A Short-Term Hydropower Scheduling Model Considering Constraint Priorities

被引:2
|
作者
Wu, Xinyu [1 ]
Wu, Yiyang [1 ]
Cheng, Xilong [2 ]
Cheng, Chuntian [1 ]
Li, Zehong [3 ]
Wu, Yongqi [3 ]
机构
[1] Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China
[2] Yunhe Henan Informat Technol Co Ltd, Zhengzhou 450000, Peoples R China
[3] Guizhou Qianyuan Power Co Ltd, Guiyang 550000, Peoples R China
基金
中国国家自然科学基金;
关键词
Cascade hydropower stations; Constraint grading; Peak shaving; Mixed-integer linear programming; UNIT COMMITMENT; OPERATION;
D O I
10.1061/JWRMD5.WRENG-6015
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Models for short-term optimal scheduling of hydropower stations should consider complex cascade constraints, hydropower station constraints, and unit operation constraints, all of which are inextricably linked. In practical scheduling, schedulers cannot be certain that the constraints they set based on their preferences are necessarily feasible, potentially leading to a no-solution situation. When the model has no solution, it is time-consuming to find conflicting constraints, and it is difficult to take the importance of different constraints into account, which will seriously affect the efficiency of day-ahead planning of hydropower stations. To solve the problem, a constraint grading model for short-term optimal scheduling of cascade hydropower stations is proposed in this paper. In both the flood and dry seasons, the model transforms five violable constraints into soft constraints and ranks them according to their importance, respectively. If the model has no solution, the soft constraints with low importance are automatically violated to obtain a feasible solution. The application example of Beipan cascade demonstrates that this model can effectively solve the problem of conflicting constraints. Moreover, compared with the penalty function method, this model can ensure that more important soft constraints are not violated.
引用
收藏
页数:15
相关论文
共 50 条
  • [41] Study on optimization of the short-term operation of cascade hydropower stations by considering output error
    Wang, Liping
    Wang, Boquan
    Zhang, Pu
    Liu, Minghao
    Li, Chuangang
    JOURNAL OF HYDROLOGY, 2017, 549 : 326 - 339
  • [42] Short-term Scheduling Algorithm of Hydropower Cascade System Adapted to Different Optimization Models
    Zhang G.
    Zheng H.
    Liu S.
    Wang J.
    Dianwang Jishu/Power System Technology, 2020, 44 (01): : 230 - 237
  • [43] Modelling Tunnel Network Flow and Minimum Pressure Height in Short-Term Hydropower Scheduling
    Aaslid, Per
    Skjelbred, Hans Ivar
    Bale, Sigri Scott
    PROCEEDINGS OF THE 6TH INTERNATIONAL WORKSHOP ON HYDRO SCHEDULING IN COMPETITIVE ELECTRICITY MARKETS, 2019, : 62 - 68
  • [44] Short-term optimal scheduling of cascaded hydropower stations based on sequential quadratic programming
    Wu, Jiekang
    Tang, Li
    Han, Junfeng
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2010, 30 (SUPPL.): : 43 - 48
  • [45] Study of the scheduling rules of short-term power generation dispatching for single hydropower station
    Ji, Chang-ming
    Xie, Wei
    Yang, Zi-jun
    Zhang, Xiao-xing
    Zhu, Xin-liang
    2012 INTERNATIONAL CONFERENCE ON INDUSTRIAL CONTROL AND ELECTRONICS ENGINEERING (ICICEE), 2012, : 1412 - 1416
  • [46] Short-term Hydropower Scheduling with Gamma Inflows Using CVaR and Monte Carlo Simulation
    Quan, Yi
    He, Li
    He, Ming
    2014 SEVENTH INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND DESIGN (ISCID 2014), VOL 2, 2014,
  • [47] Short-term operation scheduling of a hydropower plant in the day-ahead electricity market
    Perez-Diaz, Juan I.
    Wilhelmi, Jose R.
    Angel Sanchez-Fernandez, Jose
    ELECTRIC POWER SYSTEMS RESEARCH, 2010, 80 (12) : 1535 - 1542
  • [48] Short-term optimal scheduling of cascade hydropower plants with reverse-regulating effects
    Su, Chengguo
    Wang, Peilin
    Yuan, Wenlin
    Wu, Yang
    Jiang, Feng
    Wu, Zening
    Yan, Denghua
    RENEWABLE ENERGY, 2022, 199 : 395 - 406
  • [49] A short-term optimal scheduling model for wind-solar-hydro hybrid generation system with cascade hydropower considering regulation reserve and spinning reserve requirements
    Xie, Jun
    Zheng, Yimin
    Pan, Xueping
    Zheng, Yuan
    Zhang, Liqin
    Zhan, Yongsheng
    Xie, Jun (jxie@hhu.edu.cn), 1600, Institute of Electrical and Electronics Engineers Inc. (09): : 10765 - 10777
  • [50] A Short-Term Optimal Scheduling Model for Wind-Solar-Hydro Hybrid Generation System With Cascade Hydropower Considering Regulation Reserve and Spinning Reserve Requirements
    Xie, Jun
    Zheng, Yimin
    Pan, Xueping
    Zheng, Yuan
    Zhang, Liqin
    Zhan, Yongsheng
    IEEE ACCESS, 2021, 9 : 10765 - 10777