Project Management is becoming increasingly crucial in competitive environments such as manufacturing and the service industries. The Resource-Constrained Multi-Project Scheduling Problem (RCMPSP) consists of assigning start times to jobs corresponding to two or more projects that must be executed simulta-neously while respecting the precedence between jobs and limited resources. The existing rise in the study of the RCMPSP resulted in numerous works on the topic while proposing different problem fea-tures. This research analyzes different variants of the problem based on aspects related to jobs, projects, relationships, resources, and time management. Moreover, based on the problem variants considered in the collected works, a taxonomy allowing (i) the identification and positioning of each RCMPSP variant and (ii) the analysis of the current state-of-the-art of the problem is proposed. In addition, the solution methods proposed to solve RCMPSPs are classified and analyzed, together with the benchmarks used to validate such approaches. Finally, this review paper discusses the RCMPSP connection to practice and provides future research opportunities in light of recent advances.(c) 2022 Published by Elsevier B.V. This is an open access article under the CC BY-NC-ND license ( http://creativecommons.org/licenses/by-nc-nd/4.0/ )
机构:
Faculty of Industrial Engineering, K.N. Toosi University of Technology, TehranFaculty of Industrial Engineering, K.N. Toosi University of Technology, Tehran
Nabipoor Afruzi E.
Aghaie A.
论文数: 0引用数: 0
h-index: 0
机构:
Faculty of Industrial Engineering, K.N. Toosi University of Technology, TehranFaculty of Industrial Engineering, K.N. Toosi University of Technology, Tehran
Aghaie A.
Najafi A.A.
论文数: 0引用数: 0
h-index: 0
机构:
Faculty of Industrial Engineering, K.N. Toosi University of Technology, TehranFaculty of Industrial Engineering, K.N. Toosi University of Technology, Tehran