Risk analysis in underground tunnel construction with tunnel boring machines using the Best-Worst method and data envelopment analysis

被引:6
|
作者
Koohathongsumrit, Nitidetch [1 ]
Meethom, Warapoj [2 ]
机构
[1] Ramkhamhang Univ, Fac Sci, Dept Stat, 2086 Ramkhamhaeng Rd, Bangkok 10240, Thailand
[2] King Mongkuts Univ Technol North Bangkok, Fac Engn, Dept Ind Engn, 1518 Pracharat 1 Rd, Bangkok 10800, Thailand
关键词
Metro construction; Multiple criteria decision -making; Risk assessment; Tunnel boring machine; Underground work; FUZZY-LOGIC; SUSTAINABILITY; RANKING; CHINA;
D O I
10.1016/j.heliyon.2023.e23486
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Background: The use of tunnel boring machines is continuously increasing; however, this activity faces many risks, resulting in negative events.Methods: A novel approach using the best-worst method and a data envelopment analysis model was proposed to analyze the risks of underground tunnel construction with tunnel boring machines. The proposed approach was validated using a realistic case study of metro construction in Thailand.Results: The proposed approach efficiently analyzed the risks and produced more solid findings. The most critical and least affected risks can be identified according to risk scores in descending order. Implication: This study contributes a new method of risk analysis that benefits project managers and stakeholders who design risk management plans to reduce the occurrence and mitigate the severity of metro works.Originality: The new risk analysis can obtain the best compromise ranking of risks based on decision-makers' preferences, probabilities, and various consequences under different circumstances.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] Dependence assessment in human reliability analysis based on cloud model and best-worst method
    Ji, Changcheng
    Gao, Fei
    Liu, Wenjiang
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2024, 242
  • [42] A novel best worst method robust data envelopment analysis: Incorporating decision makers' preferences in an uncertain environment
    Omrani, Hashem
    Valipour, Mahsa
    Emrouznejad, Ali
    OPERATIONS RESEARCH PERSPECTIVES, 2021, 8
  • [43] A reliable risk analysis approach using an extension of best-worst method based on democratic-autocratic decision-making style
    Yazdi, Mohammad
    Nedjati, Arman
    Zarei, Esmaeil
    Abbassi, Rouzbeh
    JOURNAL OF CLEANER PRODUCTION, 2020, 256
  • [44] A two-stage group stochastic preference analysis based on best-worst method
    Dai, Ning
    Zhou, Ligang
    Wu, Qun
    APPLIED INTELLIGENCE, 2024, 54 (22) : 11233 - 11247
  • [45] Benchmarking Analysis of Railway Infrastructure Managers: A Hybrid Principal Component Analysis (PCA), Grey Best-Worst Method (G-BWM), and Assurance Region Data Envelopment Analysis (AR-DEA) Model
    Tadic, Snezana
    Kalem, Aida
    Krstic, Mladen
    Cabric, Nermin
    Medic, Adisa
    Veljovic, Milos
    MATHEMATICS, 2025, 13 (05)
  • [46] Structural analysis of a signal from entropy tool -: Application to tunnel boring data
    Denis, A
    Crémoux, F
    APPLICATIONS OF STATISTICS AND PROBABILITY, VOLS 1 AND 2: CIVIL ENGINEERING RELIABILITY AND RISK ANALYSIS, 2000, : 401 - 405
  • [47] Reliability Analysis of Full-Face Tunnel Boring Machines with the Monte Carlo Simulation Technique
    Mikaeil, Reza
    Khoshalan, Hasel Amini
    Nasrollahi, Mohammad Hossein
    Esmaeilzadeh, Akbar
    RUDARSKO-GEOLOSKO-NAFTNI ZBORNIK, 2022, 37 (03): : 149 - 160
  • [48] Tunnel boring machines (TBM) performance prediction: A case study using big data and deep learning
    Shangxin, Feng
    Zuyu, Chen
    Hua, Luo
    Shanyong, Wang
    Yufei, Zhao
    Lipeng, Liu
    Daosheng, Ling
    Liujie, Jing
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 110
  • [49] Coupling Analysis of Tunnel Construction Risk in Complex Geology and Construction Factors
    Guo, Desai
    Song, Zhanping
    Xu, Tian
    Zhang, Yuwei
    Ding, Libo
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (09)
  • [50] Design and Optimization of Tunnel Boring Machines by Simulating the Cutting Rock Process using the Discrete Element Method
    Medel-Morales, Roberto C.
    Botello-Rionda, Salvador
    COMPUTACION Y SISTEMAS, 2013, 17 (03): : 329 - 339