in implementing availability contracting is predicting the availability of equipment, defining the target availability, and determining the best contract duration based on the target availability. In this paper, we extend the classical operational availability model for estimating equipment availability under hierarchical maintenance, which is frequently used for complex equipment such as aircraft. Under an availability contract, bounds have been proposed on system-level operational availability. The current study also develops optimization models for finding the optimal availability contract duration under different scenarios: stochastic and non-stochastic contract durations; contract written at parts level, system level; minimizing total maintenance costs with minimum level of target operational availability as a constraint etc. The study also shows that the optimal contract duration is a non-decreasing function of spares on hand, and the inherent availability of system part. The results from the study have been validated using numerical study with both simulated and real data.
引用
收藏
页码:389 / 423
页数:35
相关论文
共 50 条
  • [1] Cross-organizational service maintenance using temporal availability specification and contracts
    von Susani, O
    Dugerdil, P
    ICSM 2005: PROCEEDINGS OF THE 21ST IEEE INTERNATIONAL CONFERENCE ON SOFTWARE MAINTENANCE, 2005, : 230 - 239
  • [2] Optimal post-warranty maintenance contracts for wind turbines considering availability
    Zheng, Rui
    Zhang, Yingzhi
    Gu, Liudong
    INTERNATIONAL JOURNAL OF GREEN ENERGY, 2020, 17 (07) : 373 - 381
  • [3] The Availability in the UAE of Liens to Secure Payment under Construction Contracts
    Brendel, Neal R.
    Barrette, Amy L.
    El-Riachi, Wadih
    ARAB LAW QUARTERLY, 2010, 24 (03) : 309 - 317
  • [4] Optimizing maintenance service contracts under imperfect maintenance and a finite time horizon
    Pascual, R.
    Godoy, D.
    Figueroa, H.
    APPLIED STOCHASTIC MODELS IN BUSINESS AND INDUSTRY, 2013, 29 (05) : 564 - 577
  • [5] Investigation of system transient availability under imperfect maintenance
    Alaswad, Suzan
    Salman, Sinan
    INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2024, 41 (02) : 656 - 673
  • [6] A generic model of equipment availability under imperfect maintenance
    Cassady, CR
    Iyoob, IM
    Schneider, K
    Pohl, EA
    IEEE TRANSACTIONS ON RELIABILITY, 2005, 54 (04) : 564 - 571
  • [7] Repairable systems availability optimization under imperfect maintenance
    Samet, S.
    Chelbi, A.
    Hmida, F. B.
    BULLETIN OF THE POLISH ACADEMY OF SCIENCES-TECHNICAL SCIENCES, 2009, 57 (03) : 249 - 256
  • [8] Availability of deteriorating system under inspection and maintenance strategies
    Hajeeh, Mohammed
    Moustafa, Magdi S.
    International Journal of Reliability and Safety, 2009, 3 (04) : 384 - 396
  • [9] Estimation and Optimization for System Availability Under Preventive Maintenance
    Raghav, Yashpal Singh
    Mradula
    Varshney, Rahul
    Modibbo, Umar Muhammad
    Ahmadini, Abdullah Ali H.
    Ali, Irfan
    IEEE ACCESS, 2022, 10 : 94337 - 94353
  • [10] FACTORS IN MAINTENANCE CONTRACTS
    OTTO, CC
    HOSPITALS, 1975, 49 (06): : 139 - 140