Two-agent single-machine scheduling with a rate-modifying activity

被引:5
|
作者
Phosavanh, Johnson [1 ]
Oron, Daniel [1 ]
机构
[1] Univ Sydney, Business Sch, Sydney, NSW 2006, Australia
关键词
Scheduling; Single machine; Dynamic programming; Two-agents; MINIMIZE;
D O I
10.1016/j.ejor.2023.08.002
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We study single-machine scheduling problems involving a rate-modifying activity and two competing agents with due-date-related functions. Classical scheduling models assume that job processing times re-main constant over time; however, in real-world settings, processing times may change due to factors such as technological upgrades or machine maintenance. We complement this with the notion of multiple independent agents competing over the use of a shared resource, each with their own motives. These considerations allow us to model the upcoming trend of the sharing economy, where resources are shared amongst independent competitors in the market. We aim to model these scenarios by considering a variety of scheduling criteria for each agent, including the makespan, the number of late jobs, and the total late work. To account for the change in processing times, we consider an optional rate-modifying activity that once completed, results in a reduction in subsequent job processing times. We show that problems involving the total late work are binary N P-hard and propose efficient pseudo-polynomial dynamic programming algorithms for solving these problems. We also show that the remaining problems are solvable in polynomial time. Crown Copyright (c) 2023 Published by Elsevier B.V. This is an open access article under the CC BY-NC-ND license ( http://creativecommons.org/licenses/by-nc-nd/4.0/ )
引用
收藏
页码:866 / 876
页数:11
相关论文
共 50 条
  • [31] Two-agent single-machine scheduling to minimize resource consumption with a constraint on the makespan
    Liu, Peng P
    Tian, Xiaoyu
    PROCEEDINGS OF 2013 6TH INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING (ICIII 2013) VOL 1, 2013, : 487 - 489
  • [32] An investigation on a two-agent single-machine scheduling problem with unequal release dates
    Yin, Yunqiang
    Wu, Wen-Hsiang
    Cheng, Shuenn-Ren
    Wu, Chin-Chia
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (12) : 3062 - 3073
  • [33] Two-agent single-machine scheduling problem with just-in-time jobs
    Choi, Byung-Cheon
    Chung, Jibok
    THEORETICAL COMPUTER SCIENCE, 2014, 543 : 37 - 45
  • [34] Two-agent single-machine scheduling with position-dependent processing times
    Peng Liu
    Xiaoye Zhou
    Lixin Tang
    The International Journal of Advanced Manufacturing Technology, 2010, 48 : 325 - 331
  • [35] Two-agent single-machine scheduling problems under increasing linear deterioration
    Liu, Peng
    Yi, Na
    Zhou, Xiaoye
    APPLIED MATHEMATICAL MODELLING, 2011, 35 (05) : 2290 - 2296
  • [36] Two-agent single-machine scheduling with position-dependent processing times
    Liu, Peng
    Zhou, Xiaoye
    Tang, Lixin
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 48 (1-4): : 325 - 331
  • [37] Single-machine two-agent scheduling involving a just-in-time criterion
    Shabtay, Dvir
    Dover, Omri
    Kaspi, Moshe
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (09) : 2590 - 2604
  • [38] Two-Agent Single-Machine Scheduling with Resource-Dependent Starting Times
    Liu, Peng
    Tian, Xiaoyu
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2013, 2013
  • [39] Solving a two-agent single-machine scheduling problem considering learning effect
    Li, Der-Chiang
    Hsu, Peng-Hsiang
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (07) : 1644 - 1651
  • [40] Single-machine due-window assignment and scheduling with resource allocation, aging effect, and a deteriorating rate-modifying activity
    Ji, Min
    Ge, Jiaojiao
    Chen, Ke
    Cheng, T. C. E.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 66 (04) : 952 - 961