Early warping deformation of high-speed railway CRTS III track slabs

被引:5
|
作者
Liu, Ran [2 ]
Song, Li [1 ,2 ]
Cao, Jiwei [1 ]
Xia, Zhihua [1 ]
Yu, Zhiwu [1 ,2 ,3 ]
机构
[1] Natl Engn Res Ctr High Speed Railway Construct Tec, Changsha 410075, Peoples R China
[2] Cent South Univ, Sch Civil Engn, Changsha 410075, Peoples R China
[3] China Railway Grp Ltd, Beijing 100039, Peoples R China
基金
中国国家自然科学基金;
关键词
Warping deformation; High-speed railway CRTS III track slab; Temperature field; Shrinkage strain; MOISTURE DISTRIBUTION; CONCRETE; WATER; EQUILIBRIUM; SHRINKAGE;
D O I
10.1016/j.engstruct.2023.116651
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Excessive flatness deviation issues in the track slabs of railway tracks make it difficult to achieve precise adjustments for both the track slabs and rails. This study aimed to analyze the deviation in flatness of the highspeed railway CRTS III track slabs. Experimental measurements were conducted on the warping deformation of the track slabs before water curing during the maintenance period. Six improved designs were implemented for the steaming process and structural construction. A numerical model was established to predict the warping deformation of the track slab before water curing, considering the temperature and humidity fields as driving forces. Using the sequential coupling method, the warping deformation of CRTS III track slab was calculated under the combined action of temperature field, shrinkage strain field, and prestressed tendons. Based on the results, it is concluded that: (1) High-temperature steam curing of the track slab increases the effective maintenance time and accelerates its strengthening rate. (2) Early shrinkage of the track slab is the primary factor causing warping deformation. (3) During the steam curing period, the warping deformation of the track slab can be controlled economically and effectively by employing secondary water spraying and presetting a reverse arch of 0.5 mm-0.8 mm.
引用
收藏
页数:14
相关论文
共 50 条
  • [21] Design of Railway Track for Speed and High-speed Railways
    Hodas, Stanislav
    XXIII R-S-P SEMINAR, THEORETICAL FOUNDATION OF CIVIL ENGINEERING (23RSP) (TFOCE 2014), 2014, 91 : 256 - 261
  • [22] Investigation of the seismic performance of CRTS III slab ballastless track of high-speed railway under low-cycle reciprocating load
    Liu, Lili
    Jiang, Lizhong
    Zhou, Wangbao
    Peng, Donghang
    Liu, Xiang
    SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2022, 161
  • [23] Experimental study on temperature distribution of CRTS II ballastless track on high-speed railway bridge in summer
    Zhao, Lei
    Zhou, Lingyu
    Zhang, Yingying
    Yuan, Yahui
    Zou, Lifan
    Yu, Zhiwu
    Journal of Railway Science and Engineering, 2021, 18 (02) : 287 - 296
  • [24] Simplified seismic model of CRTS II ballastless track structure on high-speed railway bridges in China
    Guo, Wei
    Hu, Yao
    Gou, Hongye
    Du, Qiaodan
    Fang, Wenbin
    Jiang, Lizhong
    Yu, Zhiwu
    ENGINEERING STRUCTURES, 2020, 211
  • [25] Behavior of High-Speed Railway Ballastless Track Slabs Using Reactive Powder Concrete Materials
    Yang, Jian
    Kong, Bo
    Cai, C. S.
    Wang, Jin Sheng
    JOURNAL OF TRANSPORTATION ENGINEERING, 2016, 142 (08) : 04016031
  • [26] Fatigue characteristics of CRTS bi-block ballastless track on continuous bridge of high-speed railway
    Yan B.
    Huang J.
    Xie H.
    Pan W.
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2023, 55 (07): : 52 - 59
  • [27] RAILWAY TRACK FOR HIGH-SPEED AND HEAVY TRAFFIC
    ORMISTON, H
    EMERSON, AI
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1973, 54 (AUG): : 563 - 565
  • [28] Track shifting technology for track maintenance of high-speed railway
    Xu, Lingyan
    Yuan, Wei
    Xie, Jian
    Xie, Haoran
    Zang, Chuanzhen
    Yue, Tong
    Journal of Railway Science and Engineering, 2024, 21 (07) : 2557 - 2568
  • [29] Dynamic effects and structure optimization of damping layers of CRTS III slab ballastless track for high speed railway
    Xin T.
    Zhang Q.
    Gao L.
    Zhao L.
    Qu J.
    Zhongguo Tiedao Kexue/China Railway Science, 2016, 37 (05): : 1 - 7
  • [30] Seismic Damage Mechanism of CRTS-II Slab Ballastless Track Structure on High-Speed Railway Bridges
    Guo, Wei
    Hu, Yao
    Hou, Wenqi
    Gao, Xia
    Bu, Dan
    Xie, Xu
    INTERNATIONAL JOURNAL OF STRUCTURAL STABILITY AND DYNAMICS, 2020, 20 (01)