Study on collapse mechanism and treatment measures of portal slope of a high-speed railway tunnel

被引:2
|
作者
Hu, Guoping [1 ]
Xia, Yingzhi [1 ]
Zhong, Lianggen [2 ]
Ruan, Xiaoxue [1 ]
Li, Hui [1 ]
机构
[1] Henan Univ Urban Construct, Sch Civil & Transportat Engn, Rd Bridge & River Crossing Engn, Pingdingshan 467036, Henan, Peoples R China
[2] Changjiu Interc Railway Co Ltd, Nanchang 330002, Jiangxi, Peoples R China
关键词
field monitoring; finite element method; open cut tunnel; rainfall; slope deformation; stabilization treatment; RAINFALL-INDUCED LANDSLIDE; PROGRESSIVE FAILURE; EXCAVATION; ZONE;
D O I
10.12989/gae.2023.32.1.111
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The slope of an open cut tunnel is located above the exit of the Leijia tunnel on the Changgan high-speed railway. During the excavation of the open cut tunnel foundation pit, the slope slipped twice, a large landslide of 92500 m3 formed. The landslide body and unstable slope body not only caused the foundation pit of the open cut tunnel to be buried and the anchor piles to be damaged but also directly threatened the operational safety of the later high-speed railway. Therefore, to study the stability change in the slope of the open cut tunnel under heavy rain and excavation conditions, a 3D numerical calculation model of the slope is carried out by Midas GTS software, the deformation mechanism is analyzed, anti-sliding measures are proposed, and the effectiveness of the anti-sliding measures is analyzed according to the field monitoring results. The results show that when rainfall occurs, rainwater collects in the open cut tunnel area, resulting in a transient saturation zone on the slope on the right side of the open cut tunnel, which reduces the shear strength of the slope soil; the excavation at the slope toe reduces the anti-sliding capacity of the slope toe. Under the combined action of excavation and rainfall, when the soil above the top of the anchor pile is excavated, two potential sliding surfaces are bounded by the top of the excavation area, and the shear outlet is located at the top of the anchor pile. After the excavation of the open cut tunnel, the potential sliding surface is mainly concentrated at the lower part of the downhill area, and the shear outlet moves down to the bottom of the open cut tunnel. Based on the deformation characteristics and the failure mechanism of the landslides, comprehensive control measures, including interim emergency mitigation measures and long-term mitigation measures, are proposed. The field monitoring results further verify the accuracy of the anti-sliding mechanism analysis and the effectiveness of anti-sliding measures.
引用
收藏
页码:111 / 123
页数:13
相关论文
共 50 条
  • [31] Underwater Acoustic Characteristics of High-Speed Railway Subsea Tunnel
    Hou, Bowen
    Zeng, Qine
    Li, Jiajing
    JOURNAL OF COASTAL RESEARCH, 2020, : 43 - 46
  • [32] Mechanical Analysis of Secondary Lining of High-Speed Railway Tunnel
    Zhang, Ningning
    Fang, Qian
    Li, Yue
    Zhang, Dingli
    KSCE JOURNAL OF CIVIL ENGINEERING, 2018, 22 (07) : 2384 - 2389
  • [33] Research of Train Wind Characteristics in High-Speed Railway Tunnel
    Fei, Ruizhen
    Peng, Limin
    Yang, Weichao
    Yan, Weiguang
    ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 865 - 868
  • [34] Influence of blockage ratio on slipstreams in a high-speed railway tunnel
    Li, Wenhui
    Liu, Tanghong
    Martinez-Vazquez, Pedro
    Chen, Zhengwei
    Huo, Xiaoshuai
    Guo, Zijian
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 115
  • [35] Propagation characteristics of compression wave in a high-speed railway tunnel
    Iyer, Rohit Sankaran
    Kim, Dong Hyeon
    Kim, Heuy Dong
    PHYSICS OF FLUIDS, 2021, 33 (08)
  • [36] Aerodynamic mechanism of a combined buffer hood for mitigating micro-pressure waves at the 400 km/h high-speed railway tunnel portal
    Li, Guo-Zhi
    Ye, Xin
    Deng, E.
    Yang, Wei-Chao
    Ni, Yi-Qing
    He, Hong
    Ao, Wai-Kei
    PHYSICS OF FLUIDS, 2023, 35 (12)
  • [37] Study on optimal design of disease prevention and control of tunnel bottom structure of high-speed railway tunnel
    Wang, Gexin
    Journal of Railway Science and Engineering, 2022, 19 (08) : 2133 - 2142
  • [38] Study on the Mechanical Behavior of Lining Structure for Underwater Shield Tunnel of High-Speed Railway
    Feng, Kun
    He, Chuan
    Fang, Yong
    Jiang, Yingchao
    ADVANCES IN STRUCTURAL ENGINEERING, 2013, 16 (08) : 1381 - 1399
  • [39] Numerical study of attenuation and distortion of a compression wave propagating in a high-speed railway tunnel
    Matsuo, K
    Aoki, T
    Kashimura, H
    Mashimo, S
    Nakao, S
    COMPUTERS IN RAILWAYS V, VOL 2: RAILWAY TECHNOLOGY AND ENVIRONMENT, 1996, : 23 - 32
  • [40] Field test and theoretical study of rock resistant coefficient in high-speed railway tunnel
    Li Bo
    Wu Li
    Deng Zong-wei
    Chen Jian
    Tang Ai-song
    ROCK AND SOIL MECHANICS, 2015, 36 (02) : 532 - 540