Risk-based inspection (RBI) of a gas pressure reduction station

被引:4
|
作者
Babaeian, A. [1 ]
Eslami, A. [1 ]
Ashrafizadeh, F. [1 ]
Golozar, M. A. [1 ]
Samadzadeh, M. [2 ]
Abbasian, F. [3 ]
机构
[1] Isfahan Univ Technol, Dept Mat Engn, Esfahan 8415683111, Iran
[2] Pars Oil & Gas Co POGC, Bushehr, Iran
[3] Isfahan Gas Co, Esfahan, Iran
关键词
Corrosion management; Corrosion rate; Risk-based inspection (RBI); Probability of failure (POF); Consequence of failure (COF); FLY-ASH; CORROSION; STRENGTH;
D O I
10.1016/j.jlp.2023.105100
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
One of the principles of corrosion management is proper inspection methodology, and in particular the risk-based inspection (RBI). Occasionally a large percentage of the total risk of a unit is concentrated in a small part of the equipment, which can be reduced by using risk management techniques. In this study, a semi-quantitative riskbased inspection method has been performed in a gas station with for its components (pipelines, filters, etc.), to identify the existing damage mechanisms and also to rank its equipment in terms of inspection intervals. In this regard, RBI was performed for the gas station which consisted of phases (Phase A & Phase B) with Class 300 and Class 600 equipment. According to documented conditions and reviewed records the main damage mechanism for the investigated components in the gas station was identified as wall thinning due to erosion corrosion and external corrosion. In terms of inspection, results showed that most of the equipment studied had medium risk level and a few had medium to high level of risk. In this regard, the corrosion rates of Class 300 and Class 600 equipment were also studied and compared, and it was indicated that the corrosion rates were higher at locations for Class 300 equipment where more pressure drop had occurred. Overall, based on the obtained corrosion rates and obtained risk matrixes, it was concluded that wall thinning (erosion-corrosion) was the determining risk factor for equipment inspected in the gas pressure reduction station.
引用
收藏
页数:12
相关论文
共 50 条
  • [41] Risk-based Inspection Optimization of the Deteriorating System
    Tan Lin
    Gong Shiyu
    Guo Bo
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL VII, PTS A AND B, 2008, 7 : 1874 - 1878
  • [42] The use of influence diagrams in risk-based inspection
    San Cristobal, J. R.
    Biezma, M. V.
    SUSTAINABLE MARITIME TRANSPORTATION AND EXPLOITATION OF SEA RESOURCES, VOL 2, 2012, : 683 - 687
  • [43] Risk-Based Optimization of Inspection Planning in Ships
    Bharadwaj, Ujjwal
    Wintle, John
    JOURNAL OF SHIP PRODUCTION AND DESIGN, 2011, 27 (03): : 111 - 117
  • [44] Multilevel risk-based inspection scheme for FPSOs
    Lee, A. K.
    Serratella, C.
    Wang, G.
    Basu, R.
    Spong, R.
    MARINE TECHNOLOGY AND SNAME NEWS, 2007, 44 (02): : 118 - 124
  • [45] Verification of the Framework for Risk-Based Bridge Inspection
    Washer, Glenn
    Connor, Robert
    Nasrollahi, Massoud
    Reising, Rebecca
    JOURNAL OF BRIDGE ENGINEERING, 2016, 21 (04)
  • [46] An implementation of risk-based inspection for elevator maintenance
    Seung-Tae Park
    Bo-Suk Yang
    Journal of Mechanical Science and Technology, 2010, 24 : 2367 - 2376
  • [47] USDA rolls out risk-based inspection
    不详
    JAVMA-JOURNAL OF THE AMERICAN VETERINARY MEDICAL ASSOCIATION, 2007, 230 (07): : 982 - 982
  • [48] A methodology for risk-based inspection planning of oil and gas pipes based on fuzzy logic framework
    Singh, Maneesh
    Markeset, Tore
    ENGINEERING FAILURE ANALYSIS, 2009, 16 (07) : 2098 - 2113
  • [49] Refinery embraces risk-based inspection plan
    Anon
    Oil and Gas Journal, 1999, 97 (21): : 58 - 60
  • [50] Refinery embraces risk-based inspection plan
    不详
    OIL & GAS JOURNAL, 1999, 97 (21) : 58 - 60