Exploring the critical production risk factors for modular integrated construction projects

被引:11
|
作者
Wuni, Ibrahim Yahaya [1 ]
Shen, Geoffrey Qiping [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hung Hom, Kowloon, Hong Kong, Peoples R China
关键词
Modular integrated construction; Production risks; Risk factors; Supply chain; Severity; Risk management; OFF-SITE CONSTRUCTION; PERFORMANCE; IMPLEMENTATION; OPPORTUNITIES; COORDINATION; BUILDINGS; SYSTEM;
D O I
10.1108/JFM-03-2021-0029
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose The factory production stage constitutes the bridge in the supply chains of modular integrated construction (MiC) projects. It embodies the fundamental differences between MiC and site-based construction. However, there is a poverty of knowledge of the uncertainties and risk events at the production stage. This study aims to investigate the critical production risk factors (PRFs) for MiC projects. Design/methodology/approach Comprehensive literature research and expert review identified and validated 22 candidate PRFs for MiC projects. A structured questionnaire survey was then used to gather opinions of domain experts in 18 countries on the relative impact of the validated PRFs for MiC projects. The collected data were analysed using multiple statistical techniques. Findings Statistical analysis identified nine critical PRFs for MiC projects. The top five include dimensional conflicts between modules during production; delays in production materials procurement; defective design; design information gap between designer and manufacturer; and limited capacity of manufacturers. Originality/value The study addressed the gap associated with identifying critical risk factors peculiar to the factory production stage of MiC projects. Its novelty lies in providing an opposite assessment of severities and prioritization of critical PRFs for MiC projects. The prioritized critical PRFs for MiC projects may inform resource allocation. Thus, it provides valuable information to MiC production specialists and project managers in their production risk planning and management strategies. The identified PRFs contribute to the theoretical checklist of MiC supply chain risk factors and may assist practitioners in assessing the severity levels of the PRFs of their MiC projects.
引用
收藏
页码:50 / 68
页数:19
相关论文
共 50 条
  • [31] Theoretical review on critical risk factors in oil and gas construction projects in Yemen
    Kassem, Mukhtar A.
    Khoiry, Muhamad Azry
    Hamzah, Noraini
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (04) : 934 - 968
  • [32] Critical success factors of infrastructure construction projects
    Yamany, Mohamed S.
    Abdelhameed, Abdelnaser
    Elbeltagi, Emad
    Mohamed, Hany Abd Elshakour
    INNOVATIVE INFRASTRUCTURE SOLUTIONS, 2024, 9 (04)
  • [33] Critical success factors of infrastructure construction projects
    Mohamed S. Yamany
    Abdelnaser Abdelhameed
    Emad Elbeltagi
    Hany Abd Elshakour Mohamed
    Innovative Infrastructure Solutions, 2024, 9
  • [34] An Integrated Risk Management Model for Construction Projects
    Zhao, Zhen-Yu
    Duan, Lin-Ling
    2008 PORTLAND INTERNATIONAL CONFERENCE ON MANAGEMENT OF ENGINEERING & TECHNOLOGY, VOLS 1-5, 2008, : 1389 - 1394
  • [35] Exploring the feasibility of using modular technology for construction projects in island areas
    Zhou, Zhenquan
    Syamsunur, Deprizon
    Wang, Lanxin
    Kit, Ang Chun
    JOURNAL OF INFRASTRUCTURE POLICY AND DEVELOPMENT, 2024, 8 (04)
  • [36] Modelling the relationship between modular construction adoption and critical success factors for residential projects in developing countries
    Ali, Ali Hassan
    Elyamany, Ahmed
    Ibrahim, Ahmed Hussein
    Kineber, Ahmed Farouk
    Daoud, Ahmed Osama
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (12) : 1314 - 1325
  • [37] Exploring the critical frequent factors of rework and assigning strategies to mitigate their occurrence in the Egyptian construction projects
    Yousry Akal A.
    Metwally El-Kholy A.
    Journal of King Saud University - Engineering Sciences, 2024, 36 (07) : 504 - 516
  • [38] Identifying Critical Risk Factors and Management Activities for Effective Offsite Construction Projects during Construction Phase
    Lee, SeungYeon
    Jang, YeEun
    Yi, June-Seong
    Son, JeongWook
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2023, 39 (04)
  • [39] Exploring critical risk factors for Green Building projects in developing countries: The case of Vietnam
    Nguyen, Hung Duy
    Macchion, Laura
    JOURNAL OF CLEANER PRODUCTION, 2022, 381
  • [40] An Integrated Approach of Simulation and Regression Analysis for Assessing Productivity in Modular Integrated Construction Projects
    Taiwo, Ridwan
    Hussein, Mohamed
    Zayed, Tarek
    BUILDINGS, 2022, 12 (11)