Early warping deformation of high-speed railway CRTS III track slabs

被引:5
|
作者
Liu, Ran [2 ]
Song, Li [1 ,2 ]
Cao, Jiwei [1 ]
Xia, Zhihua [1 ]
Yu, Zhiwu [1 ,2 ,3 ]
机构
[1] Natl Engn Res Ctr High Speed Railway Construct Tec, Changsha 410075, Peoples R China
[2] Cent South Univ, Sch Civil Engn, Changsha 410075, Peoples R China
[3] China Railway Grp Ltd, Beijing 100039, Peoples R China
基金
中国国家自然科学基金;
关键词
Warping deformation; High-speed railway CRTS III track slab; Temperature field; Shrinkage strain; MOISTURE DISTRIBUTION; CONCRETE; WATER; EQUILIBRIUM; SHRINKAGE;
D O I
10.1016/j.engstruct.2023.116651
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Excessive flatness deviation issues in the track slabs of railway tracks make it difficult to achieve precise adjustments for both the track slabs and rails. This study aimed to analyze the deviation in flatness of the highspeed railway CRTS III track slabs. Experimental measurements were conducted on the warping deformation of the track slabs before water curing during the maintenance period. Six improved designs were implemented for the steaming process and structural construction. A numerical model was established to predict the warping deformation of the track slab before water curing, considering the temperature and humidity fields as driving forces. Using the sequential coupling method, the warping deformation of CRTS III track slab was calculated under the combined action of temperature field, shrinkage strain field, and prestressed tendons. Based on the results, it is concluded that: (1) High-temperature steam curing of the track slab increases the effective maintenance time and accelerates its strengthening rate. (2) Early shrinkage of the track slab is the primary factor causing warping deformation. (3) During the steam curing period, the warping deformation of the track slab can be controlled economically and effectively by employing secondary water spraying and presetting a reverse arch of 0.5 mm-0.8 mm.
引用
收藏
页数:14
相关论文
共 50 条
  • [41] Elastic-plastic seismic response of CRTS II slab ballastless track system on high-speed railway bridges
    YAN Bin
    LIU Shi
    PU Hao
    DAI GongLian
    CAI XiaoPei
    Science China(Technological Sciences), 2017, 60 (06) : 865 - 871
  • [42] Beam-track interaction of high-speed railway bridge with ballast track
    闫斌
    戴公连
    张华平
    JournalofCentralSouthUniversity, 2012, 19 (05) : 1447 - 1453
  • [43] Beam-track interaction of high-speed railway bridge with ballast track
    Bin Yan
    Gong-lian Dai
    Hua-ping Zhang
    Journal of Central South University, 2012, 19 : 1447 - 1453
  • [44] Beam-track interaction of high-speed railway bridge with ballast track
    Yan Bin
    Dai Gong-lian
    Zhang Hua-ping
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2012, 19 (05) : 1447 - 1453
  • [45] Research on the Warping Deformation of CRTS Ⅲ Type Track Plate in Severe Cold Area
    Xu, Hong
    Cao, Xingang
    Journal of Railway Engineering Society, 2019, 36 (05) : 20 - 24
  • [46] Earthworks for railway lines with high-speed services and slab track
    Engler, M.
    Eisenbahningenieur, 2001, 52 (06): : 8 - 12
  • [47] The Influence of CRTS II Slab Ballastless Track Upper Arch Deformation on the Wheel Jumping Law of High-Speed Vehicle
    Gong, Kai
    Wang, Cheng
    Xiang, Jun
    Guo, Wenjie
    Luo, Jiangling
    Bian, Wenjun
    INTERNATIONAL JOURNAL OF STRUCTURAL STABILITY AND DYNAMICS, 2025, 25 (04)
  • [48] Stress and Deflection Parametric Study of High-Speed Railway CRTS-II Ballastless Track Slab on Elevated Bridge Foundations
    Sun, Lu
    Chen, Liliang
    Zelelew, Habtamu H.
    JOURNAL OF TRANSPORTATION ENGINEERING, 2013, 139 (12) : 1224 - 1234
  • [49] Deformation Source, Deformation Transmission of Post-construction Settlement and Control Methods of Track Irregularity for High-speed Railway Subgrade
    Zhao G.
    Zhao R.
    Liu J.
    1600, Science Press (42): : 127 - 134
  • [50] Establishing of track quality level management system for ballastless track of high-speed railway
    Shen, J. F.
    Xu, Y. D.
    Li, H. F.
    URBAN TRANSPORT XXII, 2016, 164 : 39 - 50