Strategy selection for multi-objective redundancy allocation problem in a k-out-of-n system considering the mean time to failure

被引:6
|
作者
Azizi, Soheil [1 ]
Mohammadi, Milad [2 ]
机构
[1] Allameh Tabatabae Univ, Fac Accounting & Management, Tehran, Iran
[2] Univ Isfahan, Dept Management, Esfahan, Iran
关键词
Redundancy allocation problem; Mean time to failure; Multi-objective optimization; k-Out-of-n system; DIFFERENTIAL EVOLUTION ALGORITHM; SWARM OPTIMIZATION ALGORITHM; SERIES-PARALLEL SYSTEMS; COLD-STANDBY SYSTEMS; RELIABILITY OPTIMIZATION; SUPPLIER SELECTION; COMPONENTS; DESIGN; UNCERTAIN; TOPSIS;
D O I
10.1007/s12597-023-00635-2
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents a redundancy allocation problem (RAP) to maximize the mean time to failure (MTTF) and minimize the costs for a k-out-of-n system with several subsystems. In this model, each subsystem requires at least K flawless components to be active. The components can be configured in parallel, standby or single modes. However, several types of components can be selected in each subsystem. The importance of this study is due to selecting the conditions in which the system is at its best considering the trade-off between total cost and reliability. The main contribution of the article is to propose a more realistic multi-objective model in which the MTTF of the system, weight and volume limitations, and the mixed redundancy strategy (including the cold standby RAP) are considered to achieve the optimal strategy for the configuration of components in a series system with several subsystems. Beside these contributions, four multi-objective metaheuristic algorithms are applied to solve the proposed model. The algorithms are compared by C (L, B) and Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) methods. According to the results, the non-dominated sorting genetic algorithm (NSGA-II) is selected as the superior algorithm. Finally, by comparing the selected final solutions of the algorithms in different weights of the TOPSIS method, it was found that the parallel strategy has the least solutions in the final result among all algorithms. Besides, the best solutions with the highest MTTF and the lowest cost are related to more use of the cold-standby strategy. As a result, configuring components with more use of the cold-standby strategy and combined with the single-component strategy can provide better conditions for the system.
引用
收藏
页码:1021 / 1044
页数:24
相关论文
共 50 条
  • [41] Reliability analysis of k-out-of-n: G repairable systems considering common cause failure and multi-level maintenance strategy
    Dong, Qinglai
    Liu, Pin
    Jia, Xujie
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2024, 238 (01) : 44 - 59
  • [42] Pruning Algorithm for Multi-Objective Optimization with Decision Maker's Preferences of System Redundancy Allocation Problem
    Sooktip, Tipwimol
    Wattanapongsakorn, Naruemon
    2014 INTERNATIONAL CONFERENCE ON IT CONVERGENCE AND SECURITY (ICITCS), 2014,
  • [43] Optimal Design of a Repairable k-out-of-n System Considering Maintenance
    Moghaddass, Ramin
    Zuo, Ming J.
    ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM (RAMS), 2011 PROCEEDINGS, 2011,
  • [44] Bounds for the mean residual life function of a k-out-of-n system
    Raqab, Mohammad Z.
    Rychlik, Tomasz
    METRIKA, 2011, 74 (03) : 361 - 380
  • [45] Redundancy allocation problem in repairable k-out-of-n systems with cold, warm, and hot standby: A genetic algorithm for availability optimization
    Oszczypala, Mateusz
    Ziolkowski, Jaroslaw
    Malachowski, Jerzy
    APPLIED SOFT COMPUTING, 2024, 165
  • [46] Inspection policy optimization for a k-out-of-n/Cl(k′,n′;F) system considering failure dependence: a case study
    Zhao, Fei
    Peng, Rui
    Zhang, Nan
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2023, 237
  • [47] Optimization partial mission abandonment strategy for k-out-of-n multi-state system
    Zhao, Xian
    Zhang, Jiwen
    Wu, Congshan
    Wang, Xinlei
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 187
  • [48] Reliability optimization model for k-out-of-n:G systems based on mixed redundancy strategy
    Zhang J.
    Lyu H.
    Hou J.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (03): : 852 - 863
  • [49] Optimization of time based fuzzy multi-objective reliability redundancy allocation problem for xj - out - of - m system using tuning and neighborhood based fuzzy MOPSO algorithm
    De, Satyajit
    Rakshit, Payel
    Chowdhury, Anil Bikash
    APPLIED SOFT COMPUTING, 2023, 149
  • [50] Multi-objective reliability-redundancy allocation problem using particle swarm optimization
    Garg, Harish
    Sharma, S. P.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 64 (01) : 247 - 255