Study of Water-Sand Inrush through a Vertical Karst Conduit Uncovered through Tunnel Excavation

被引:5
|
作者
Zhao, Zhenhua [1 ,2 ]
Wang, Hailong [1 ,2 ,3 ,4 ]
Han, Lin [1 ,2 ]
Zhao, Zhenlong [3 ]
机构
[1] Shandong Prov Bur Geol & Mineral Resources, 801 Hydrogeol & Engn Geol Brigade, Jinan 250014, Peoples R China
[2] Shandong Engn Res Ctr Environm Protect & Remediat, Jinan 250014, Peoples R China
[3] Linyi Univ, Sch Civil Engn & Architecture, Linyi 276000, Peoples R China
[4] China Univ Min & Technol Beijing, State Key Lab Geomech & Deep Underground Engn, Beijing 100083, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
water-sand inrush; vertical karst conduit; tunnel excavation; water-sand flow; distribution of water pressure; ATTRIBUTE RECOGNITION MODEL; ENGINEERING PROBLEMS; CAVE; MECHANISM; CONSTRUCTION; THICKNESS; AREA;
D O I
10.3390/w15112010
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The existence of karst compromises the safety of underground engineering, especially during tunnel excavations. Karst conduits are uncovered through tunnel excavations, which may lead to a water-sand inrush disaster. Taking a vertical karst conduit as an example, the process of water-sand inrush through a karst conduit could be viewed as being similar to the process whereby a water-sand mixture flows through the discharge opening of a storage bin. In this study, based on force analysis of a non-aqueous sand body above a karst conduit, the limiting diameter of the karst conduit under force equilibrium was obtained. Considering the effect of water on aqueous sand bodies, the criterion of water-sand inrush was established. We aimed to study water-sand migration and inrush through vertical karst conduits in order to obtain the distribution of the water pressure near a vertical karst conduit, and to explore the relationship between the conduit size, water pressure, and water-sand flow rate; therefore, a simulated testing system for analyzing water-sand inrush through a vertical karst conduit was developed. When the water pressure in the testing chamber was close to the critical head pressure of the water-sand inrush, the water-sand inrush exhibited a pattern of instability-migration-deposition-stability. When the water pressure in the testing chamber exceeded the critical head pressure, the water-sand flow increased first and then stabilized over time. With the increase in the set values of the water pressure and conduit size, the steady flow of the water-sand mixture increased gradually. When the karst conduit was opened suddenly, the actual water pressure in the testing chamber decreased significantly, due to the water-sand mixture flowing out of the testing chamber and the water supply lagging behind. With the stabilization of the water-sand flow, the actual water pressure gradually tended towards stability, but it was still lower than the initial set water pressure. When the karst conduit was opened, the values of the water pressure monitored by the pore pressure gauges all clearly decreased. With the stabilization of the water-sand flow, the water pressure gradually became stable. With the increase in the distance between the pore pressure sensor and the karst conduit, the water pressure values all increased gradually. These test results are significant for further studies of the formation mechanisms of water-sand inrush through vertical karst conduits.
引用
收藏
页数:22
相关论文
共 50 条
  • [1] Water-sand mixture inrush through weakly cemented overburden at a shallow depth in the Yili coal mining area
    Lei S.
    Feng X.
    Shidong W.
    Arabian Journal of Geosciences, 2021, 14 (12)
  • [2] DYNAMIC ESTIMATING THE KARST TUNNEL WATER INRUSH BASED ON MONITORING DATA DURING EXCAVATION
    Kang Xiaobing
    Luo Sheng
    Xu Mo
    Zhang Qiang
    Yang Yanna
    ACTA CARSOLOGICA, 2019, 48 (01) : 117 - 127
  • [3] Tunnel excavation through confined sand aquifer and effective use of seepage water
    Imazu, M
    Mori, N
    Okuda, M
    Maeda, M
    Nishi, J
    CHALLENGES FOR THE 21ST CENTURY, VOL. 2: COMMUNICATION TUNNELS/MISCELLANEOUS INCLUDING WATER TUNNELS/MECHANISED TUNNELLING, 1999, : 695 - 702
  • [4] Water-sand inrush risk assessment method of sandy dolomite tunnel and its application in the Chenaju tunnel, southwest of China
    Dong, Jia-xing
    Shen, Zhen-luo
    Cao, Li
    Mi, Jian
    Li, Jian-guo
    Zhao, Yong-chuan
    Mu, Hong-yuan
    Liu, Li-peng
    Dai, Chong-rui
    GEOMATICS NATURAL HAZARDS & RISK, 2023, 14 (01)
  • [5] An interval risk assessment method and management of water inflow and inrush in course of karst tunnel excavation
    Wang, Xintong
    Li, Shucai
    Xu, Zhenhao
    Li, Xiaozhao
    Lin, Peng
    Lin, Chunjin
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 92
  • [6] A Study of Potential Water-Sand Inrush Based on Physical Model Experiments and Numerical Simulations
    Qiu, Heming
    Zhu, Shuyun
    Duan, Haodong
    MINE WATER AND THE ENVIRONMENT, 2024, 43 (03) : 540 - 559
  • [7] Study of the Catastrophic Process of Water-Sand Inrush in a Deep Buried Stope with Thin Bedrock
    Li, Tao
    Tang, Yuesong
    Li, Lianghui
    Hu, Haoyu
    Li, Zheng
    He, Jiqing
    An, Bochao
    WATER, 2023, 15 (15)
  • [8] Experimental Study on Sand Inrush Hazard of Water-Sand Two-Phase Flow in Broken Rock Mass
    Xu, Junce
    Pu, Hai
    Chen, Jiarui
    Sha, Ziheng
    GEOFLUIDS, 2021, 2021
  • [9] Upward propagation of ground disturbance induced by water-sand inrush into a defective tunnel in a dual-stratum geological condition
    Shen, Zhifu
    Zhao, Yixin
    Lv, Yang
    Wang, Panpan
    Hu, Nan
    Shu, Fangzhi
    Gao, Hongmei
    Wang, Zhihua
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2025, 158
  • [10] Experiment Study of the Failure Mechanism and Evolution Characteristics of Water-Sand Inrush Geo-Hazards
    Liu, Qi
    Liu, Bo
    APPLIED SCIENCES-BASEL, 2020, 10 (10):