Experimental investigation on the performance of Cable-Girder anchorage structure of hybrid Cable-Stayed suspension bridges

被引:5
|
作者
Li, Gang [1 ]
Xiao, Lin [1 ]
Huang, Qisheng [1 ]
Pu, Liuchun [1 ]
Wei, Xing [1 ]
机构
[1] Southwest Jiaotong Univ, Sch Civil Engn, Dept Bridge Engn, Chengdu 610031, Peoples R China
基金
中国国家自然科学基金;
关键词
Hybrid cable-stayed suspension bridge; Anchor box cable-girder anchorage; Specimen test; Bearing capacity; Stress evaluation; BEHAVIOR; ZONES;
D O I
10.1016/j.istruc.2023.104911
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
As the key component of the stay cable connecting the girder and tower in the hybrid cable-stayed suspension system, the cable anchorage structure needs to bear the powerful cable force transmission function. Compared with normal anchorages, the structural features of a new type of anchor box structure cable-girder anchorage (CGA) that has strong bearing capacity and more uniform stress distribution for a long-span hybrid cable-stayed suspension bridge with steel box girder was investigated by a 1:2 scale specimen test and a series of finite -element analysis. Through finite element analysis (FEA) and test results, the stress distribution and cable load transfer pathway of anchor box structure are obtained. The test results show that the CGA design is reasonable and reliable. The four welds connected to the anchor box support plates and the steel box girder webs bear 87% of the cable force load transfer, and the remaining 13% of the cable load is delivered from the anchor box bearing plate to webs. A large stress concentration in the six welds, but the maximum von Mises stress (VMS) of welds is 130-151 MPa. According to the parametric studies,the installation angle of the anchor box considerably affects the stress characteristics. Also, the thickness and length of the anchor box plate are changed, the transmission and distribution proportion of the cable force between the main welds of the anchor box increase alternately.
引用
收藏
页数:17
相关论文
共 50 条
  • [31] CABLE-STAYED BRIDGES
    GOLUB, H
    CIVIL ENGINEERING, 1971, 41 (08): : 43 - &
  • [32] Research for Cable-girder Coupled Vibration of a Cable-stayed Bridge Based on Finite Element Analysis
    Chen Weizhen
    Zhao Yang
    Zheng Yong
    2014 7TH INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION (ICICTA), 2014, : 968 - 971
  • [33] Cable vibrations in cable-stayed bridges
    Virlogeux, M
    BRIDGE AERODYNAMICS, 1998, : 213 - 233
  • [34] CABLE-STAYED BRIDGES
    PODOLNY, W
    ENGINEERING JOURNAL-AMERICAN INSTITUTE OF STEEL CONSTRUCTION INC, 1974, 11 (01): : 1 - 11
  • [35] Analysis on bearing safety of anchorage zone between girder and cable in cable-stayed bridge
    Wei, X
    Li, XZ
    Li, J
    Qiang, SZ
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL V, PTS A AND B, 2005, 5 : 1523 - 1528
  • [36] Study on Fatigue Behavior of Anchorage of Cable and Girder of Long Span Cable-Stayed Bridge
    刘庆宽
    强士中
    张强
    Journal of Southwest Jiaotong University, 2001, (01) : 42 - 49
  • [37] Analysis of Vertical Temperature Gradients and Their Effects on Hybrid Girder Cable-Stayed Bridges
    Tan, Hongmei
    Qian, Dacheng
    Xu, Yan
    Yuan, Mofang
    Zhao, Hanbing
    SUSTAINABILITY, 2023, 15 (02)
  • [38] Effect of Flexural Stiffness of Stiffening Girder on Mechanical Performance of Hybrid Cable-Stayed Suspension Bridge
    He D.
    Xiao H.
    Fu Z.
    Pan T.
    Qiu Y.
    Bridge Construction, 2023, 53 : 65 - 71
  • [39] EXPERIMENTAL AND THEORETICAL INVESTIGATION ON NONLINEAR BEHAVIOR OF CABLE-STAYED BRIDGES
    Michon, Guilhem
    Berlioz, Alain
    Lamarque, Claude-Henri
    PROCEEDINGS OF ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, VOL 4, PTS A-C, 2010, : 813 - 819
  • [40] Hybrid seismic protection of cable-stayed bridges
    Jung, HJ
    Park, KS
    Spencer, BF
    Lee, IW
    EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 2004, 33 (07): : 795 - 820