Study on collapse mechanism and treatment measures of portal slope of a high-speed railway tunnel

被引:2
|
作者
Hu, Guoping [1 ]
Xia, Yingzhi [1 ]
Zhong, Lianggen [2 ]
Ruan, Xiaoxue [1 ]
Li, Hui [1 ]
机构
[1] Henan Univ Urban Construct, Sch Civil & Transportat Engn, Rd Bridge & River Crossing Engn, Pingdingshan 467036, Henan, Peoples R China
[2] Changjiu Interc Railway Co Ltd, Nanchang 330002, Jiangxi, Peoples R China
关键词
field monitoring; finite element method; open cut tunnel; rainfall; slope deformation; stabilization treatment; RAINFALL-INDUCED LANDSLIDE; PROGRESSIVE FAILURE; EXCAVATION; ZONE;
D O I
10.12989/gae.2023.32.1.111
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The slope of an open cut tunnel is located above the exit of the Leijia tunnel on the Changgan high-speed railway. During the excavation of the open cut tunnel foundation pit, the slope slipped twice, a large landslide of 92500 m3 formed. The landslide body and unstable slope body not only caused the foundation pit of the open cut tunnel to be buried and the anchor piles to be damaged but also directly threatened the operational safety of the later high-speed railway. Therefore, to study the stability change in the slope of the open cut tunnel under heavy rain and excavation conditions, a 3D numerical calculation model of the slope is carried out by Midas GTS software, the deformation mechanism is analyzed, anti-sliding measures are proposed, and the effectiveness of the anti-sliding measures is analyzed according to the field monitoring results. The results show that when rainfall occurs, rainwater collects in the open cut tunnel area, resulting in a transient saturation zone on the slope on the right side of the open cut tunnel, which reduces the shear strength of the slope soil; the excavation at the slope toe reduces the anti-sliding capacity of the slope toe. Under the combined action of excavation and rainfall, when the soil above the top of the anchor pile is excavated, two potential sliding surfaces are bounded by the top of the excavation area, and the shear outlet is located at the top of the anchor pile. After the excavation of the open cut tunnel, the potential sliding surface is mainly concentrated at the lower part of the downhill area, and the shear outlet moves down to the bottom of the open cut tunnel. Based on the deformation characteristics and the failure mechanism of the landslides, comprehensive control measures, including interim emergency mitigation measures and long-term mitigation measures, are proposed. The field monitoring results further verify the accuracy of the anti-sliding mechanism analysis and the effectiveness of anti-sliding measures.
引用
收藏
页码:111 / 123
页数:13
相关论文
共 50 条
  • [41] Comprehensive Evaluation of Operating Speeds for High-Speed Railway: A Case Study of China High-Speed Railway
    Zhang, Jiamin
    Zhang, Jiarui
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [42] Lubrication mechanism in gearbox of high-speed railway trains
    Deng, Xingqiao
    Wang, Shisong
    Wang, Shike
    Wang, Jie
    Liu, Yucheng
    Dou, Yangqing
    He, Ge
    Qian, Linmao
    JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING, 2020, 14 (04)
  • [43] The Research on Emergence Mechanism of High-Speed Railway Accident
    Wang, Yanhui
    Xiao, Xuemei
    Cui, Hao
    NEW TRENDS AND APPLICATIONS OF COMPUTER-AIDED MATERIAL AND ENGINEERING, 2011, 186 : 116 - 120
  • [44] COLLABORATIVE MECHANISM OF HIGH-SPEED RAILWAY DISPATCHING SYSTEM
    Peng, Qiyuan
    Wen, Chao
    Jiang, Chaozhe
    Wei, Yanling
    INTELLIGENT AUTOMATION AND SOFT COMPUTING, 2014, 20 (04): : 637 - 649
  • [46] Analysis on the Influence of Cross Tunnel Construction on the Deformation of the Existing High-Speed Railway Tunnel
    Pan W.
    Gao Z.
    Zheng C.
    Gong Z.
    Geotechnical and Geological Engineering, 2018, 36 (6) : 4001 - 4013
  • [47] Mechanical characteristics of twin tunnel underneath construction on existing high-speed railway tunnel
    Fei, Ruizhen
    Peng, Limin
    Zhang, Chunlei
    Zhang, Jiqing
    Zhang, Peng
    ARCHIVES OF CIVIL ENGINEERING, 2023, 69 (01) : 403 - 420
  • [48] Experimental study and treatment measure of track-uplift disease caused by water pressure in high-speed railway tunnel
    Li L.
    Yang J.
    Wang S.
    Wu J.
    Wang Z.
    Xiang M.
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2022, 53 (04): : 1341 - 1351
  • [49] Mechanism of High-Speed Railway Interference on Power Cables of Adjacent Normal-Speed Railway
    Xie S.
    Sun J.
    Luo B.
    Su P.
    Li J.
    Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2021, 56 (01): : 206 - 213
  • [50] Attenuation and distortion of a compression wave propagating in a high-speed railway tunnel
    Mashimo, Sh.
    Nakatsu, E.
    Aoki, T.
    Matsuo, K.
    Nippon Kikai Gakkai Ronbunshu, B Hen/Transactions of the Japan Society of Mechanical Engineers, Part B, 1996, 62 (597): : 1847 - 1854