Last Planner System (LPS) Themed Framework for Effective Application of Industrialized Building System (IBS)

被引:0
|
作者
Alaloul, Wesam Salah [1 ]
Heng, Lee Jian [1 ]
Qureshi, Abdul Hannan [1 ]
机构
[1] Univ Teknol PETRONAS, Dept Civil & Environm Engn, Seri Iskandar 32610, Perak, Malaysia
关键词
Prefabricated construction; Pre-cast construction; Industrialized building system; Last planner system; Malaysian construction industry; ANALYTIC HIERARCHY PROCESS; CONSTRUCTION; ISSUES;
D O I
10.1007/s13369-023-07793-x
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
The industrialized building system (IBS) is a modern technology that may advance the construction industry. In various domains, conventional construction methodologies are being replaced by IBS to meet growing market demand sustainably. The Malaysian government has successfully started implementing IBS in the public sector. However, the private sector is hesitant about its adoption. Last planner system (LPS) is a realistic way to collaboratively manage project-based production that involves trade foremen or design team leaders (the last planners) in planning in greater and greater detail as the time for the work to be done gets closer. This study identified the critical success factors (CSFs) of IBS adoption using a questionnaire survey distributed among the IBS stakeholders, contractors, consultants and academicians. After that, a conceptual framework was developed for adopting IBS in Malaysia based on the LPS via analytical hierarchy process. The results display the importance level of each CSFs by their criteria weight according to master planning, phase planning, make-ready planning, weekly planning and learning phase in LPS.
引用
收藏
页码:13377 / 13393
页数:17
相关论文
共 50 条
  • [21] Major blocking factors affecting the application of industrialized building system
    Al-Aidrous, Al-hussein M. H.
    Shafiq, Nasir
    Rahmawati, Yani
    Mohammed, Bashar S.
    Al-Ashmori, Yasser Yahya
    Baarimah, Abdullah O.
    Alawag, Aawag Mohsen
    AIN SHAMS ENGINEERING JOURNAL, 2023, 14 (10)
  • [22] Review in formulating the standard form of contract for Industrialized Building System (IBS) construction approach in Malaysia
    Fatah, Mohd Ashraf Mohd
    Mohammad, Mohammad Fadhil
    Abd Shukor, Ani Saifuza
    9TH INTERNATIONAL UNIMAS STEM ENGINEERING CONFERENCE (ENCON 2016) INNOVATIVE SOLUTIONS FOR ENGINEERING AND TECHNOLOGY CHALLENGES, 2017, 87
  • [23] Economic effects of migrant labor on industrialized building system (IBS) adoption in the Malaysian construction industry
    Akmam Syed Zakaria, Sharifah
    Amtered El-Abidi, Khaled M.
    ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2021, 17 (1-2) : 50 - 66
  • [24] Compatibility Issues of Industrialized Building System (IBS) in Interior Construction: A Case Study in Kuala Lumpur
    Yaman, R.
    Ali, K.
    Abdullah, H.
    Halil, F. Muhamad
    Ahmad, N.
    4TH INTERNATIONAL CONFERENCE ON RESEARCH METHODOLOGY FOR BUILT ENVIRONMENT AND ENGINEERING 2019, 2019, 385
  • [25] LEAN IMPACT ON MANUFACTURING PRODUCTIVITY: A CASE STUDY OF INDUSTRIALIZED BUILDING SYSTEM (IBS) MANUFACTURING FACTORY
    Abidin, Muhammad Harith Zainal
    Leman, Zulkiflle
    Yusof, Zainal Abidin Mohd
    Khalili, Amjad
    JURNAL TEKNOLOGI-SCIENCES & ENGINEERING, 2022, 84 (04): : 65 - 77
  • [26] AN INTEGRATED APPROACH FOR SUSTAINABILITY IN THE APPLICATION OF INDUSTRIALISED BUILDING SYSTEM (IBS)
    Yunus, Riduan
    Hamid, Abdul Rahim Abdul
    Noor, Siti Rahimah Mohd
    INTERNATIONAL JOURNAL OF GEOMATE, 2019, 17 (61): : 115 - 121
  • [27] Effective of Communication using WhatsApp: Industrialised Building System (IBS) Construction
    Pozin, Mohd Affendi Ahmad
    Nawi, Mohd Nasrun Mohd
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON APPLIED SCIENCE AND TECHNOLOGY (ICAST'18), 2018, 2016
  • [28] A PROJECT MANAGEMENT COMPETENCY FRAMEWORK FOR INDUSTRIALISED BUILDING SYSTEM (IBS) CONSTRUCTION
    Jabar, Izatul Laili
    Abdul-Aziz, Abdul-Rashid
    Suresh, Subashini
    Renukappa, Suresh
    Enshassi, Adnan
    INTERNATIONAL JOURNAL OF TECHNOLOGY, 2019, 10 (04) : 657 - 666
  • [29] Implementation of total quality management (TQM) in malay-sian industrialized building system (IBS) projects
    Alawag, Aawag Mohsen
    Alaloul, Wesam Salah
    Liew, M. S.
    Musarat, Muhammad Ali
    Baarimah, Abdullah O.
    REVISTA DE LA CONSTRUCCION, 2023, 22 (01): : 74 - +
  • [30] STUDY OF WASTE IN INDUSTRIALIZED BUILDING SYSTEM
    DUNUNG, PV
    CONCRETE, 1972, 6 (09): : 22 - &