A reactive scheduling approach for the resource-constrained project scheduling problem with dynamic resource disruption

被引:3
|
作者
Xu, Jiaojiao [1 ]
Bai, Sijun [1 ]
机构
[1] Northwestern Polytech Univ, Sch Management, Xian, Peoples R China
关键词
Project scheduling; Dynamic resource disruption; Reactive schedule; Hybrid genetic algorithm; VACATIONS; ALGORITHM; SEARCH; MODELS;
D O I
10.1108/K-09-2022-1339
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
PurposeThis paper aims to develop an algorithm to study the impact of dynamic resource disruption on project makespan and provide a suitable resource disruption ratio for various complex industrial and emergency projects.Design/methodology/approachThis paper addresses the RCPSP in dynamic environments, which assumes resources will be disrupted randomly, that is, the information about resource disruption is not known in advance. To this end, a reactive scheduling model is proposed for the case of random dynamic disruptions of resources. To solve the reactive scheduling model, a hybrid genetic algorithm with a variable neighborhood search is proposed.FindingsThe results obtained on the PSLIB instances prove the performance advantage of the algorithm; through sensitivity analysis, it can be obtained, the project makespan increases exponentially as the number of disruptions increase. Furthermore, if more than 50% of the project's resources are randomly disrupted, the project makespan will be significantly impacted.Originality/valueThe paper focuses on the impact of dynamic resource disruptions on project makespan. Few studies have considered stochastic, dynamic resource uncertainty. In addition, this research proposes a reasonable scheduling algorithm for the research problem, and the conclusions drawn from the research provide decision support for project managers.
引用
收藏
页码:2007 / 2028
页数:22
相关论文
共 50 条
  • [21] Periodically aggregated resource-constrained project scheduling problem
    Morin, Pierre-Antoine
    Artigues, Christian
    Hait, Alain
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2017, 11 (06) : 792 - 817
  • [22] Genetic algorithm for the resource-constrained project scheduling problem
    E. N. Goncharov
    V. V. Leonov
    Automation and Remote Control, 2017, 78 : 1101 - 1114
  • [23] Integration of routing into a resource-constrained project scheduling problem
    Lacomme, Philippe
    Moukrim, Aziz
    Quilliot, Alain
    Vinot, Marina
    EURO JOURNAL ON COMPUTATIONAL OPTIMIZATION, 2019, 7 (04) : 421 - 464
  • [24] Memetic algorithm for the resource-constrained project scheduling problem
    Chen, Di
    Liu, Shixin
    Qin, Shujin
    2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 4991 - 4996
  • [25] Resource-Constrained Project Scheduling Problem with Modified PSO
    Zhang, Kai
    Jiang, Jing
    Zhao, Guo-rong
    ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION, VOL 6: MODELLING & SIMULATION INDUSTRIAL ENGINEERING & MANAGEMENT, 2010, : 308 - 311
  • [26] An evolution programme for the resource-constrained project scheduling problem
    Cheng, RW
    Gen, M
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1998, 11 (03) : 274 - 287
  • [27] A hybrid metaheuristic for the resource-constrained project scheduling problem
    Tseng, Lin-Yu
    Chen, Shih-Chieh
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (02) : 707 - 721
  • [28] A Population-Based Approach to the Resource-Constrained Project Scheduling Problem
    Vicente Valls
    Francisco Ballestín
    Sacramento Quintanilla
    Annals of Operations Research, 2004, 131 : 305 - 324
  • [29] A population-based approach to the resource-constrained project scheduling problem
    Valls, V
    Ballestín, F
    Quintanilla, S
    ANNALS OF OPERATIONS RESEARCH, 2004, 131 (1-4) : 305 - 324
  • [30] Algorithm for Resource-constrained Project Scheduling Problem With Resource Transfer Time
    Lu Z.-Q.
    Liu X.-Y.
    Lu, Zhi-Qiang (zhiqianglu@tongji.edu.cn), 2018, Science Press (44): : 1028 - 1036