Fine-Kinney method based on fuzzy logic for natural gas pipeline project risk assessment

被引:4
|
作者
Efe, Burak [1 ]
Efe, oemer Faruk [2 ]
机构
[1] Necmettin Erbakan Univ, Dept Ind Engn, TR-42060 Konya, Turkiye
[2] Bursa Tech Univ, Dept Ind Engn, Bursa, Turkiye
关键词
Quality function deployment; Natural gas pipeline project risk assessment; VIKOR; q-Rung orthopair fuzzy number; Fine-Kinney method; QUALITY FUNCTION DEPLOYMENT; QFD;
D O I
10.1007/s00500-023-09108-6
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Quality function deployment (QFD) method allows reviewing of customer requirements (CRs) and design requirements (DRs) simultaneously in order to handle the correlations and relationships of CRs and DRs in calculations. It has been often combined with fuzzy numbers, because it provides to gather the judgments of experts in vagueness environment more correctly and easily. This paper suggests employing q-rung orthopair fuzzy number (q-ROFN) for improving the fuzzy QFD approach. The proposed q-ROFN based QFD method uses q-ROFN to adjust the importance degrees of CRs based the relationships between CRs and DRs with the help of the correlations and relationships of CRs and DRs. q-ROFN presents more information than numbers such as intuitionistic fuzzy number and Pythagorean fuzzy number about the correlations and relationships of CRs and DRs. Furthermore, this work proposes integrating Fine-Kinney method and QFD method to cope with limitations of Fine-Kinney method. VIKOR (VIsekriterijumska optimizacija i KOm-promisno Resenje) approach based on q-ROFN is also used to rank DRs. The proposed integrated method provides a novel decision support model for the natural gas pipeline project (NGPP) risk assessment. There is no study about the integration of Fine-Kinney, q-ROFN-based QFD, VIKOR methods. The most significant DR and the second most important DR for NGPP risk assessment are electrical sparks and coating type factor, respectively. The results of this model present a road map to the managers of NGPP for an occupational health and safety policy by ordering the failure modes.
引用
收藏
页码:16465 / 16482
页数:18
相关论文
共 50 条
  • [21] RETRACTED: The probabilistic linguistic term sets based ORESTE method for risk evaluation in Fine-Kinney model with interactive risk factors (Retracted Article)
    Li, Helong
    Liu, Shuli
    Wang, Weizhong
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2022, 43 (03) : 3493 - 3512
  • [22] A New Approach to the Fine Kinney Method with AHP Based ELECTRE I and Math Model on Risk Assessment for Natural Disasters
    Derse, Onur
    JOURNAL OF GEOGRAPHY-COGRAFYA DERGISI, 2021, (42): : 155 - 164
  • [23] An interval 2-Tuple linguistic Fine-Kinney model for risk analysis based on extended ORESTE method with cumulative prospect theory
    Wang, Weizhong
    Ding, Ling
    Liu, Xinwang
    Liu, Shuli
    INFORMATION FUSION, 2022, 78 : 40 - 56
  • [24] Vulnerability analysis method based on risk assessment for gas transmission capabilities of natural gas pipeline networks
    Wang, WuChang
    Zhang, Yi
    Li, YuXing
    Hu, Qihui
    Liu, Chengsong
    Liu, Cuiwei
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2022, 218
  • [25] Fuzzy Bayesian Belief Networks Method on Risk Assessment of EPC Pipeline Project
    Yusuf, Muhammad
    Latief, Yusuf
    Rarasati, Ayomi Dita
    Trigunarsyah, Bambang
    Laksono, Naufal Budi
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2025, 11 (03): : 1050 - 1071
  • [26] Action selection in risk assessment with fuzzy Fine–Kinney-based AHP-TOPSIS approach: a case study in gas plant
    Bahar Dogan
    Murat Oturakci
    Cansu Dagsuyu
    Environmental Science and Pollution Research, 2022, 29 : 66222 - 66234
  • [27] Action selection in risk assessment with fuzzy Fine-Kinney-based AHP-TOPSIS approach: a case study in gas plant
    Dogan, Bahar
    Oturakci, Murat
    Dagsuyu, Cansu
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2022, 29 (44) : 66222 - 66234
  • [28] A method of quantitative risk assessment for transmission pipeline carrying natural gas
    Jo, YD
    Ahn, BJ
    JOURNAL OF HAZARDOUS MATERIALS, 2005, 123 (1-3) : 1 - 12
  • [29] A fuzzy Fine-Kinney-based risk evaluation approach with extended MULTIMOORA method based on Choquet integral
    Wang, Weizhong
    Liu, Xinwang
    Qin, Yong
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 125 : 111 - 123
  • [30] Geohazard assessment lifecycle for a natural gas pipeline project
    Lekkakis, D.
    Boone, M. D.
    Strassburger, E.
    Li, Z.
    Duffy, W. P.
    INTERNATIONAL SYMPOSIUM ON GEOHAZARDS AND GEOMECHANICS (ISGG2015), 2015, 26