Study of Water-Sand Inrush through a Vertical Karst Conduit Uncovered through Tunnel Excavation

被引:5
|
作者
Zhao, Zhenhua [1 ,2 ]
Wang, Hailong [1 ,2 ,3 ,4 ]
Han, Lin [1 ,2 ]
Zhao, Zhenlong [3 ]
机构
[1] Shandong Prov Bur Geol & Mineral Resources, 801 Hydrogeol & Engn Geol Brigade, Jinan 250014, Peoples R China
[2] Shandong Engn Res Ctr Environm Protect & Remediat, Jinan 250014, Peoples R China
[3] Linyi Univ, Sch Civil Engn & Architecture, Linyi 276000, Peoples R China
[4] China Univ Min & Technol Beijing, State Key Lab Geomech & Deep Underground Engn, Beijing 100083, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
water-sand inrush; vertical karst conduit; tunnel excavation; water-sand flow; distribution of water pressure; ATTRIBUTE RECOGNITION MODEL; ENGINEERING PROBLEMS; CAVE; MECHANISM; CONSTRUCTION; THICKNESS; AREA;
D O I
10.3390/w15112010
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The existence of karst compromises the safety of underground engineering, especially during tunnel excavations. Karst conduits are uncovered through tunnel excavations, which may lead to a water-sand inrush disaster. Taking a vertical karst conduit as an example, the process of water-sand inrush through a karst conduit could be viewed as being similar to the process whereby a water-sand mixture flows through the discharge opening of a storage bin. In this study, based on force analysis of a non-aqueous sand body above a karst conduit, the limiting diameter of the karst conduit under force equilibrium was obtained. Considering the effect of water on aqueous sand bodies, the criterion of water-sand inrush was established. We aimed to study water-sand migration and inrush through vertical karst conduits in order to obtain the distribution of the water pressure near a vertical karst conduit, and to explore the relationship between the conduit size, water pressure, and water-sand flow rate; therefore, a simulated testing system for analyzing water-sand inrush through a vertical karst conduit was developed. When the water pressure in the testing chamber was close to the critical head pressure of the water-sand inrush, the water-sand inrush exhibited a pattern of instability-migration-deposition-stability. When the water pressure in the testing chamber exceeded the critical head pressure, the water-sand flow increased first and then stabilized over time. With the increase in the set values of the water pressure and conduit size, the steady flow of the water-sand mixture increased gradually. When the karst conduit was opened suddenly, the actual water pressure in the testing chamber decreased significantly, due to the water-sand mixture flowing out of the testing chamber and the water supply lagging behind. With the stabilization of the water-sand flow, the actual water pressure gradually tended towards stability, but it was still lower than the initial set water pressure. When the karst conduit was opened, the values of the water pressure monitored by the pore pressure gauges all clearly decreased. With the stabilization of the water-sand flow, the water pressure gradually became stable. With the increase in the distance between the pore pressure sensor and the karst conduit, the water pressure values all increased gradually. These test results are significant for further studies of the formation mechanisms of water-sand inrush through vertical karst conduits.
引用
收藏
页数:22
相关论文
共 50 条
  • [21] Risk assessment of water inrush in karst shallow tunnel with stable surface water supply: Case study
    Xu, Zengguang
    Xian, Meiting
    Li, Xiaofeng
    Zhou, Wei
    Wang, Jiaming
    Wang, Yaping
    Chai, Junrui
    GEOMECHANICS AND ENGINEERING, 2021, 25 (06) : 495 - 508
  • [22] Experimental Study on the Process of Water Inrush and Sand Collapse in Tunnel Cracks in Sand-Pebble Formations
    Mu, H. P.
    Wang, L.
    Zhu, J. M.
    Wang, Z. C.
    INDIAN GEOTECHNICAL JOURNAL, 2025,
  • [23] Mitigation of Karst Tunnel Water Inrush during Operation in Seasonal Variation Zone: Case Study in Nanshibi Tunnel
    Lan, Xiongdong
    Zhang, Xiao
    Yin, Zhanchao
    Li, Xianghui
    Yang, Teng
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2021, 35 (03)
  • [24] Safety risk perception and control of water inrush during tunnel excavation in karst areas: An improved uncertain information fusion method
    Wu, Xianguo
    Feng, Zongbao
    Yang, Sai
    Qin, Yawei
    Chen, Hongyu
    Liu, Yang
    AUTOMATION IN CONSTRUCTION, 2024, 163
  • [25] A Case Study for Escape Route Optimization after Water Inrush in a Backward Excavated Karst Tunnel
    Li, S. C.
    Wu, J.
    Xu, Z. H.
    Li, L. P.
    Huang, X.
    Xue, Y. G.
    Wang, Z. C.
    GEO-CHINA 2016: EMERGING TECHNOLOGIES IN TUNNEL ENGINEERING, MODELING, DESIGN, CONSTRUCTION, REPAIR, AND REHABILITATION, 2016, (260): : 100 - 108
  • [26] Experimental Study on the Segmental Tunnel Collapse Induced by Water and Sand Inrush in the Connecting Passage
    Liu, Xian
    Sun, Qi-Hao
    Fan, Sen
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2024, 37 (09): : 119 - 132
  • [27] Identification of geological structure which induced heavy water and mud inrush in tunnel excavation: A case study on Lingjiao tunnel
    Li, Xiaozhao
    Zhang, Peixing
    He, Zhicheng
    Huang, Zhen
    Cheng, Menglin
    Guo, Liang
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2017, 69 : 203 - 208
  • [28] Experimental Study on Similar Materials for Fluid–Solid Coupling for Model Test of Water Inrush in Karst Tunnel
    Wenlong Wu
    Jiaqi Guo
    Xiliang Liu
    Zhengguo Zhu
    Erbo Wang
    Geotechnical and Geological Engineering, 2023, 41 : 4119 - 4135
  • [29] Analysis on the safe distance between shield tunnel through sand stratum and underlying karst cave
    Wang, Wei
    Gao, Shiming
    Liu, Lingfeng
    Wen, Wushuang
    Li, Ping
    Chen, Jianping
    GEOSYSTEM ENGINEERING, 2019, 22 (02) : 81 - 90
  • [30] Analysis and Application of Lining Resistance to Water Pressure in Tunnel through Karst Cave
    Huang, Mingli
    Li, Jiacheng
    Yang, Ze
    Zhang, Zhien
    Song, Yuan
    APPLIED SCIENCES-BASEL, 2022, 12 (15):