Development and application of an integrated system of dewatering and recharge for the deep foundation pit

被引:1
|
作者
Zhang, Zhenjie [1 ,2 ]
Zeng, Chunpin [1 ,2 ]
Zhang, Enzhong [1 ,2 ]
Su, Qingwei [1 ,2 ]
Li, Min [1 ,2 ]
Gong, Liang [1 ,2 ]
Geng, Fuqiang [1 ,2 ]
Zhang, Zhigang [1 ,2 ]
机构
[1] Shandong Prov Bur Geol & Mineral Resources, Inst Hydrogeol & Engn Geol 801, Jinan 250014, Peoples R China
[2] Shandong Engn Res Ctr Environm Protect & Remediat, Jinan 250014, Peoples R China
关键词
Groundwater recharge; Dewatering; An integrated system; Recharge test; Recharge pressure; Recharge volume; FLOW; SIMULATION; WELL;
D O I
10.1007/s13201-023-02066-2
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
A large amount of pumping in the deep foundation pit will reduce the groundwater level and lead to surface cracking, building settlement, ground collapse and spring water cut-off. And the groundwater recharge is a good control measure. An integrated system of dewatering and recharge for the deep foundation pit is developed, and it is mainly composed of a pumping system, an assembled water tank, a variable frequency pressure system, a cleaning and filtering system, a recharge pressure tank, a recharge well system and a central control system. This system can realize intelligent automatic control according to the monitoring data. It does not require staff to operate on site and can be remotely adjusted by computer or mobile phone. Taking a subway station under construction in Jinan as the background, the single well recharge test and the multiple wells recharge test were carried out. It can be found that with the increase of recharge pressure, the recharge volume gradually increases, but the increasing trend is smaller and smaller. The relationship between the groundwater level and the recharge volume is a logarithmic function. Blindly increasing recharge wells may not improve the overall reinjection volume, and the relationship between the number of recharge wells, the diameter of reinjection pipes and the maximum recharge capacity of the variable frequency pressure system needs to be comprehensively considered.
引用
收藏
页数:10
相关论文
共 50 条
  • [31] Laboratory test on the effect of foundation pit dewatering
    Wang X.
    Yang T.
    Xu Y.
    Yuan Y.
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2019, 50 (11): : 2823 - 2830
  • [32] OBSERVATIONS AND EXPERIENCES DURING DEWATERING OF A FOUNDATION PIT
    SZABO, G
    ACTA TECHNICA ACADEMIAE SCIENTIARUM HUNGARICAE, 1969, 64 (1-2): : 13 - &
  • [33] Application of multi-layer dewatering and vertical recharge system in dewatering for underground works
    Kohsaka, N
    Miyake, N
    GROUND WATER UPDATES, 2000, : 465 - 466
  • [34] Dewatering of a 32.55 m Deep Foundation Pit in MAMA Under Leakage Risk Conditions
    Jianxiu Wang
    Xiaotian Liu
    Jiaxing Liu
    Linbo Wu
    Qingfeng Guo
    Qian Yang
    KSCE Journal of Civil Engineering, 2018, 22 : 2784 - 2801
  • [35] Dewatering forecast of deep foundation pit considering waterproof curtain using analytic approach
    Gao Xu
    Guo Jian-bo
    Yan E-chuan
    ROCK AND SOIL MECHANICS, 2018, 39 (04) : 1431 - 1439
  • [36] Numerical evaluation of a 70-m deep hydropower station foundation pit dewatering
    Jianxiu Wang
    Yansheng Deng
    Xiaobo Wang
    Xiaotian Liu
    Nianqing Zhou
    Environmental Earth Sciences, 2022, 81
  • [37] Numerical evaluation of a 70-m deep hydropower station foundation pit dewatering
    Wang, Jianxiu
    Deng, Yansheng
    Wang, Xiaobo
    Liu, Xiaotian
    Zhou, Nianqing
    ENVIRONMENTAL EARTH SCIENCES, 2022, 81 (14)
  • [38] Dewatering of a 32.55 m Deep Foundation Pit in MAMA Under Leakage Risk Conditions
    Wang, Jianxiu
    Liu, Xiaotian
    Liu, Jiaxing
    Wu, Linbo
    Guo, Qingfeng
    Yang, Qian
    KSCE JOURNAL OF CIVIL ENGINEERING, 2018, 22 (08) : 2784 - 2801
  • [39] Object-oriented model and development of deep foundation pit monitoring system
    Zhang, Youliang
    Chen, Congxin
    Liu, Xiaowei
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2000, 19 (SUPPL.): : 1061 - 1064
  • [40] Application of monitoring technology in deep foundation pit engineering
    Tong, Zhineng
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON CIVIL, TRANSPORTATION AND ENVIRONMENT, 2016, 78 : 244 - 247