Lifecycle assessment on construction and demolition waste management-an Indian case study

被引:0
|
作者
Devaki, H. [1 ]
Shanmugapriya, S. [1 ]
机构
[1] Coimbatore Inst Technol, Dept Civil Engn, Coimbatore 641014, Tamil Nadu, India
关键词
Lifecycle assessment; Construction and demolition waste; C&D waste recycling plant; Sensitivity analysis; Environmental impacts; Waste management; ENVIRONMENTAL-ANALYSIS; CONCRETE; SYSTEMS; LCA;
D O I
10.1007/s10098-024-02948-2
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Generation of construction & demolition (C&D) waste is increasing while management of it is a global issue. This study presents the case of Coimbatore, a city in India which lacks C&D waste processing facilities. Lifecycle assessment (LCA) being a crucial tool for analyzing and making decisions pertaining to environmental issues, LCA is employed to assess the environmental impacts of C&D waste management practices in the chosen study area and find alternate solutions. Thus, various scenarios are developed: S1-Current Scenario (present and future case), S2-Recycling scenario and S3-Recycling along with inclusion of transfer station and environmental impacts are assessed. LCA results show that scenario S3- Recycling along with transfer station is the most appropriate case for handling C&D waste in the study region. Impact reduction of around 220-158% are observed with respect to "human health and ecosystem quality" categories respectively along with 165% reduction in "climate change" and 134% reduction in "resources depletion" when compared to current landfilling scenario. Sensitivity analysis is also done by varying parameters like transportation distances, electricity and diesel consumption, results showed that the transportation distance has more influence on the outcome. Thus, inclusion of transfer station and construction of C&D waste recycling plant is highly recommended in the study area for proper C&D waste management.
引用
收藏
页数:19
相关论文
共 50 条
  • [1] Construction and Demolition Waste Management: A Case Study on Romania
    Dragan, Gabriela
    Marinoiu, Ana Maria
    Voicu-Dorobantu, Roxana
    ENERGY PROBLEMS AND ENVIRONMENTAL ENGINEERING, 2009, : 482 - +
  • [2] Construction and Demolition Waste Management (Tehran Case Study)
    Broujeni, Babak Rouhi
    Omrani, Ghassem Ali
    Naghavi, Reza
    Afraseyabi, Salar S.
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2016, 6 (06) : 1249 - 1252
  • [3] Life cycle assessment of construction and demolition waste management systems: a Spanish case study
    Irma T. Mercante
    María D. Bovea
    Valeria Ibáñez-Forés
    Alejandro P. Arena
    The International Journal of Life Cycle Assessment, 2012, 17 : 232 - 241
  • [4] Life cycle assessment of construction and demolition waste management: a case study of Mashhad, Iran
    Zakerhosseini, Atusa
    Abdoli, Mohammad Ali
    Molayzahedi, Seyed Mohammadali
    Salmi, Fatemeh Kiani
    ENVIRONMENT DEVELOPMENT AND SUSTAINABILITY, 2024, 26 (10) : 25717 - 25743
  • [5] Life cycle assessment of construction and demolition waste management systems: a Spanish case study
    Mercante, Irma T.
    Bovea, Maria D.
    Ibanez-Fores, Valeria
    Arena, Alejandro P.
    INTERNATIONAL JOURNAL OF LIFE CYCLE ASSESSMENT, 2012, 17 (02): : 232 - 241
  • [6] Sustainability assessment of Construction and Demolition Waste management applied to an Italian case
    Iodice, Silvia
    Garbarino, Elena
    Cerreta, Maria
    Tonini, Davide
    WASTE MANAGEMENT, 2021, 128 : 83 - 98
  • [7] An overview of construction and demolition waste management in Canada: a lifecycle analysis approach to sustainability
    Yeheyis, Muluken
    Hewage, Kasun
    Alam, M. Shahria
    Eskicioglu, Cigdem
    Sadiq, Rehan
    CLEAN TECHNOLOGIES AND ENVIRONMENTAL POLICY, 2013, 15 (01) : 81 - 91
  • [8] An overview of construction and demolition waste management in Canada: a lifecycle analysis approach to sustainability
    Muluken Yeheyis
    Kasun Hewage
    M. Shahria Alam
    Cigdem Eskicioglu
    Rehan Sadiq
    Clean Technologies and Environmental Policy, 2013, 15 : 81 - 91
  • [9] Effective construction and demolition waste management assessment through waste management hierarchy; a case of Australian large construction companies
    Kabirifar, Kamyar
    Mojtahedi, Mohammad
    Wang, Cynthia Changxin
    Tam, Vivian W. Y.
    JOURNAL OF CLEANER PRODUCTION, 2021, 312
  • [10] Life cycle assessment of construction and demolition waste management
    Butera, Stefania
    Christensen, Thomas H.
    Astrup, Thomas F.
    WASTE MANAGEMENT, 2015, 44 : 196 - 205