Distributed Cooperative Mechanism and Application for Monitoring of Urban Subway Construction

被引:0
|
作者
冯建中 [1 ]
白林燕 [2 ]
胡振琪 [1 ]
机构
[1] College of Resources and Safety Engineering,China University of Mining and Technology(Beijing)
[2] Institute of Remote Sensing Applications, China Academy of Science
关键词
CSCW; workflow; cooperative work; model; CISMUSC;
D O I
10.19884/j.1672-5220.2006.06.006
中图分类号
U231.6 [];
学科分类号
082302 ;
摘要
In this paper, combining the technologies of Computer Supported Cooperative Work (CSCW), Workflow and Network, the authors aim to organize virtual distributed cooperative work environment (VDCWE) and expound the running mechanism of cooperative workflow and design its algorithm for monitoring of urban subway construction. And then a prototype system was built based on the above, capable of supporting user analyzing, dealing with and managing data of monitoring, and real-timely releasing corresponding information, providing interactive virtual and distributed coordination meet-environment, dynami-cally and transparently, in favor of clients’ interoperability and solving practicing problems, and so on.
引用
收藏
页码:25 / 28 +32
页数:5
相关论文
共 50 条
  • [41] Empirical Research on the Correlation between Subway Station Superstructure Construction and Urban Development
    Wang, Xialu
    Wang, Tong
    Yan, Jianwei
    NEW URBAN CONFIGURATIONS, 2014, : 525 - 534
  • [42] Field Monitoring Analysis of Construction Process of Deep Foundation Pit at Subway Station
    Wang, Zhongchang
    Guo, Xinping
    Wang, Chuan
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2019, 37 (02) : 549 - 559
  • [43] Monitoring enabled distributed software construction method
    Liu D.-H.
    Guo C.-G.
    Wang H.-M.
    Wang T.
    Ruan Jian Xue Bao/Journal of Software, 2011, 22 (11): : 2610 - 2624
  • [44] Field Monitoring Analysis of Construction Process of Deep Foundation Pit at Subway Station
    Zhongchang Wang
    Xinping Guo
    Chuan Wang
    Geotechnical and Geological Engineering, 2019, 37 : 549 - 559
  • [45] A distributed lifetime guaranteed mechanism in cooperative personal networks
    Shi, Huaizhou
    Prasad, R. Venkatesha
    Niemegeers, I. G. M. M.
    Xu, Ming
    COMPUTERS & ELECTRICAL ENGINEERING, 2013, 39 (02) : 629 - 639
  • [46] Application of 3D Geological Model in Subway Construction in Singapore
    Wu, Shifan
    Pan, Xiaohua
    Qi, Xiaohui
    Chiam, Kiefer
    Goh, Kok Hun
    Chu, Jian
    GEO-CONGRESS 2022: DEEP FOUNDATIONS, EARTH RETENTION, AND UNDERGROUND CONSTRUCTION, 2022, 332 : 496 - 504
  • [47] Co-store: A distributed cooperative storage mechanism
    Wei, QS
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2004, : 2770 - 2774
  • [48] GROUT APPLICATION STATUS AND PROSPECT IN CHINESE SUBWAY CONSTRUCTION BY SHIELD METHOD
    Zhang, Fengchun
    Liang, Li
    Sha, Chengman
    Zhu, Shunyi
    NEW DEVELOPMENT IN ROCK MECHANICS AND ENGINEERING (NDRM2012), 2013, : 175 - 180
  • [49] Safety monitoring and warning system for subway construction workers using wearable technology
    Chen J.
    Wang D.
    Sun C.
    Recent Advances in Computer Science and Communications, 2021, 14 (03) : 753 - 759
  • [50] Application Research of BIM Technology in Subway Power Supply and Distribution Construction
    Dang, JiaoTe
    Zou, Chao
    6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455