A construction schedule management method of large-scale construction project based on BIM model

被引:0
|
作者
Yin, Sheng [1 ]
机构
[1] Harbin Univ Sci & Technol, Rongcheng Coll, Rongcheng 264300, Peoples R China
关键词
management pheromone; management rules; definition residue; BIM model; INFORMATION-MANAGEMENT;
D O I
10.1504/IJCIS.2023.130456
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In order to overcome the problems of long response time and small number of manageable indicators existing in traditional construction project schedule management methods, a new construction schedule management method based on BIM model is designed in this paper. The construction progress data acquisition and decoding module circuit is set to complete the construction progress data acquisition, and the K-means algorithm is used to preprocess the construction progress data. First, the construction project progress is decomposed; then, the large-scale construction project is divided into different progress management levels by the WBS analysis method; a functional information module is established; the construction project progress data is imported into the BIM model; and finally, the BIM information function management of the method is realised. The experimental results show that the proposed method has low response time and multiple schedule management indicators, and the shortest response time of the proposed method is only 1.1 s.
引用
收藏
页码:140 / 153
页数:15
相关论文
共 50 条
  • [31] Research on the Key Measures of Schedule Control for large-scale construction enterprises
    Lu Hu-sheng
    Wu Guo-wei
    Cao Jian-zhong
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 2065 - 2068
  • [32] Computer-based Large-scale Construction Project Health Diagnosis System
    Tang, Hui
    Shi, Wei
    Xu, Haiyan
    Yang, Chunwei
    Guo, Yi
    Sheng, Lin
    2019 6TH INTERNATIONAL CONFERENCE ON BEHAVIORAL, ECONOMIC AND SOCIO-CULTURAL COMPUTING (BESC 2019), 2019,
  • [33] Construction of a Value Growth Prediction Model for the Integration of Construction Project Management and BIM Technology
    Liao, Hanchao
    Shan, Miyuan
    Applied Mathematics and Nonlinear Sciences, 2024, 9 (01)
  • [34] BIM-based Collaborative Schedule Management System for the Construction Industry
    Hou, Xue-liang
    Lin, Zhi-ming
    2016 INTERNATIONAL CONFERENCE ON MANAGEMENT, ECONOMICS AND SOCIAL DEVELOPMENT (ICMESD 2016), 2016, : 957 - 962
  • [35] The large-scale coal mine construction project management practices in the local coal enterprises
    Ye Yong
    Proceedings of 20th IPMA World Congress on Project Management, Vols 1 and 2, 2006, : 106 - 110
  • [36] Construction of large-scale honeynet Based on Honeyd
    Wang, Jun
    Zeng, Jing
    CEIS 2011, 2011, 15
  • [37] Application of game theory to procurement management of large-scale construction project: A case in Sutong Bridge project
    Wang Wei
    Xiao Tiaojun
    Zhang Qun
    Shen Bo
    PROCEEDINGS OF 20TH IPMA WORLD CONGRESS ON PROJECT MANAGEMENT, VOLS 1 AND 2, 2006, : 160 - 164
  • [38] Promoting large-scale construction enterprise management improvement by enterprise cultural construction
    Yao, Gui-Qing
    Journal of Railway Engineering Society, 2015, 32 (08) : 100 - 105
  • [39] Characteristics and Causes of Construction Accidents in a Large-Scale Development Project
    Chan, Albert P. C.
    Yang, Yang
    Choi, Tracy N. Y.
    Nwaogu, Janet Mayowa
    SUSTAINABILITY, 2022, 14 (08)
  • [40] Application prospect of BIM in the construction of large-scale LNG storage tanks
    Duan, Pinjia
    Zhang, Chao
    Qu, Changlong
    Yang, Fan
    Natural Gas Industry, 2015, 35 (01) : 126 - 130