Steel-Concrete Composite Cable-Stayed Bridge-Main Bridge of the Jiangxinzhou Yangtze River Bridge at Nanjing

被引:7
|
作者
Cui, Bing [1 ]
Wu, Huanling [2 ]
Zhao, Canhui [3 ]
Liu, Jiaping [4 ]
Guo, Zhiming [2 ]
机构
[1] CCCC Highway Consultants Co Ltd, Beijing, Peoples R China
[2] Nanjing Publ Engn Construct Ctr, Nanjing, Peoples R China
[3] Southwest Jiaotong Univ, Chengdu, Peoples R China
[4] Southeast Univ, Nanjing, Peoples R China
关键词
cable-stayed bridge; steel shell-concrete composite structure tower; steel-CA-RPC composite beam; bridge design; construction technology;
D O I
10.1080/10168664.2021.1999191
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Nanjing Jiangxinzhou Yangtze River Bridge is located at Nanjing, People's Republic of China. The main bridge spans Yangtze River in the form of a cable-stayed bridge with three towers and two main spans, with a total length of 1796 m and a main span of 600 m. The towers and main beams of the bridge are all steel-concrete composite structures, which is the first all-steel-concrete composite structure cable-stayed bridge in the world. The bridge innovatively develops a steel shell-concrete composite structure tower, deploys coarse aggregate reactive powder concrete (CA-RPC), and applies it to the main girder of the bridge to form a lightweight and high-performance steel-concrete composite beam. Numerous innovative technologies have been achieved with new materials, new structures, new processes, and many other aspects. The unique structural concept has significantly increased the factory manufacturing speed of bridge components, which not only reduces the work and labour cost at the bridge site above the bearing platform to less than 25% but also effectively reduces the amount and loss of engineering materials during bridge construction, all of which have made outstanding contributions to the development of cable-stayed bridges. At the same time, it has also contributed a bridge of stunning appearance and unique structure to China and world bridge engineering.
引用
收藏
页码:107 / 114
页数:8
相关论文
共 50 条
  • [41] Study on the Effect of Temperature on the Alignment of a Long-Span Steel-Concrete Composite Beam Track Cable-Stayed Bridge
    Li, Xiaogang
    Huang, Xiangsheng
    Ding, Peng
    Chen, Xiaohu
    Wang, Qiansong
    Cen, Sihan
    APPLIED SCIENCES-BASEL, 2024, 14 (22):
  • [42] Bridge management system development for a cable-stayed bridge
    Sungkon Kim
    KSCE Journal of Civil Engineering, 2001, 5 (1) : 43 - 49
  • [44] Spanning the River Rhine with a new cable-stayed bridge
    Lockmann, Hans
    Marzahn, Gero A.
    STEEL CONSTRUCTION-DESIGN AND RESEARCH, 2009, 2 (01): : 9 - +
  • [45] EXPERIMENTAL STUDY ON FATIGUE PERFORMANCE OF STEEL-CONCRETE JOINT SECTION OF HYBRID GIRDER CABLE-STAYED BRIDGE
    Zhou, Yang
    Pu, Qian-Hui
    Shi, Zhou
    Gou, Hong-Ye
    Yang, Shi-Li
    ADVANCED STEEL CONSTRUCTION, 2022, 18 (02): : 536 - 543
  • [46] East Fork White River cable-stayed bridge
    Hillman, JR
    Lockwood, JD
    13TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, OFFICIAL PROCEEDINGS, 1996, : 185 - 194
  • [47] The cable-stayed bridge across the River Sava in Belgrade
    Walser, P.
    Hopf, S.
    Steinkuehler, M.
    MODERN TECHNIQUES IN BRIDGE ENGINEERING, 2011, : 13 - 26
  • [48] Spanning the rhine river with a new cable-stayed bridge
    Löckmann, Hans
    Marzahn, Gero A.
    Structural Engineering International: Journal of the International Association for Bridge and Structural Engineering (IABSE), 2009, 19 (03): : 271 - 276
  • [49] The Numerical Simulation Analysis Method of Steel-concrete Joint Section in Hybrid Girder of Cable-stayed Bridge
    Xing Bing
    Li Xiao-Zhen
    MODERN TECHNOLOGIES IN MATERIALS, MECHANICS AND INTELLIGENT SYSTEMS, 2014, 1049 : 226 - 233
  • [50] Mechanical behavior of steel-concrete joint with rear bearing plate in hybrid girder of cable-stayed bridge
    Liu, Rong
    Liu, Yu-Qing
    Wu, Ding-Jun
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2009, 41 (SUPPL. 2): : 196 - 200