Strategy selection for multi-objective redundancy allocation problem in a k-out-of-n system considering the mean time to failure

被引:6
|
作者
Azizi, Soheil [1 ]
Mohammadi, Milad [2 ]
机构
[1] Allameh Tabatabae Univ, Fac Accounting & Management, Tehran, Iran
[2] Univ Isfahan, Dept Management, Esfahan, Iran
关键词
Redundancy allocation problem; Mean time to failure; Multi-objective optimization; k-Out-of-n system; DIFFERENTIAL EVOLUTION ALGORITHM; SWARM OPTIMIZATION ALGORITHM; SERIES-PARALLEL SYSTEMS; COLD-STANDBY SYSTEMS; RELIABILITY OPTIMIZATION; SUPPLIER SELECTION; COMPONENTS; DESIGN; UNCERTAIN; TOPSIS;
D O I
10.1007/s12597-023-00635-2
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents a redundancy allocation problem (RAP) to maximize the mean time to failure (MTTF) and minimize the costs for a k-out-of-n system with several subsystems. In this model, each subsystem requires at least K flawless components to be active. The components can be configured in parallel, standby or single modes. However, several types of components can be selected in each subsystem. The importance of this study is due to selecting the conditions in which the system is at its best considering the trade-off between total cost and reliability. The main contribution of the article is to propose a more realistic multi-objective model in which the MTTF of the system, weight and volume limitations, and the mixed redundancy strategy (including the cold standby RAP) are considered to achieve the optimal strategy for the configuration of components in a series system with several subsystems. Beside these contributions, four multi-objective metaheuristic algorithms are applied to solve the proposed model. The algorithms are compared by C (L, B) and Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) methods. According to the results, the non-dominated sorting genetic algorithm (NSGA-II) is selected as the superior algorithm. Finally, by comparing the selected final solutions of the algorithms in different weights of the TOPSIS method, it was found that the parallel strategy has the least solutions in the final result among all algorithms. Besides, the best solutions with the highest MTTF and the lowest cost are related to more use of the cold-standby strategy. As a result, configuring components with more use of the cold-standby strategy and combined with the single-component strategy can provide better conditions for the system.
引用
收藏
页码:1021 / 1044
页数:24
相关论文
共 50 条
  • [21] Multi-objective redundancy allocation problem considering instantaneous availability, reparability, interference factor and load share
    Seyed Mohammad Mortazavi
    Seyed Hosein Torabi
    Life Cycle Reliability and Safety Engineering, 2019, 8 (4) : 315 - 328
  • [22] Multi-objective System Reliability-redundancy Allocation in a Power Plant by Considering Three Targets
    Chebouba, Billal Nazim
    Mellal, Mohamed Arezki
    Adjerid, Smail
    Lounici, Yacine
    2020 7TH INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT'20), VOL 1, 2020, : 674 - 678
  • [23] Multi-objective design optimisation of repairable k-out-of-n subsystems in series with redundant dependency
    Habib, Milia
    Yalaoui, Farouk
    Chehade, Hicham
    Jarkass, Iman
    Chebbo, Nazir
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (23) : 7000 - 7021
  • [24] Mean time to failure of a k-out-of-n system with a single cold standby unit having dependent components
    Roy, Achintya
    Gupta, Nitin
    COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2024,
  • [25] A robust loss function approach for a multi-objective redundancy allocation problem
    Salmasnia, Ali
    Ameri, Ehsan
    Niaki, Seyed Taghi Akhavan
    APPLIED MATHEMATICAL MODELLING, 2016, 40 (01) : 635 - 645
  • [26] On the mean residual life of a generalized k-out-of-n system
    Goliforushani, S.
    Xie, M.
    Balakrishnan, N.
    COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2018, 47 (10) : 2362 - 2372
  • [27] Application of multi-objective particle swarm optimization to solve a fuzzy multi-objective reliability redundancy allocation problem
    Ebrahimipour, V.
    Sheikhalishahi, M.
    2011 IEEE INTERNATIONAL SYSTEMS CONFERENCE (SYSCON 2011), 2011, : 326 - 333
  • [28] Optimization of time-dependent fuzzy multi-objective reliability redundancy allocation problem for n-stage series-parallel system
    De, Satyajit
    Roy, Pratik
    Roy, Siddhartha
    Chowdhury, Anil Bikash
    INNOVATIONS IN SYSTEMS AND SOFTWARE ENGINEERING, 2023,
  • [29] Stochastic comparison on active redundancy allocation to K-out-of-N systems with statistically dependent component and redundancy lifetimes
    You, Yinping
    Li, Xiaohu
    Li, Xiaoqin
    ADVANCES IN APPLIED PROBABILITY, 2023, 55 (04) : 1085 - 1115
  • [30] Mission abort strategy for generalized k-out-of-n: F systems considering competing failure criteria
    Cao, Shuai
    Wang, Xiaoyue
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2024, 238 (04) : 839 - 852