Construction and demolition waste generation prediction and spatiotemporal analysis: a case study in Sichuan, China

被引:10
|
作者
Hu, Qidan [1 ,2 ]
Liu, Rongsheng [2 ]
Su, Peiyan [1 ]
Huang, Jun [3 ]
Peng, Ying [1 ]
机构
[1] Sichuan Univ, Coll Architecture & Environm, MOE Key Lab Deep Earth Sci & Engn, Chengdu 610065, Peoples R China
[2] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Kowloon, Hong Kong, Peoples R China
[3] Sichuan Univ, Coll Business, Chengdu 610065, Peoples R China
关键词
Construction and demolition waste; Waste prediction; ARIMA; Spatiotemporal analysis; SYSTEM DYNAMICS MODEL; HIGHRISE BUILDINGS;
D O I
10.1007/s11356-022-25062-6
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The rapidly increased generation of construction and demolition (C & D) waste hinders the sustainable development of cities. Establishing an effective C & D waste management system is of great importance for achieving sustainable development goals. The quantification and prediction of C & D waste, forming the basis of waste management, are worthy of further exploration. C & D waste generation is time series data in which future waste generation is closely correlated with past ones. This study proposes a time-series waste prediction framework to predict C & D waste generation with less data volume by coupling generation rate calculation (GRC) and autoregressive integrated moving average (ARIMA) model. It is demonstrated in Sichuan, China, as a case study. The prediction result reveals that C & D waste generation in Sichuan shows an overall increasing trend, and the waste is mainly generated in the central of Sichuan. Chengdu accounts for over 40% of the total generation in the province, followed by Luzhou, Nanchong, and Mianyang. C & D waste generation shows a significant continual rise in Yibin and Zigong. Overall, most cities in Sichuan have issued related policies and tried to strengthen control over the transportation phase. This study provides an alternative to predict and analyze C & D waste generation from spatiotemporal perspectives. It enriches the C & D waste generation data and provides quantification support for C & D waste management at the regional level.
引用
收藏
页码:41623 / 41643
页数:21
相关论文
共 50 条
  • [41] Preliminary study for the management of construction and demolition waste
    Kourmpanis, B.
    Papadopoulos, A.
    Moustakas, K.
    Stylianou, M.
    Haralambous, K. J.
    Loizidou, M.
    WASTE MANAGEMENT & RESEARCH, 2008, 26 (03) : 267 - 275
  • [42] Spatiotemporal changes of landslide susceptibility in response to rainfall and its future prediction - A case study of Sichuan Province, China
    Zheng, Hao
    Ding, Mingtao
    ECOLOGICAL INFORMATICS, 2024, 84
  • [43] Generation and management of construction and demolition waste in Greece - an existing challenge
    Fatta, D
    Papadopoulos, A
    Avramikos, E
    Sgourou, E
    Moustakas, K
    Kourmoussis, F
    Mentzis, A
    Loizidou, M
    RESOURCES CONSERVATION AND RECYCLING, 2003, 40 (01) : 81 - 91
  • [44] Construction and demolition waste generation in cities in India: an integrated approach
    Jain, Sourabh
    Singhal, Shaleen
    Jain, Nikunj Kumar
    INTERNATIONAL JOURNAL OF SUSTAINABLE ENGINEERING, 2019, 12 (05) : 333 - 340
  • [45] Estimation of construction and demolition waste using waste generation rates in Chennai, India
    Ram, V. G.
    Kalidindi, Satyanarayana N.
    WASTE MANAGEMENT & RESEARCH, 2017, 35 (06) : 610 - 617
  • [46] Unveiling Construction and Demolition Waste Dynamics: A Case Study of the Building Construction Sector in Sri Lanka
    Rathnayake, R. M. L. D.
    Madushantha, R. M. L.
    Gunawardana, W. A. P. C. P.
    Dissanayake, P. B. R.
    ENGINEER-JOURNAL OF THE INSTITUTION OF ENGINEERS SRI LANKA, 2024, 57 (04): : 47 - 54
  • [47] Recycling of construction and demolition waste for producing new construction material (Brazil case-study)
    Contreras, M.
    Teixeira, S. R.
    Lucas, M. C.
    Lima, L. C. N.
    Cardoso, D. S. L.
    da Silva, G. A. C.
    Gregorio, G. C.
    de Souza, A. E.
    dos Santos, A.
    CONSTRUCTION AND BUILDING MATERIALS, 2016, 123 : 594 - 600
  • [48] Lifecycle assessment on construction and demolition waste management-an Indian case study
    Devaki, H.
    Shanmugapriya, S.
    CLEAN TECHNOLOGIES AND ENVIRONMENTAL POLICY, 2024,
  • [49] CHALLENGES IN ASSESSING ECOLOGICAL IMPACTS OF CONSTRUCTION AND DEMOLITION WASTE ON WETLANDS: A CASE STUDY
    Staunton, J.
    Williams, C. D.
    Mc Donnell, R. J.
    Fleming, G. T. A.
    Henry, T.
    Gormally, M. J.
    APPLIED ECOLOGY AND ENVIRONMENTAL RESEARCH, 2014, 12 (02): : 457 - 479
  • [50] Assessment of Public Opposition to Construction and Demolition Waste Facilities: A Case Study in Australia
    Ghafoor, Soheila
    Shooshtarian, Salman
    Maqsood, Tayyab
    Wong, Peter S. P.
    RECYCLING, 2022, 7 (05)