Technical Breakthroughs in the Construction of TGP

被引:1
|
作者
Zhang Chaoran
机构
关键词
river closure; cutoff wall; high slope; steel lined reinforced concrete; temperature and pressure maintenance; asphalt concrete core wall; turbine generating units;
D O I
暂无
中图分类号
TV61 [水利枢纽工程];
学科分类号
081504 ;
摘要
The huge Three Gorges Project is technically complex. Quite a lot of technical breakthroughs have been made in such issues as river closure of the Grand Channel and the concrete construction of the cutoff wall, prompt concrete construction of the dam, high slope construction of the permanent shiplock, the large scale steel lined reinforced concrete penstocks of the power station, and the temperature and pressure maintenance of the spiral case, the asphalt concrete core wall, the metal works of the shiplock, and turbine generating units.
引用
收藏
页码:8 / 14 +98
页数:8
相关论文
共 50 条
  • [31] Structural biology revolution led by technical breakthroughs in cryo-electron microscopy
    尹长城
    Chinese Physics B, 2018, 27 (05) : 53 - 62
  • [32] How can we achieve gender breakthroughs in nuclear negotiations and technical cooperation?
    Dalaqua, Renata H.
    IAEA Bulletin, 2021, 62 (04): : 27 - 29
  • [33] Structural biology revolution led by technical breakthroughs in cryo-electron microscopy
    Yin, Chang-Cheng
    CHINESE PHYSICS B, 2018, 27 (05)
  • [34] Technical Challenges and Breakthroughs in the Development of High-Efficiency DC-TENGs
    Abdelrahim, Mohamed O.
    Lee, Lini
    2024 IEEE 15TH CONTROL AND SYSTEM GRADUATE RESEARCH COLLOQUIUM, ICSGRC 2024, 2024, : 164 - 169
  • [35] Research on deformation mechanism of division pier at the head of three shiplocks of TGP during construction
    Dai, Zhenlong
    Fu, Bingqing
    Zhou, Ruo
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2001, 20 (05): : 747 - 749
  • [36] Supervision control on RCC construction of training wall of TGP's left bank powerhouse
    Cheng, Yi-Yun
    Li, Kai-Xue
    Renmin Changjiang/Yangtze River, 2002, 33 (10):
  • [37] Problems and Breakthroughs of Teaching Team Construction in China's Higher Education
    Li Xiaoqin
    PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, VOLS I AND II, 2009, : 2149 - 2152
  • [38] Optimization of protection embankment lines of Fulin City emigration project arising from construction of the TGP
    Liao, HS
    Xu, WL
    Liu, XN
    Fang, D
    HYDRODYNAMICS: THEORY AND APPLICATIONS, VOLS 1 AND 2, 1996, : 1173 - 1178
  • [39] Excavation and anchoring treatment on f1096 fault at TGP's shiplock construction site
    Wu, Xiao-Long
    Renmin Changjiang/Yangtze River, 2003, 34 (09):
  • [40] Ontology construction for technical domains
    Benjamin, J
    Borst, P
    Akkermans, H
    Wielinga, B
    ADVANCES IN KNOWLEDGE ACQUISITION, 1996, 1076 : 98 - 114