A Short-Term Hydropower Scheduling Model Considering Constraint Priorities

被引:2
|
作者
Wu, Xinyu [1 ]
Wu, Yiyang [1 ]
Cheng, Xilong [2 ]
Cheng, Chuntian [1 ]
Li, Zehong [3 ]
Wu, Yongqi [3 ]
机构
[1] Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China
[2] Yunhe Henan Informat Technol Co Ltd, Zhengzhou 450000, Peoples R China
[3] Guizhou Qianyuan Power Co Ltd, Guiyang 550000, Peoples R China
基金
中国国家自然科学基金;
关键词
Cascade hydropower stations; Constraint grading; Peak shaving; Mixed-integer linear programming; UNIT COMMITMENT; OPERATION;
D O I
10.1061/JWRMD5.WRENG-6015
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Models for short-term optimal scheduling of hydropower stations should consider complex cascade constraints, hydropower station constraints, and unit operation constraints, all of which are inextricably linked. In practical scheduling, schedulers cannot be certain that the constraints they set based on their preferences are necessarily feasible, potentially leading to a no-solution situation. When the model has no solution, it is time-consuming to find conflicting constraints, and it is difficult to take the importance of different constraints into account, which will seriously affect the efficiency of day-ahead planning of hydropower stations. To solve the problem, a constraint grading model for short-term optimal scheduling of cascade hydropower stations is proposed in this paper. In both the flood and dry seasons, the model transforms five violable constraints into soft constraints and ranks them according to their importance, respectively. If the model has no solution, the soft constraints with low importance are automatically violated to obtain a feasible solution. The application example of Beipan cascade demonstrates that this model can effectively solve the problem of conflicting constraints. Moreover, compared with the penalty function method, this model can ensure that more important soft constraints are not violated.
引用
收藏
页数:15
相关论文
共 50 条
  • [21] The feasibility analysis of short-term scheduling for joint operation of hydropower and photoelectric
    Ming, Bo
    Huang, Qiang
    Wang, Yimin
    Fang, Wei
    Xie, Xiaoping
    Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2015, 36 (11): : 2731 - 2737
  • [22] Short-term Optimal Hydrothermal Scheduling with Power Flow Constraint
    Lin, Shuang
    Huang, Jian
    Zhang, Jingrui
    Tang, Qinghui
    Qiu, Weixia
    2015 27TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2015, : 1189 - 1194
  • [23] Short-term operation model for coupled hydropower reservoirs
    Teegavarapu, Ramesh S.V.
    Simonovic, Slobodan P.
    Journal of Water Resources Planning and Management, 2000, 126 (02) : 98 - 106
  • [24] Short-term operation model for coupled hydropower reservoirs
    Teegavarapu, RSV
    Simonovic, SP
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 2000, 126 (02): : 98 - 106
  • [25] Short-term hydro scheduling of a variable speed pumped storage hydropower plant considering head loss in a shared penstock
    Kong, J.
    Skjelbred, H. I.
    Abgottspon, H.
    29TH IAHR SYMPOSIUM ON HYDRAULIC MACHINERY AND SYSTEMS, 2019, 240
  • [26] Short-term combined dispatching model of hydro-thermal power considering abandoned hydropower value
    Zhang Z.
    Wu X.
    Cheng C.
    Huang K.
    Liu H.
    Wu J.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2022, 42 (11): : 78 - 85
  • [27] Short-term Multiproduct Batch Scheduling Considering Storage Features
    Wu, Ouyang
    Ave, Giancarlo Dalle
    Harjunkoski, Iiro
    Bouaswaig, Ala
    Schneider, Stefan Marco
    Roth, Matthias
    Imsland, Lars
    IFAC PAPERSONLINE, 2020, 53 (02): : 11794 - 11799
  • [28] An MILP Model for Short-term Peak Shaving Operation of Cascaded Hydropower Plants Considering Unit Commitment
    Su, Chengguo
    Cheng, Chuntian
    Wang, Peilin
    2018 IEEE INTERNATIONAL CONFERENCE ON ENVIRONMENT AND ELECTRICAL ENGINEERING AND 2018 IEEE INDUSTRIAL AND COMMERCIAL POWER SYSTEMS EUROPE (EEEIC / I&CPS EUROPE), 2018,
  • [29] A SHORT-TERM PRODUCTION PLANNING AND SCHEDULING MODEL
    POURBABAI, B
    ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1989, 18 (02): : 159 - 167
  • [30] Handling state dependent nonlinear tunnel flows in short-term hydropower scheduling
    Belsnes, MM
    Roynstrand, J
    Fosso, OB
    2004 International Conference on Power System Technology - POWERCON, Vols 1 and 2, 2004, : 1410 - 1415