Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem

被引:0
|
作者
王宏 [1 ]
李同玲 [1 ]
林丹 [1 ]
机构
[1] School of Sciences,Tianjin University
关键词
project management; resource constrained; scheduling; genetic algorithm;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper presents a new genetic algorithm for the resource-constrained project scheduling problem(RCPSP).The algorithm employs a standardized random key(SRK) vector representation with an additional gene that determines whether the serial or parallel schedule generation scheme(SGS) is to be used as the decoding procedure.The iterative forward-backward improvement as the local search procedure is applied upon all generated solutions to schedule the project three times and obtain an SRK vector,which is reserved into population.Several evolutionary strategies are implemented including the elitist selection(the high quality solution set),and the selection of parents used in crossover operator.The computational experiments on 1 560 standard instances show that the proposed algorithm outperforms the current state-of-the-art heuristic algorithms for J30 and J60,and ranks the third for J120 with 50 000 schedules;it ranks the second for J30 and J60,and ranks the fifth for J120 with 5 000 schedules;it ranks the third,second,and fifth for J30,J60 and J120 with 1 000 schedules,respectively.It is demonstrated that the proposed algorithm is competitive for RCPSP,especially for larger number of schedules.
引用
收藏
页码:376 / 382
页数:7
相关论文
共 50 条
  • [31] A genetic algorithm for solving fuzzy resource-constrained project scheduling
    Wang, H
    Lin, D
    Li, MQ
    ADVANCES IN NATURAL COMPUTATION, PT 3, PROCEEDINGS, 2005, 3612 : 171 - 180
  • [32] Optimization of Resource-Constrained Multi-Project Scheduling Problem based on the genetic algorithm
    Shu, Xin
    Su, Qiang
    Wang, Qian
    Wang, Qiugen
    2018 15TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT (ICSSSM), 2018,
  • [33] A genetic algorithm for scheduling multimode resource-constrained project problem in the presence of preemptive resources
    Delgoshaei, Aidin
    Hanjani, Sepehr Esmaeili
    Nasiri, Amir Hossein
    JOURNAL OF PROJECT MANAGEMENT, 2019, 4 (03) : 195 - 212
  • [34] A decomposition-based genetic algorithm for the resource-constrained project-scheduling problem
    Debels, Dieter
    Vanhoucke, Mario
    OPERATIONS RESEARCH, 2007, 55 (03) : 457 - 469
  • [35] A Bi-population based genetic algorithm for the resource-constrained project scheduling problem
    Debels, D
    Vanhoucke, M
    COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2005, VOL 4, PROCEEDINGS, 2005, 3483 : 378 - 387
  • [36] Resource-Constrained Project Scheduling Problem with Flexible Work Profiles: A Genetic Algorithm Approach
    Ranjbar, M.
    Kianfar, F.
    SCIENTIA IRANICA TRANSACTION E-INDUSTRIAL ENGINEERING, 2010, 17 (01): : 25 - 35
  • [37] An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: The single mode case
    Kadri, Roubila Lilia
    Boctor, Fayez F.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 265 (02) : 454 - 462
  • [38] Resource-constrained project scheduling problem with reworking
    Liao Y.
    Lu Z.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774
  • [39] A matheuristic for the resource-constrained project scheduling problem
    Vanhoucke, Mario
    Coelho, Jose
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 319 (03) : 711 - 725
  • [40] A SURVEY ON THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
    OZDAMAR, L
    ULUSOY, G
    IIE TRANSACTIONS, 1995, 27 (05) : 574 - 586