Risk-based inspection (RBI) of a gas pressure reduction station

被引:4
|
作者
Babaeian, A. [1 ]
Eslami, A. [1 ]
Ashrafizadeh, F. [1 ]
Golozar, M. A. [1 ]
Samadzadeh, M. [2 ]
Abbasian, F. [3 ]
机构
[1] Isfahan Univ Technol, Dept Mat Engn, Esfahan 8415683111, Iran
[2] Pars Oil & Gas Co POGC, Bushehr, Iran
[3] Isfahan Gas Co, Esfahan, Iran
关键词
Corrosion management; Corrosion rate; Risk-based inspection (RBI); Probability of failure (POF); Consequence of failure (COF); FLY-ASH; CORROSION; STRENGTH;
D O I
10.1016/j.jlp.2023.105100
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
One of the principles of corrosion management is proper inspection methodology, and in particular the risk-based inspection (RBI). Occasionally a large percentage of the total risk of a unit is concentrated in a small part of the equipment, which can be reduced by using risk management techniques. In this study, a semi-quantitative riskbased inspection method has been performed in a gas station with for its components (pipelines, filters, etc.), to identify the existing damage mechanisms and also to rank its equipment in terms of inspection intervals. In this regard, RBI was performed for the gas station which consisted of phases (Phase A & Phase B) with Class 300 and Class 600 equipment. According to documented conditions and reviewed records the main damage mechanism for the investigated components in the gas station was identified as wall thinning due to erosion corrosion and external corrosion. In terms of inspection, results showed that most of the equipment studied had medium risk level and a few had medium to high level of risk. In this regard, the corrosion rates of Class 300 and Class 600 equipment were also studied and compared, and it was indicated that the corrosion rates were higher at locations for Class 300 equipment where more pressure drop had occurred. Overall, based on the obtained corrosion rates and obtained risk matrixes, it was concluded that wall thinning (erosion-corrosion) was the determining risk factor for equipment inspected in the gas pressure reduction station.
引用
收藏
页数:12
相关论文
共 50 条
  • [31] Dynamic risk-based inspection methodology
    Bhatia, Karan
    Khan, Faisal
    Patel, Hiralben
    Abbassi, Rouzbeh
    JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2019, 62
  • [32] Risk-Based Inspection Analysis for High-Pressure Hydrogenation Cracking Unit
    Zhao, Jian-Ping
    JOURNAL OF PRESSURE VESSEL TECHNOLOGY-TRANSACTIONS OF THE ASME, 2009, 131 (02):
  • [33] Implementing Risk-Based Inspection Approach: Is it Beneficial for Pressure Equipment in Malaysia Industries?
    Mohamed, Ramuna
    Hassan, Che Rosmani Che
    Hamid, Mahar Diana
    PROCESS SAFETY PROGRESS, 2018, 37 (02) : 194 - 204
  • [34] Integrating risk-based inspection into risk management plans
    Conley, M
    PROCESS SAFETY PROGRESS, 2005, 24 (04) : 236 - 243
  • [35] Risk Analysis of Central Java']Java Gas Transmission Pipeline by Risk-Based Inspection Method
    Mediansyah
    Haryadi, G. D.
    Ismail, R.
    Kim, S. J.
    4TH INTERNATIONAL CONFERENCE ON ADVANCED MATERIALS SCIENCE AND TECHNOLOGY, 2016, 2017, 202
  • [36] EFFECTIVE IMPLEMENTATION OF RISK BASED INSPECTION (RBI) APPROACH IN ASSET INTEGRITY MANAGEMENT OF OIL AND GAS FACILITIES
    Akanni, Joseph
    Alonge, Oladipo
    ASME PRESSURE VESSELS AND PIPING CONFERENCE - 2015, VOL 7, 2015,
  • [37] GENETIC ALGORITHMS APPLIED TO THE CONCEPT OF RISK BASED INSPECTION (RBI): OPTIMIZATION OF INSPECTION PLANS
    Bittencourt Morais, Carlos Henrique
    de Moura, Fernanda Marques
    Abrahao, Elcio
    Maturana, Marcos Coelho
    Martins, Marcelo Ramos
    de Barros, Leonardo Oliveira
    Capelari Orlowski, Rene Thiago
    Debiaso Rossi, Andre Luis
    Schleder, Adriana Miralles
    PROCEEDINGS OF ASME 2022 41ST INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE & ARCTIC ENGINEERING, OMAE2022, VOL 2, 2022,
  • [38] FDA Seeks Risk-Based Inspection Program
    Wechsler, Jill
    Pharmaceutical Technology, 2003, 27 (11) : 26 - 35
  • [39] RISK-BASED INSPECTION OPTIMIZATION FOR VALVE INSPECTIONS
    Vibien, Patrick M.
    Joyal, David A.
    Oliphant, Ken E.
    Luff, William
    PROCEEDINGS OF THE 12TH INTERNATIONAL PIPELINE CONFERENCE, 2018, VOL 3, 2018,
  • [40] Applying and implementing risk-based inspection programs
    Anderson, SA
    HYDROCARBON PROCESSING, 2002, 81 (01): : 43 - 46