Two-agent single-machine scheduling with a rate-modifying activity

被引:5
|
作者
Phosavanh, Johnson [1 ]
Oron, Daniel [1 ]
机构
[1] Univ Sydney, Business Sch, Sydney, NSW 2006, Australia
关键词
Scheduling; Single machine; Dynamic programming; Two-agents; MINIMIZE;
D O I
10.1016/j.ejor.2023.08.002
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We study single-machine scheduling problems involving a rate-modifying activity and two competing agents with due-date-related functions. Classical scheduling models assume that job processing times re-main constant over time; however, in real-world settings, processing times may change due to factors such as technological upgrades or machine maintenance. We complement this with the notion of multiple independent agents competing over the use of a shared resource, each with their own motives. These considerations allow us to model the upcoming trend of the sharing economy, where resources are shared amongst independent competitors in the market. We aim to model these scenarios by considering a variety of scheduling criteria for each agent, including the makespan, the number of late jobs, and the total late work. To account for the change in processing times, we consider an optional rate-modifying activity that once completed, results in a reduction in subsequent job processing times. We show that problems involving the total late work are binary N P-hard and propose efficient pseudo-polynomial dynamic programming algorithms for solving these problems. We also show that the remaining problems are solvable in polynomial time. Crown Copyright (c) 2023 Published by Elsevier B.V. This is an open access article under the CC BY-NC-ND license ( http://creativecommons.org/licenses/by-nc-nd/4.0/ )
引用
收藏
页码:866 / 876
页数:11
相关论文
共 50 条
  • [41] Common due-window assignment for single-machine scheduling with generalized earliness/tardiness penalties and a rate-modifying activity
    Wang, Ji-Bo
    Hu, Yang
    Zhang, Bo
    ENGINEERING OPTIMIZATION, 2021, 53 (03) : 496 - 512
  • [42] Single-machine time-dependent scheduling problems with fixed rate-modifying activities and resumable jobs
    Arigliano, Anna
    Ghiani, Gianpaolo
    Grieco, Antonio
    Guerriero, Emanuela
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2017, 15 (02): : 201 - 215
  • [43] Two-agent single-machine scheduling with release dates and preemption to minimize the maximum lateness
    Yuan, J. J.
    Ng, C. T.
    Cheng, T. C. E.
    JOURNAL OF SCHEDULING, 2015, 18 (02) : 147 - 153
  • [44] A two-agent single-machine scheduling problem to minimize the total cost with release dates
    Wang, Du-Juan
    Yin, Yunqiang
    Wu, Wen-Hsiang
    Wu, Wen-Hung
    Wu, Chin-Chia
    Hsu, Peng-Hsiang
    SOFT COMPUTING, 2017, 21 (03) : 805 - 816
  • [45] A two-agent single-machine scheduling problem to minimize the total cost with release dates
    Du-Juan Wang
    Yunqiang Yin
    Wen-Hsiang Wu
    Wen-Hung Wu
    Chin-Chia Wu
    Peng-Hsiang Hsu
    Soft Computing, 2017, 21 : 805 - 816
  • [46] AN EXACT AND META-HEURISTIC APPROACH FOR TWO-AGENT SINGLE-MACHINE SCHEDULING PROBLEM
    Wu, Wen-Hung
    JOURNAL OF MARINE SCIENCE AND TECHNOLOGY-TAIWAN, 2013, 21 (02): : 215 - 221
  • [47] A two-agent single-machine scheduling problem with a time-based learning effect
    Liu, Peng
    Rong, Nan
    Yi, Na
    2012 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS (ICAL), 2012, : 641 - 645
  • [48] A subset-sum type formulation of a two-agent single-machine scheduling problem
    Avolio, Matteo
    Fuduli, Antonio
    INFORMATION PROCESSING LETTERS, 2020, 155
  • [49] Two-agent scheduling problems on a single-machine to minimize the total weighted late work
    Zhang Xingong
    Wang Yong
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2017, 33 (03) : 945 - 955
  • [50] Two-agent scheduling problems on a single-machine to minimize the total weighted late work
    Zhang Xingong
    Wang Yong
    Journal of Combinatorial Optimization, 2017, 33 : 945 - 955