Experimental investigation on the performance of Cable-Girder anchorage structure of hybrid Cable-Stayed suspension bridges

被引:5
|
作者
Li, Gang [1 ]
Xiao, Lin [1 ]
Huang, Qisheng [1 ]
Pu, Liuchun [1 ]
Wei, Xing [1 ]
机构
[1] Southwest Jiaotong Univ, Sch Civil Engn, Dept Bridge Engn, Chengdu 610031, Peoples R China
基金
中国国家自然科学基金;
关键词
Hybrid cable-stayed suspension bridge; Anchor box cable-girder anchorage; Specimen test; Bearing capacity; Stress evaluation; BEHAVIOR; ZONES;
D O I
10.1016/j.istruc.2023.104911
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
As the key component of the stay cable connecting the girder and tower in the hybrid cable-stayed suspension system, the cable anchorage structure needs to bear the powerful cable force transmission function. Compared with normal anchorages, the structural features of a new type of anchor box structure cable-girder anchorage (CGA) that has strong bearing capacity and more uniform stress distribution for a long-span hybrid cable-stayed suspension bridge with steel box girder was investigated by a 1:2 scale specimen test and a series of finite -element analysis. Through finite element analysis (FEA) and test results, the stress distribution and cable load transfer pathway of anchor box structure are obtained. The test results show that the CGA design is reasonable and reliable. The four welds connected to the anchor box support plates and the steel box girder webs bear 87% of the cable force load transfer, and the remaining 13% of the cable load is delivered from the anchor box bearing plate to webs. A large stress concentration in the six welds, but the maximum von Mises stress (VMS) of welds is 130-151 MPa. According to the parametric studies,the installation angle of the anchor box considerably affects the stress characteristics. Also, the thickness and length of the anchor box plate are changed, the transmission and distribution proportion of the cable force between the main welds of the anchor box increase alternately.
引用
收藏
页数:17
相关论文
共 50 条
  • [21] Bridges - Hybrid span combines suspension, cable-stayed systems
    Brown, Jeff L.
    CIVIL ENGINEERING, 2006, 76 (09): : 16 - 17
  • [22] Effects of coupling vibration between girder and cable on performance of nonlinear cable dampers for cable-stayed bridges
    Liang, Dong
    Chen, Shun-Wei
    Kong, Dan-Dan
    Zhao, Xin
    Gongcheng Lixue/Engineering Mechanics, 2012, 29 (09): : 237 - 244
  • [23] Optimum design analysis of hybrid cable-stayed suspension bridges
    Lonetti, P.
    Pascuzzo, A.
    ADVANCES IN ENGINEERING SOFTWARE, 2014, 73 : 53 - 66
  • [24] Investigation on mechanics performance of cable-stayed-suspension hybrid bridges
    Zhang, Xin-Jun
    WIND AND STRUCTURES, 2007, 10 (06) : 533 - 542
  • [25] Effects and cause of coupling vibration between girder and cable on performance of cable dampers for cable-stayed bridges
    Liang, D. (ldhebut@gmail.com), 1600, Nanjing University of Aeronautics an Astronautics (34):
  • [26] Damping Effects of Cable Dampers on Girder Vibrations of Cable-Stayed Bridges
    Sae-Ma, P.
    Sun, L.
    Chen, L.
    Liu, Z.
    PROCEEDINGS OF THE 17TH EAST ASIAN-PACIFIC CONFERENCE ON STRUCTURAL ENGINEERING AND CONSTRUCTION, EASEC-17 2022, 2023, 302 : 1135 - 1145
  • [28] Dynamic investigation of a hybrid suspension and cable-stayed bridge
    Paultre, P
    Proulx, J
    Bégin, T
    EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 2000, 29 (05): : 731 - 739
  • [29] PARAMETRIC INVESTIGATION OF CABLE-STAYED BRIDGES
    HEGAB, HIA
    JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1988, 114 (08): : 1917 - 1928
  • [30] Fatigue Performance of Butt-Welded Tensile Plate Cable-Girder Anchorages of Long-Span Cable-Stayed Steel Box Girder Railway Bridges
    Shi, Zhou
    Sun, Zhitao
    Yang, Shili
    Zhou, Kaixuan
    JOURNAL OF BRIDGE ENGINEERING, 2021, 26 (01)