A construction schedule management method of large-scale construction project based on BIM model

被引:0
|
作者
Yin, Sheng [1 ]
机构
[1] Harbin Univ Sci & Technol, Rongcheng Coll, Rongcheng 264300, Peoples R China
关键词
management pheromone; management rules; definition residue; BIM model; INFORMATION-MANAGEMENT;
D O I
10.1504/IJCIS.2023.130456
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In order to overcome the problems of long response time and small number of manageable indicators existing in traditional construction project schedule management methods, a new construction schedule management method based on BIM model is designed in this paper. The construction progress data acquisition and decoding module circuit is set to complete the construction progress data acquisition, and the K-means algorithm is used to preprocess the construction progress data. First, the construction project progress is decomposed; then, the large-scale construction project is divided into different progress management levels by the WBS analysis method; a functional information module is established; the construction project progress data is imported into the BIM model; and finally, the BIM information function management of the method is realised. The experimental results show that the proposed method has low response time and multiple schedule management indicators, and the shortest response time of the proposed method is only 1.1 s.
引用
收藏
页码:140 / 153
页数:15
相关论文
共 50 条
  • [41] Integration management of large-scale consrtuction construction projects
    Chen, YQ
    Jiang, L
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2: MODERN INDUSTRIAL ENGINEERING AND INNOVATION IN ENTERPRISE MANAGEMENT, 2005, : 1449 - 1453
  • [42] Schedule quality evaluation for Construction Project Management
    Bragadin, Marco Alvise
    Kahkonen, Kalle
    TECHNE-JOURNAL OF TECHNOLOGY FOR ARCHITECTURE AND ENVIRONMENT, 2020, 20 : 175 - 183
  • [43] Research on the method of engineering construction recycling material project management based on BIM technology
    Lu, Yongqin
    Zhang, Zheyuan
    Zhao, Baojun
    Chen, Donghu
    INTERNATIONAL JOURNAL OF MATERIALS & PRODUCT TECHNOLOGY, 2023, 67 (3-4): : 336 - 361
  • [44] Research on Information Integration of Construction Project Management Based on BIM
    Gao, Xiong
    Wu, Yansheng
    Li, Yan
    2019 3RD INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2019), 2019, 267
  • [45] Research on Application of Project Information Portal in Large-scale Tobacco Construction Project
    Sun, Jide
    Wang, Dawei
    INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT (EBM2011), VOLS 1-6, 2011, : 1401 - 1404
  • [46] The impact of Engineering, Procurement and Construction (EPC) Phases on Project Performance: A Case of Large-scale Residential Construction Project
    Kabirifar, Kamyar
    Mojtahedi, Mohammad
    BUILDINGS, 2019, 9 (01)
  • [47] THE IMPACT OF ORGANISATIONAL RESILIENCE ON CONSTRUCTION PROJECT SUCCESS: EVIDENCE FROM LARGE-SCALE CONSTRUCTION IN CHINA
    Yang, Jie
    Cheng, Qian
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2020, 26 (08) : 775 - 788
  • [48] Risk assessment research based on employer for the large-scale mining shaft construction project
    Mi, Lingyun
    Wang, Wenshun
    PROCEEDINGS OF THE 2007 CONFERENCE ON SYSTEMS SCIENCE, MANAGEMENT SCIENCE AND SYSTEM DYNAMICS: SUSTAINABLE DEVELOPMENT AND COMPLEX SYSTEMS, VOLS 1-10, 2007, : 1601 - 1607
  • [49] Risk Pre-control on Multi-project Management for Large-Scale Construction Enterprises
    An Jianmin
    PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, 2011, : 1201 - 1206
  • [50] Study on BIM-based construction project cost and schedule risk early warning
    Sun, Chengshuang
    Man, Qingpeng
    Wang, Yaowu
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2015, 29 (02) : 469 - 477