共 50 条
- [41] Key requirements of an IT tool based on last planner® system REVISTA INGENIERIA DE CONSTRUCCION, 2020, 35 (02): : 126 - 134
- [42] Development of Innovative Integrated Last Planner System (ILPS) International Journal of Civil Engineering, 2020, 18 : 701 - 715
- [43] Lean Construction in the UAE: Implementation of Last Planner System® Lean Construction Journal, 2023, 2023 : 01 - 20
- [45] Last planner system results in subcontract construction company REVISTA DE LA CONSTRUCCION, 2011, 10 (01): : 36 - 52
- [46] Perspectives on issues and the application of the innovative procurement approaches for the Industrialised Building System (IBS) INTERNATIONAL JOURNAL OF BUILT ENVIRONMENT AND SUSTAINABILITY, 2019, 6 (01): : 39 - 43
- [47] Using the villego® simulation to teach the last planner® system 1600, Lean Construction Institute (2014):
- [48] Critical Success Factors for Lean Thinking in the Application of Industrialised Building System (IBS) INTERNATIONAL RESEARCH AND INNOVATION SUMMIT (IRIS2017), 2017, 226
- [50] A survey on production planning system in construction projects based on Last Planner System KSCE Journal of Civil Engineering, 2016, 20 : 1 - 11