Cyclic response of precast concrete columns connected with cast-in-place UHPC in plastic hinge region

被引:9
|
作者
Zhang, Yangxi [1 ,2 ]
Lei, Heng [1 ]
Dong, ZhiFang [3 ]
Li, Tong [1 ]
Ma, Fudong [4 ]
Liu, Huazheng [5 ]
Deng, Mingke [1 ,2 ]
机构
[1] Xian Univ Architecture & Technol, Sch Civil Engn, Xian 710055, Peoples R China
[2] Minist Educ XAUAT, Key Lab Struct Engn & Earthquake Resistance, Xian 710055, Peoples R China
[3] Shangqiu Normal Univ, Coll Architecture & Civil Engn, Shangqiu 476000, Peoples R China
[4] Shanghai Res Inst Bldg Sci Co Ltd, Shanghai Key Lab Engn Struct Safety, Shanghai 200032, Peoples R China
[5] China Natl Petr Corp EastChina Design Inst Co Ltd, Qingdao 266000, Peoples R China
来源
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
UHPC; Ultra high performance concrete; Cyclic response; Column; Lap length; Flexural capacity; PERFORMANCE; BEHAVIOR; BOND; FRAMES; SHEAR; BARS; RC;
D O I
10.1016/j.jobe.2022.105793
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Ultra high performance concrete (UHPC) is a promising material for lap splice connection of steel bars in reinforced concrete (RC) precast structures given its high compressive strength, its high toughness, and its high bond strength with steel bars. This paper focuses on the cyclic response of bottom frame columns connected by UHPC in the plastic hinge region. The effect of lap length of longitudinal bars in UHPC (6d, 8d and 12d, d = diameter of longitudinal bar), axial load ratio and stirrup ratio of the UHPC connection region on the global response of the columns were presented and analyzed, and a cast-in-site RC column was prepared for comparison. The behavior of the UHPC connected columns was flexural dominated, but columns with 6d and 8d lap length failed due to the gradual bonding degradation between UHPC and longitudinal bars, and the column with 12d lap length failed due to UHPC crushing. It was demonstrated that a 8d lap length could achieve equivalent lateral bearing capacity and ductility to the control RC column, but the lap length should be greater than 8d when applying UHPC connection technology in seismic regions to ensure the energy dissipation. Column with lower axial load ratio (0.17) exhibited lower ductility because shear sliding occurred between the interface of UHPC and footing at the postpeak stage. The UHPC connected specimens exhibited higher resilience and better damage resistance in earthquake because the ratios of the residual displacements to the corresponding peak displacements were between 17 and 39%. Besides, a flexural capacity model for the columns was developed and the results predicted by the model agreed well with the experimental results.
引用
收藏
页数:15
相关论文
共 50 条
  • [21] PRECAST CONCRETE AND CAST-IN-PLACE CONCRETE WITH POST-TENSIONING SPEEDS PARKING STRUCTURE CONSTRUCTION
    不详
    JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1973, 18 (03): : 98 - 99
  • [22] Flexure-shear behavior of precast concrete deck panels with cast-in-place concrete topping
    Dowell, Robert K.
    Auer, Roy
    PCI JOURNAL, 2011, : 60 - 74
  • [23] Flexure-shear behavior of precast concrete deck panels with cast-in-place concrete topping
    Dowell R.K.
    Auer R.
    PCI Journal, 2011, 56 (03): : 60 - 74
  • [24] Cyclic behavior of concrete-filled square tubular columns with stiffened plastic hinge region
    Han, Rui
    Zhao, Hua
    Sun, Yuping
    Ju, Nengpan
    Zhao, Shichun
    JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2022, 190
  • [25] Cyclic responses of reinforced concrete composite columns strengthened in the plastic hinge region by HPFRC mortar
    Cho, Chang-Geun
    Kim, Yun-Yong
    Feo, Luciano
    Hui, David
    COMPOSITE STRUCTURES, 2012, 94 (07) : 2246 - 2253
  • [26] Full-scale tests of precast concrete beam-column connections with composite T-beams and cast-in-place columns subjected to cyclic loading
    Xue, Weichen
    Yang, Xinlei
    Hu, Xiang
    STRUCTURAL CONCRETE, 2020, 21 (01) : 169 - 183
  • [27] Field load tests on plastic tube cast-in-place concrete piles
    Qi, Chang-Guang
    Chen, Yong-Hui
    Iskander, Magued
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GROUND IMPROVEMENT, 2016, 169 (01) : 9 - 21
  • [28] Experimental comparisons of repairable precast concrete shear walls with a monolithic cast-in-place wall
    Li, Xinghua
    Wu, Gang
    Kurama, Yahya C.
    Cui, Haoran
    ENGINEERING STRUCTURES, 2020, 216
  • [29] Nonlinear continuity analysis of precast, prestressed concrete girders with cast-in-place decks and diaphragms
    Mirmiran, A
    Kulkarni, S
    Castrodale, R
    Miller, R
    Hastak, M
    PCI JOURNAL, 2001, 46 (05): : 60 - +
  • [30] Seismic Behavior of Cast-in-Place and Precast Recycled Aggregate Concrete Frames: A Comparative Study
    Xiao, Jianzhuang
    Ding, Tao
    Wang, Changqing
    STRUCTURAL ENGINEERING INTERNATIONAL, 2015, 25 (03) : 300 - 307