共 50 条
- [41] Hybrid genetic algorithm for resource constrained multi-project scheduling problem Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2009, 43 (01): : 23 - 27
- [42] A Hybrid Genetic Algorithm for the Resource Constrained Multi-Project Scheduling Problem ETFA 2005: 10TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 2, PROCEEDINGS, 2005,
- [43] Hierarchy Model for Distributed Resource Constrained Multi-project Scheduling Problem 2019 5TH INTERNATIONAL CONFERENCE ON INDUSTRIAL AND BUSINESS ENGINEERING (ICIBE 2019), 2019, : 123 - 127
- [44] The Multi-Mode Resource-Constrained Multi-Project Scheduling ProblemThe MISTA 2013 challenge Journal of Scheduling, 2016, 19 : 271 - 283
- [45] Resource-constrained project scheduling problem with reworking Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774
- [49] Development of hybrid genetic algorithm for the resource constrained multi-project scheduling problem PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE 2005, VOL 3, PTS A AND B, 2005, : 1075 - 1082