共 50 条
- [42] Fuzzy Logic Model for Natural Risk Assessment in SW Bulgaria EDUCATION AND MANAGEMENT TECHNOLOGY, ICEMT 2011, 2011, 13 : 109 - 113
- [44] A critical evaluation of risk assessment methodology for natural gas pipeline SAFETY AND RELIABILITY: METHODOLOGY AND APPLICATIONS, 2015, : 43 - 47
- [45] RISK BASED GUIDELINES FOR NATURAL GAS PIPELINE IN OPERATION PROCEEDINGS OF THE ASME INTERNATIONAL PIPELINE CONFERENCE 2010, VOL 4, 2010, : 565 - +
- [46] USING THE FUZZY LOGIC DESCRIPTION FOR THE EX ANTE RISK ASSESSMENT IN THE PROJECT ECONOMIC AND SOCIAL DEVELOPMENT (ESD 2018): 35TH INTERNATIONAL SCIENTIFIC CONFERENCE, 2018, : 224 - 231
- [47] Assessment of Project Management Implementation Based On Fuzzy Logic Approach INNOVATION MANAGEMENT AND EDUCATION EXCELLENCE THROUGH VISION 2020, VOLS I -XI, 2018, : 6079 - 6086
- [48] CONSTRUCTION PROJECTS RISK ASSESSMENT BASED ON PERT, CPM AND PROJECT MANAGEMENT WITH FUZZY LOGIC TECHNIQUE ADVANCES AND APPLICATIONS IN MATHEMATICAL SCIENCES, 2022, 21 (09): : 5385 - 5395
- [49] A quantitative risk analysis method for the natural gas pipeline network RISK ANALYSIS VII: SIMULATION AND HAZARD MITIGATION & BROWNFIELDS V: PREVENTION, ASSESSMENT, REHABILITATION AND DEVELOPMENT OF BROWNFIELD SITES, 2010, : PI195 - PI203
- [50] Fuzzy Probability Method-Based Risk Assessment of International Engineering Project ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 3180 - 3183