Study of Water-Sand Inrush through a Vertical Karst Conduit Uncovered through Tunnel Excavation

被引:5
|
作者
Zhao, Zhenhua [1 ,2 ]
Wang, Hailong [1 ,2 ,3 ,4 ]
Han, Lin [1 ,2 ]
Zhao, Zhenlong [3 ]
机构
[1] Shandong Prov Bur Geol & Mineral Resources, 801 Hydrogeol & Engn Geol Brigade, Jinan 250014, Peoples R China
[2] Shandong Engn Res Ctr Environm Protect & Remediat, Jinan 250014, Peoples R China
[3] Linyi Univ, Sch Civil Engn & Architecture, Linyi 276000, Peoples R China
[4] China Univ Min & Technol Beijing, State Key Lab Geomech & Deep Underground Engn, Beijing 100083, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
water-sand inrush; vertical karst conduit; tunnel excavation; water-sand flow; distribution of water pressure; ATTRIBUTE RECOGNITION MODEL; ENGINEERING PROBLEMS; CAVE; MECHANISM; CONSTRUCTION; THICKNESS; AREA;
D O I
10.3390/w15112010
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The existence of karst compromises the safety of underground engineering, especially during tunnel excavations. Karst conduits are uncovered through tunnel excavations, which may lead to a water-sand inrush disaster. Taking a vertical karst conduit as an example, the process of water-sand inrush through a karst conduit could be viewed as being similar to the process whereby a water-sand mixture flows through the discharge opening of a storage bin. In this study, based on force analysis of a non-aqueous sand body above a karst conduit, the limiting diameter of the karst conduit under force equilibrium was obtained. Considering the effect of water on aqueous sand bodies, the criterion of water-sand inrush was established. We aimed to study water-sand migration and inrush through vertical karst conduits in order to obtain the distribution of the water pressure near a vertical karst conduit, and to explore the relationship between the conduit size, water pressure, and water-sand flow rate; therefore, a simulated testing system for analyzing water-sand inrush through a vertical karst conduit was developed. When the water pressure in the testing chamber was close to the critical head pressure of the water-sand inrush, the water-sand inrush exhibited a pattern of instability-migration-deposition-stability. When the water pressure in the testing chamber exceeded the critical head pressure, the water-sand flow increased first and then stabilized over time. With the increase in the set values of the water pressure and conduit size, the steady flow of the water-sand mixture increased gradually. When the karst conduit was opened suddenly, the actual water pressure in the testing chamber decreased significantly, due to the water-sand mixture flowing out of the testing chamber and the water supply lagging behind. With the stabilization of the water-sand flow, the actual water pressure gradually tended towards stability, but it was still lower than the initial set water pressure. When the karst conduit was opened, the values of the water pressure monitored by the pore pressure gauges all clearly decreased. With the stabilization of the water-sand flow, the water pressure gradually became stable. With the increase in the distance between the pore pressure sensor and the karst conduit, the water pressure values all increased gradually. These test results are significant for further studies of the formation mechanisms of water-sand inrush through vertical karst conduits.
引用
收藏
页数:22
相关论文
共 50 条
  • [41] Experimental Study on the Mud-Water Inrush Characteristics through Rock Fractures
    Zhao, YanLin
    Zhang, LianYang
    ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [42] Research on the TBM Tunnel Passing through Bad Geological Technology and Water Inrush Emergency Measures in Reclamation Area
    填海区TBM穿越不良地层及突水应急措施研究
    Jiang, Pan, 1600, Editorial Department of Journal of Railway Engineering Society (37):
  • [43] Research on risk assessment system for water inrush in the karst tunnel construction based on GIS: Case study on the diversion tunnel groups of the Jinping II Hydropower Station
    Li, Xueping
    Li, Yunan
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2014, 40 : 182 - 191
  • [44] Application of comprehensive prediction method of water inrush hazards induced by unfavourable geological body in high risk karst tunnel: a case study
    Shi, Shaoshuai
    Bu, Lin
    Li, Shucai
    Xiong, Ziming
    Xie, Xiaokun
    Li, Liping
    Zhou, Zongqing
    Xu, Zhenhao
    Ma, Dan
    GEOMATICS NATURAL HAZARDS & RISK, 2017, 8 (02) : 1407 - 1423
  • [45] Mechanism investigation on water and mud inrush disasters when Wangjiazhai tunnel passing through the Tertiary water-rich sandstone strata
    Zhang, Qingzhao
    Tong, Zehao
    Shen, Danyi
    Luo, Zejun
    Ding, Wenqi
    Xu, Haodong
    ENVIRONMENTAL EARTH SCIENCES, 2024, 83 (16)
  • [46] Study on multi-field catastrophe evolution laws of water inrush from concealed karst cave in roadway excavation: a case of Jiyuan coal mine
    Li, Bo
    Wang, Xianqing
    Liu, Zijie
    Li, Tao
    GEOMATICS NATURAL HAZARDS & RISK, 2021, 12 (01) : 222 - 243
  • [47] Water-inrush Risk through Fault Zones with Multiple Karst Aquifers Underlying the Coal Floor: A Case Study in the Liuzhuang Coal Mine, Southern China
    Zhang, Jian
    Guo, Liangliang
    Mu, Wenping
    Liu, Shouqiang
    Zhao, Dexing
    MINE WATER AND THE ENVIRONMENT, 2021, 40 (04) : 1037 - 1047
  • [48] A case study of water inrush incident through fault zone in China and the corresponding treatment measures
    Qian, Ziwei
    Huang, Zhen
    Song, Jianguo
    ARABIAN JOURNAL OF GEOSCIENCES, 2018, 11 (14)
  • [49] Migration of Water and Sand Inrush through the Mining-Induced Caving Zone: Insights from Model Test and Numerical Analysis
    Liang, Yankun
    Yuan, Shichong
    Ma, Shuang
    Han, Guilei
    Shi, Jiabin
    WATER, 2024, 16 (17)
  • [50] A case study of water inrush incident through fault zone in China and the corresponding treatment measures
    Ziwei Qian
    Zhen Huang
    Jianguo Song
    Arabian Journal of Geosciences, 2018, 11